• Title/Summary/Keyword: Wind turbine production

Search Result 127, Processing Time 0.026 seconds

Evaluation of Energy Production for a Small Wind Turbine Installed in an Island Area (도서지역 소형풍력발전기 에너지 발생량 평가)

  • Jang, Choon-Man;Lee, Jong-Sung;Jeon, Wan-Ho;Lim, Tae-Gyun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.24 no.6
    • /
    • pp.558-565
    • /
    • 2013
  • This paper presents how to determine AEP(Annual Energy Production) by a small wind turbine in DuckjeokDo island. Evaluation of AEP is introduced to make a self-contained island including renewable energy sources of wind, solar, and tidal energy. To determine the AEP in DuckjeokDo island, a local wind data is analyzed using the annual wind data from Korea Institute of Energy Research firstly. After the wind data is separated in 12-direction, a mean wind speed at each direction is determined. And then, a small wind turbine power curve is selected by introducing the capacity of a small wind turbine and the energy production of the wind turbine according to each wind direction. Finally, total annual wind energy production for each small wind turbine can be evaluated using the local wind density and local energy production considering a mechanical energy loss. Throughout the analytic study, it is found that the AEP of DuckjeokDo island is about 2.02MWh/y and 3.47MWh/y per a 1kW small wind turbine installed at the altitude of 10 m and 21m, respectively.

Operational Characteristics of Wind Turbine Generator Systems in Hangwon Wind Farm (행원 풍력발전단지에서 풍력발전시스템의 운전특성)

  • Ko, Kyung-Nam;Kang, Mun-Jong;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.1
    • /
    • pp.1-9
    • /
    • 2007
  • This paper reveals both the operational situation and the cause of the error occurred in wind turbine generator system of Hangwon wind farm in Jeju island. The four wind turbines were selected for this work, and the monitored period was for six months. Wind resource in the wind farm was analyzed, and the estimated energy production was compared with the actual energy production. As a result, with a decrease of system error, the estimated energy production was in good agreement with the actual energy production. The errors occurring in components such as gearbox and hydraulic motor affected the Availability of the wind turbine. Also, poor external conditions such as a strong wind, lightning and gust caused a standstill of wind turbines.

Effect of Wake on the Energy Production of the Downstream Wind Turbine (후류가 하류 풍력발전기의 발전량에 미치는 영향)

  • Hong, Young-Jin;Yoo, Hoseon
    • Plant Journal
    • /
    • v.12 no.3
    • /
    • pp.32-38
    • /
    • 2016
  • In this study, the effect of wake on the energy production of a downstream wind turbine was analyzed on the base of operation practices of wind farm in the coastal complex terrain which has 2 row array of wind turbines. And changes in the variation of wind speed and turbulence intensity was analyzed. In case wind turbines are spaced 4-rotor diameter-apart in the prevailing wind direction, reduction in energy production was confirmed due to the decrease of wind speed and the increase of turbulence intensity by wake. Especially a radical change of wind direction caused wind turbine a sudden stop and energy production significantly reduced. It is considered improvement of yaw brake can prevent the sudden stop and increase energy production.

  • PDF

Measured AEP Evaluations of a Small Wind Turbine using Measured Power Curve & Wind Data (측정 출력곡선과 기상자료를 이용한 소형 풍력발전기 연간 발전량 비교평가)

  • Kim, Seokwoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.6
    • /
    • pp.32-38
    • /
    • 2013
  • In an efforts to encourage renewable energy deployment, the government has initiated so called 1 million green homes program but the accumulated installation capacity of small wind turbine has been about 70kW. It can be explained in several ways such that current subsidy program does not meet public expectations, economic feasibility of wind energy is in doubt or acoustic emission is significant etc. The author investigated annual energy production of Skystream 3.7 wind turbine using measured power curve and wind resource data. The measured power curve of the small wind turbine was obtained through power performance tests at Wol-Ryoung test site. AEP(Annual Energy Production) and CF(Capacity Factor) were evaluated at selected locations with the measured power curve.

Wind Turbine Wake Model by Porous Disk CFD Model (다공 원반 CFD 모델을 이용한 풍력발전기 후류 해석 연구)

  • Shin, Hyungki;Jang, Moonseok;Bang, Hyungjun;Kim, Soohyun
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.68-74
    • /
    • 2013
  • Offshore wind farm is being increased since there are much trouble to develop onshore wind farm. But in the offshore, wind turbine wake does not dissipate less than onshore wind turbine because of low turbulence level. Thus this remained wake interacted to other wind turbine. This interaction reduces energy production in wind farm and have a bad influence on fatigue load of wind turbine. In this research, CFD model was constructed to analyze wake effect in offshore wind farm. A method that wind turbine rotor region was modelled in porous media was devised to reduce computation load and validated by comparison with Horns Rev measurement. Then wake interaction between two wind turbine was analyzed by devised porous model.

