• Title/Summary/Keyword: WindPRO

Search Result 42, Processing Time 0.026 seconds

Study on the Power Performance on WindPRO Prediction in the Southeast Region of Jeju Island (제주 남동부 지역을 대상으로 한 WindPRO의 발전량 예측에 관한 연구)

  • Hyun, Seunggun;Kim, Keonhoon;Huh, Jongchul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.184.1-184.1
    • /
    • 2010
  • In order to research the way to evaluate wind resource without actual Met Mast data, this paper has been carried out on the southeastern region of Jeju island, Korea. Although wind turbine has been an economical alternative energy resource, misjudging the prediction of lifetime or payback period occurs because of the inaccurate assessment of wind resource and the location of wind turbine. Using WindPRO(Ver. 2.7), a software for wind farm design developed by EMD from Denmark, wind resources for the southeastern region of Jeju island was analyzed, and the performance of WindPRO prediction was evaluated in detail. Met Mast data in Su-san 5.5Km far from Samdal wind farm, AWS in Sung-san 4.5km far from Samdal wind farm, and Korea Wind Map data had been collected for this work.

  • PDF

Evaluation of the Performance on WindPRO Prediction (WindPRO의 예측성능 평가)

  • O, Hyeon-Seok;Go, Gyeong-Nam;Heo, Jong-Cheol
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.300-305
    • /
    • 2008
  • Using WindPRO that was software for windfarm design developed by EMD from Denmark, wind resources for the western Jeju island were analyzed, and the performance of WindPRO prediction was evaluated in detail. The Hansu site and the Yongdang site that were located in coastal region were selected, and wind data for one year at the two sites were analyzed using WindPRO. As a result, the relative error of the Prediction for annual energy Production and capacity factor was about ${\pm}20%$. For evaluating wind energy more accurately, it is necessary to obtain lots of wind data and real electric power production data from real windfarm.

  • PDF

Accuracy Assessment of Annual Energy Production Estimated for Seongsan Wind Farm (성산 풍력발전단지의 연간발전량 예측 정확도 평가)

  • Ju, Beom-Cheol;Shin, Dong-Heon;Ko, Kyung-Nam
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.2
    • /
    • pp.9-17
    • /
    • 2016
  • In order to examine how accurately the wind farm design software, WindPRO and Meteodyn WT, predict annual energy production (AEP), an investigation was carried out for Seongsan wind farm of Jeju Island. The one-year wind data was measured from wind sensors on met masts of Susan and Sumang which are 2.3 km, and 18 km away from Seongsan wind farm, respectively. MERRA (Modern-Era Retrospective Analysis for Research and Applications) reanalysis data was also analyzed for the same period of time. The real AEP data came from SCADA system of Seongsan wind farm, which was compare with AEP data predicted by WindPRO and Meteodyn WT. As a result, AEP predicted by Meteodyn WT was lower than that by WindPRO. The analysis of using wind data from met masts led to the conclusion that AEP prediction by CFD software, Meteodyn WT, is not always more accurate than that by linear program software, WindPRO. However, when MERRA reanalysis data was used, Meteodyn WT predicted AEP more accurately than WindPRO.

Evaluation of the Performance on WindPRO Prediction in the Northeast Region of Jeju Island (제주 북동부지역을 대상으로 한 WindPRO의 예측성능 평가)

  • Oh, Hyun-Seok;Ko, Kyung-Nam;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.2
    • /
    • pp.22-30
    • /
    • 2009
  • In order to clarify predictive accuracy for the wind resource predicted by running WindPRO(Ver. 2.5) which is software for wind farm design developed by EMD from Denmark, an investigation was carried out at the northeast region of Jeju island. The Hangwon, Susan and Hoichun sites of Jeju island were selected for this study. The measurement period of wind at the sites was for one year. As a result, when the sites had different energy roses, though the two Wind Statistics made by STATGEN module were used for the prediction, it was difficult to exactly predict the energy rose at a given site. On the other hand, when the two Wind Statistics were used to predict the average wind speed, the wind power density and the annual energy production, the relative error was under ${\pm}20%$ which improved more than that when using only one Wind Statistics.

Reliability assessment of ERA-Interim/MERRA reanalysis data for the offshore wind resource assessment (해상풍력자원 평가를 위한 ERA-Interim/MERRA 재해석 데이터 신뢰성 평가)

  • Byun, Jong-Ki;Son, Jin-Hyuk;Ko, Kyung-Nam
    • Journal of Power System Engineering
    • /
    • v.20 no.4
    • /
    • pp.44-51
    • /
    • 2016
  • An investigation on reliability of reanalysis wind data was conducted using the met mast wind data at four coastal regions, Jeju Island. Shinchang, Handong, Udo and Gangjeong sites were chosen for the met mast sites, and ERA-Interim and MERRA reanalysis data at two points on the sea around Jeju Island were analyzed for creating Wind Statistics of WindPRO software. Reliability of reanalysis wind data was assessed by comparing the statistics from the met mast wind data with those from Wind Statistics of WindPRO software. The relative error was calculated for annual average wind speed, wind power density and annual energy production. In addition, Weibull wind speed distribution and monthly energy production were analyzed in detail. As a result, ERA-Interim reanalysis data was more suitable for wind resource assessment than MERRA reanalysis data.

