Normally, the government or a local autonomous entity selects urban railway(subway, light rail transits etc.) system after investigating logicality about a route and announcing officially for people's convenience if the system is decided, suppliers of equipment(train, transformer, trolly wire, signal, communication, PSD, AFC etc.) are selected and ordering go forward. Stabilization of a total system is need for smooth train operation before opening to traffic by design, installation, total trial operation So, a measure against interface disharmony between each equipment is need. This treatise deals with the systematic method of management and items for interface plan from system design to opening on the evidence of experience of Gwangju subway total interface.
Proceedings of the Korean Information Science Society Conference
/
2006.10c
/
pp.575-580
/
2006
인터넷 네트워크에 존재하는 방화벽(Firewall) 또는 라우터(Router) 장비에서의 패킷 필터 기능은 모든 방화벽 장비의 기본적인 기능이 될 수 있다. 하지만 최근에 등장한 세션기반의 악의적 침입과 바이러스의 출현으로 패킷 필터기는 단순한 정적 패킷 필터 기능이 아닌 상태기반 패킷 필터의 동적 패킷 필터 기능을 요구하게 되었다. 또한 최근에 인터넷 속도가 급증하는 환경변화에 맞추어 방화벽 장비의 TCP 패킷 처리기능은 매우 빠른 처리속도를 요구하고 있다. 이에 우리는 매우 빠른 고속의 TCP 상태기반 패킷 필터 처리를 요구하는 에지(Edge)급 라우터의 방화벽 옵션카드를 만들기 위해 하드웨어 기반의 TCAM(Ternary CAM) 관리를 이용한 TCP 세션 상태기반 (Stateful) 패킷 필터기를 구현하였으며, TCAM 제어와 패킷의 상태기반 검사 등 모든 기능처리는 FPGA(Field Programmable Gate Array)를 이용한 하드웨어 로직(Logic) 및 상태기(State Machine)로 구현하였다. 그리고 본 논문의 구현방식을 적용한 방화벽 옵션카드는 인-라인(In-line) 모드로 구성될 경우 1GHz 이상의 Wire Speed를 만족하는 처리성능을 보여주었다.
Seo, Hun Chul;Han, Joon;Choi, Sun Kyu;Lee, Byung Sung;Rhee, Sang Bong;Kim, Chul Hwan
Journal of Electrical Engineering and Technology
/
v.11
no.1
/
pp.167-174
/
2016
The Korean distribution line currently consists of overhead ground wires (OHGW), overhead distribution lines, neutral wires (NW), and messenger wires (MW). The MW is installed under the NW. The lightning protection system in Korea is focused on OHGW and lightning arrester and the MW are not considered. Therefore, this paper proposes the applicability of MW for purpose of lightning protection. For this, we analyzed the effects of lightning overvoltage according to the existence of OHGW and MW and the grounding conditions of the MW in the Korean distribution system. The grounding conditions of the MW that we took into consideration were the common or separate grounding of the MW and NW. The analysis based on the equivalent circuit of the distribution pole at each condition was performed. The distribution lines and lightning were modeled using the Electromagnetic Transients Program (EMTP). For each of the installation conditions of the OHGW and MW, the various lightning conditions were simulated and analyzed for both direct and indirect lightning. The simulation results showed that, if the OHGW was not installed in the Korean distribution system, the lightning overvoltage could be reduced by the common grounding of the MW and NW.
Kim, In-Soo;Han, Woong;Yeo, Sang-Min;Kim, Chul-Hwan;Weon, Bong-Ju;Lim, Yong-Hun
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.3
/
pp.431-436
/
2009
As the telecommunication lines bring into widespread use, one of the most important aspects related to power distribution systems is effectively to evaluate the effect on the telecommunication lines from power lines. One of the efficient methods to evaluate the effect is to measure the induced voltage of a telecommunication line as a result of a ground-loop. If the power lines cause high induced voltage, the ground reference in the telecommunication lines is no longer a stable potential, so signals may ride on the noise. A ground loop is common wiring conditions where a ground current may take more than one path to return to the grounding electrode at the arrangement between the power lines and telecommunication lines. When a multi-path connection between the power lines and telecommunication line circuits exists, the resulting arrangement is known as a ground loop. Whenever a ground loop exists, there are potential for damages or abnormal operations of the telecommunication lines. The power lines can induce the voltage on the communication line. The effects can be calculated by considering the inductances and capacitances. However, if we assume that there are only power lines, it doesn't have a practical meaning because there are conductors with other purpose in the neighborhood of the lines. If we consider that case, we need more complex system. Therefore we suggest more complex system considering the conductors with other purpose in the neighborhood of the lines. The neutral wires and the overhead ground wires are considered for calculating the induced voltage. We assume that there are the messenger wires beside the power line as a result of increased use of them. The main purpose of this paper is a study on a shielding effect of messenger wires in the distribution lines. EMTP(Electro-Magnetic Transients Program) program is used for the induced voltage calculation.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.05a
/
pp.505-508
/
2016
In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace lines with high power impulse injection. Our proposed method uses to trace lines with very small power high frequency signal injection. Simulation models for 3-phase power transformers, 3-phase wire lines, and customer loads are described to investigate the transmission characteristics of high frequency power line carrier. Distribution lines have only a limited ability to carry higher frequencies. Typically power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.