Probabilistic Production Cost Credit Evaluation of Wind Turbine Generators (풍력발전기의 확률론적 발전비용 절감기여도 평가)

  • Park, Jeong-Je;Wu, Liang;Choi, Jae-Seok;Cha, Jun-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2153-2160
    • /
    • 2008
  • This paper develops an algorithm for probabilistic production cost credit evaluation of wind turbine generators(WTG) with multi-state. Renewable energy resources such as wind, wave, solar, micro hydro, tidal and biomass etc. are becoming importance stage by stage because of considering effect of the environment. Wind energy is one of the most successful sources of renewable energy for the production of electrical energy. Case study demonstrates that the wind speed credit in view point of economics can be assessed by using the proposed methodology.

Prediction of Wind Power Generation at Southwest Coast of Korea Considering Uncertainty of HeMOSU-1 Wind Speed Data (HeMOSU-1호 관측풍속의 불확실성을 고려한 서남해안의 풍력 발전량 예측)

  • Lee, Geenam;Kim, Donghyawn;Kwon, Osoon
    • New & Renewable Energy
    • /
    • v.10 no.2
    • /
    • pp.19-28
    • /
    • 2014
  • Wind power generation of 5 MW wind turbine was predicted by using wind measurement data from HeMOSU-1 which is at south west coast of Korea. Time histories of turbulent wind was generated from 10-min mean wind speed and then they were used as input to Bladed to estimated electric power. Those estimated powers are used in both polynominal regression and neural network training. They were compared with each other for daily production and yearly production. Effect of mean wind speed and turbulence intensity were quantitatively analyzed and discussed. This technique further can be used to assess lifetime power of wind turbine.

Simulation Technique of Wind Turbine Dynamic Behavior using Multibody FEM Analysis (탄성 다물체 동역학 해석기법을 이용한 풍력터빈 드라이브트레인의 동특성 해석)

  • Lee, Seung-Kyu;Lim, Dong-Su;Park, Young-Su;Kim, Jin;Choi, Won-Ho
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.817-821
    • /
    • 2008
  • Wind turbine requires service life of about 20 years and each components of wind turbine requires high durability, because installation and maintenance costs are more expensive than generated electricity by wind turbine. So the design of wind turbine must be verified in various condition before production step. This paper demonstrates the application of a generic methodology, based on the flexible multibody simulation technique, for the dynamic analysis of a wind turbine and its drive train. The concern of the paper is the computation of dynamic loads of wind turbine in emergency-stop condition. The finite element model is used to analyse the dynamic behaviour of the wind turbine.

  • PDF

The Field Test of Power Performance Measurement for U50 Wind Turbine (U50 풍력발전기 출력성능 실증연구)

  • Hwang, Jin-Su;Jang, Seong-Tae;Kim, Dae-Hyun;Bang, Jo-Hyug;Ryu, Ji-Yune
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.372-375
    • /
    • 2007
  • 750kW gearless type wind turbine, named U50, is developed by UNISON in Korea. The newly developed wind turbine should be evaluated the power curve and the estimated annual energy production by following international standard to verify the power performance characteristics. This paper shows the test and evaluation procedure according to IEC 61400-12-1 which specifies a procedure of measuring the power performance characteristics of a single wind turbine and applies to the testing of wind turbines of all types and sized connected to the electrical power network. And this paper also shows the power performance characteristics for U50 wind turbine which is determined in accordance with IEC regulation.

  • PDF

Selection of Available Sector to Measure Power Generation for Validation of Wind Turbine Performance (풍력터빈 성능 검증을 위한 출력측정 유효영역 선정)

  • Oh, Ki-Yong;Jun, Hoon;Lee, Jun-Shin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.525-528
    • /
    • 2009
  • Power generation of wind turbine which is installed in wind farm should be measured to predict economic feasibility of wind farm. Also electric power company want to verify wind turbine performance which is stated by manufacturer. The International Electrotechnical Commission(IEC) published 61400-12-1 "Power performance measurements of electricity producing wind turbines" for test of wind turbine power performance. In this paper, measurable sector of wind speed is analysed based on IEC 61400-12-1 to verify power curve of wind turbine with various wind turbine in wind farm.

  • PDF