AEP Prediction of a Wind Farm in Complex Terrain - WindPRO Vs. WindSim (복잡지형에 위치한 풍력발전단지의 연간발전량 예측 비교 연구)

  • Woo, Jae-Kyoon;Kim, Hyeon-Gi;Kim, Byeong-Min;Gwon, Il-Han;Baek, In-Su;Yoo, Neung-Soo
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.6
    • /
    • pp.1-10
    • /
    • 2012
  • The annual energy production of Gangwon wind farm was predicted for three consecutive years of 2007, 2008 and 2009 using commercial programs, WindPRO and WindSim which are known to be used the most for wind resource prediction in the world. The predictions from the linear code, WindPRO, were compared with both the actual energy prediction presented in the CDM (Clean Development Mechanism) monitoring report of the wind farm and also the predictions from the CFD code, WindSim. The results from WindPRO were close to the actual energy productions and the errors were within 11.8% unlike the expectation. The reason for the low prediction errors was found to be due to the fact that although the wind farm is located in highly complex terrain, the terrain steepness was smaller than a critical angle($21.8^{\circ}$) in front of the wind farm in the main wind direction. Therefore no flow separation was found to occur within the wind farm. The flow separation of the main wind was found to occur mostly behind the wind farm.

A study on 750kW Wind farm at Taean Costal National Park using WindPRO (WindPRO를 이용한 태안해안국립공원의 750kW 풍력발전단지 조성에 관한 연구)

  • Jeong, Yunmi;Kim, Jaekwang;Kim, Youngdal
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.181.2-181.2
    • /
    • 2010
  • 탄소함유 에너지원의 고갈과 가격상승, 이들 에너지 사용에 수반되는 지구 온난화 문제들로 세계는 새로운 에너지원을 도입하고자 노력하고 있다. 그 중 풍력에너지는 자원이 풍부하고 끊임없이 재생되며 광범위한 지역에 분포되어 있고, 운전 중에 온실가스의 배출이 없다는 점에서 가장 경제성이 있고 유용한 에너지원으로 인식되고 있다. 풍력발전기는 선진 국가에서부터 꾸준히 성장해 왔으며, 그 성능을 개선시키기 위하여 많은 연구가 진행되고 있다. 풍력발전기를 설치하여 발전단지를 조성함에 있어서 발전량을 예측하기 위해서 발전기가 세워질 모든 지점에 허브높이의 실측타워를 세워 풍황데이터를 측정하여야 하지만 이런 방법은 재정적인 부담이 매우 크다. 따라서 본 논문에서는 서산기상대에서 측정된 기상데이터를 이용하여 태안해안국립공원내 만리포해수욕장 지역의 풍황 및 발전량을 예측하였다. 이 때 풍황 및 발전량 예측은 풍력단지 설계를 목적으로 사용되고 있는 WindPRO Basic과 WAsP-Interface 모듈을 이용하였다. 이렇게 예측된 풍황을 이용하여 발전단지를 조성하고, PARK 모듈을 사용하여 발전단지의 에너지를 계산하였으며, WindBANK 모듈을 이용하여 단지의 경제성을 평가하였다.

  • PDF

The Energy Production of Offshore Wind Farm Using WindPRO (WindPRO를 이용한 해상풍력단지 발전량 예측)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Kwak, Seung-Hun;Choi, Man-Su;Chang, Young-Hak
    • Proceedings of the KIPE Conference
    • /
    • 2010.11a
    • /
    • pp.267-268
    • /
    • 2010
  • 본 논문에서는 풍력발전단지 설계를 목적으로 사용되고 있는 EMD사의 WindPRO2.6을 이용하여 서남해안에 설치된 50m 높이의 Met mast에서 1년 동안 관측된 풍황자원을 분석하고, 특정 풍력발전기를 적용하여 40MW급 해상풍력발전단지를 설계했을 경우 연간 생산되는 발전량을 예측하였다.

  • PDF

Application of ERA-Interim Reanalysis Data for Onshore and Offshore Wind Resource Assessment (육·해상 풍력자원평가를 위한 ERA-Interim 재해석 데이터의 적용)

  • Byun, Jong-Ki;Ko, Kyung-Nam
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.2
    • /
    • pp.1-11
    • /
    • 2017
  • The investigation on reliability of ERA-Interim reanalysis wind data was conducted using wind data from the five met masts measured at inland and coastal areas, Jeju island. Shinchang, Handong, Udo, Susan and Cheongsoo sites were chosen for the met mast location. ERA-Interim reanalysis data at onshore and offshore twenty points over Jeju Island were analyzed for creating Wind Statistics using WindPRO software. Reliability of ERA-Interim reanalysis wind data was assessed by comparing the statistics from the met mast wind data with those predicted at the interest point using the Wind Statistics. The relative errors were calculated for annual average wind speed and annual energy production. In addition, the trend of the error was analyzed with distance from met mast. As a result, ERA-Interim reanalysis wind data was more suitable for offshore wind resource assessment than onshore.

Review on Wind Mapping Service of Wind Resource Consulting Companies (해외 풍력자원 컨설팅사의 바람지도 서비스 분석)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung
    • New & Renewable Energy
    • /
    • v.6 no.2
    • /
    • pp.12-18
    • /
    • 2010
  • This paper reviews commercial wind mapping services provided by the oversea consulting companies, AL-PRO and anemos in Germany, AWS Truepower and 3TIER in USA. They provide quick-to-use but essential dataset for a preliminary assessment before commencing an actual feasibility study for wind farm development. Details of wind mapping method, mapresolution, data extraction height, price and so forth are compared and fresh service contents such as site analysis report are drawn from the comparison. Despite its public service, the objective value of the Renewable Energy Resource Map System of Korea Instistute of Energy Research is also confirmed and it is anticipated that the drawn new content idea will be ported to the system to enrich its applicability.