Park Young-Min;Ryu Han-Seong;Lee Hyun-Won;Lee Se-Hyun;Lee Chung-Dong;Yoo Jl-Yoon
The Transactions of the Korean Institute of Power Electronics
/
v.9
no.6
/
pp.620-627
/
2004
As h-bridge multilevel inverter is connected with series of single phase power cell, so it obtain high voltage using low voltage power semi-conductor and output voltage similar to sine wave. In this topology, the number of power cell increases in proportion to the output voltage level. Therefore, there are drawbacks that are responsibility against operating ability of main controller and signal wire increase. However, we can overcome this problems by the substitution of serial communication for the PWM signal in power cell control. Additionally, it has merits of reliability and maintenance. This paper deals with the synchronization and phase-shift method of power cell PWM using CAN(Controller Area Network) communication interrupt in H-bridge multilevel inverter. The advantages of proposed method are signal-line simplification using serial communication between main controller and cell controller, burden reduction in main controller, modularization of power cell, easy protection of each power cell, expandability improvement and reliability increase of control signal and power cell. This paper establishes propriety and reliability of proposed method through experiment of 13-level H-bridge multilevel inverter.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.2
/
pp.71-79
/
2008
High voltage distribution lines in the electric railway system placed according track with communication lines and signal equipments. Case of the over head lines is occurrence the many fault because lightning, rainstorm, damage from the sea wind and so on. According this fault caused protection device to wrong operation. One line ground fault that occurs most frequently in railway high voltage distribution lines and sort of faults is line short, three line ground breaking of a wire, and so on. For this reason we need precise maintenance for prevent of the faults. The most important is early detection and fast restoration in time of fault for a safety transit. In order to develop an advanced fault location device for 22.9[kV] distribution power network in electric railway system this paper deals with new fault locating algorithm using flow technique which enable to determine the location of the fault accurately. To demonstrate its superiorities, the case studies with the algorithm and the fault analysis using PSCAD/EMTDC (Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) were carried out with the models of direct-grounded 22.9[kV] distribution network which is supposed to be the grounding method for electric railway system in Korea.
Journal of the Korea Institute of Information and Communication Engineering
/
v.7
no.2
/
pp.228-238
/
2003
We believe that existing wire solutions such as HomePNA2.0 using phone lines and HomePlug using power line and wireless solution such as HomeRF are the most promising solutions, because of its cost-effectiveness. However, MAC protocols of these solutions provide only Class of Service(CoS) using priority mechanism like HomePNA and HomePlug or consider only voice among real-time traffics like HomeRF. For these reasons, we perceive the needs of the new MAC protocol which is no new wire solution and provides guaranteed Quality of Service (QoS) for not only voice but also video and audio. In light of this, we present the design and software implementation of a new MAC protocol for Home Networks. Our evaluation results of software implementation verify that proposed MAC protocol can provide low delay, low loss, and low jitter to real-time traffic by reserving bandwidth.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.28
no.11
/
pp.902-915
/
2017
In recent years, mobile devices have become increasingly multi-functional and high performance, resulting in a dramatical increase in processing speed. On the other hand, the size of device is reduced, circuits inside the device are more easily exposed to electromagnetic interference radiated from antenna or adjacent circuits, degrading the system performance. To prevent this, it is necessary to design the device considering the electromagnetic characteristics with EM simulation at the design stage of product. However, the EM simulation takes a long analysis time and require high-level system resources for fast analysis. In this paper, an equivalent circuit modeling method for a round wire is proposed using a PEEC method and the electromagnetic coupling from a dipole antenna to a transmission line is analyzed in frequency domain. And compared with the result of electromagnetic simulator. As a result, PEEC method shows good agreement with those of electromagnetic simulation, in a much more short time.
Journal of the Korea Society of Computer and Information
/
v.28
no.8
/
pp.103-109
/
2023
In this paper, we propose a smart wall switch based on IEEE 802.11b/g/n standard 2.4GHz band communication. As the 4th industrial era evolves, smart home solution development is actively underway, and application cases for smart wall switches are increasing. Most of the Chinese products that preoccupy the market through price competitiveness use Bluetooth and Zigbee communication switches. However, while ZigBee communication is low power, communication speed is slower than Bluetooth and network configuration through a separate hub is additionally required. The Bluetooth method has problems in that the communication range and speed are lower than Wi-Fi communication, the communication standby time is relatively long, and security is weak. In this study, an IEEE 802.11b/g/n smart wall switch applied with Wi-Fi communication technology was developed. In addition, through the two-wire structure, it is designed so that no additional cost is incurred through the construction of a separate neutral line in the building. The result of the study is more than 30% cheaper than the existing wall switch, so it is judged that it will be able to preoccupy the market not only in terms of technological competitiveness but also price competitiveness.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.