• Title/Summary/Keyword: Wind energy

Search Result 2,960, Processing Time 0.027 seconds

Wind Resource Assessment for Green Island - Dokdo (녹색섬 풍력자원평가 - 독도)

  • Kim, Hyun-Goo;Kim, Keon-Hoon;Kang, Young-Heaok
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.94-101
    • /
    • 2012
  • A Dokdo wind resource map has been drawn up for the Green Island Energy Master Plan according to Korea's national vision for 'Low Carbon Green Growth'. The micro-siting software WindSim v5.1,which is based on Computational Flow Analysis, is used with MERRA reanalysis data as synoptic climatology input data, and sensitivity analysis on turbulence model is accompanied. A wind resource assessment has been conducted for the Dokdo wind power dissemination plan, which consists of two 10kW wind turbines to be installed at the Dongdo dock and Dokdo guard building. It is evaluated that the capacity factors at Dongdo dock and Dokdo guard building are about 20% and 30% respectively, and annual and hourly variations of wind power generation have been analyzed, but summertime energy production is predicted to be only 40% of wintertime energy production.

Calibration Equation for Nacelle Anemometer Derived by LIDAR Measurements (라이다 측정을 이용한 나셀 풍속계 보정식 제안)

  • Kim, Hyun-Goo;An, Hae-Joon;Yang, Seung-Joo;Park, Woo-Jae;Kim, Seok-Woo
    • New & Renewable Energy
    • /
    • v.9 no.1
    • /
    • pp.12-16
    • /
    • 2013
  • The nacelle anemometer mounted behind the blade roots of a wind turbine measures distorted wind speed comparable with free-stream wind because of the wake effects caused dependent upon the operation of the wind turbine and the rotation of its blades. The field campaign was carried out to measure free-stream wind speed at a height identical to the height of the nacelle anemometer by deploying a ground-based remote-sensing equipment, LIDAR. It is derived that a third-order polynomial equation for correcting wind speed measured by the nacelle anemometer to undistorted free-stream wind speed incident to a wind turbine. It is anticipated that the derived correction equation enables wind speed measured by the nacelle anemometer to be used as a precise input for a wind turbine performance test and for developing an active control logic.

The Power Performance Testing for 3MW Wind turbine System (3MW 풍력발전시스템 출력성능평가에 관한 연구)

  • Ko, Suk-Whan;Jang, Moon-Seok;Park, Jong-Po;Lee, Yoon-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.4
    • /
    • pp.19-26
    • /
    • 2011
  • We are carried out power performance testing for 3MW wind turbine system at Je-ju wind turbine testing Site and analyzed measured data which was stored through monitoring system. In this paper, we described the power performance testing results and analyzed an uncertainty of measured data sets. The power curve with measured power data is closely coincide with designed power curve except for the low wind speed sections(4m/s~7m/s) and the annual energy production which is given Ray leigh distribution was included with 1.5~5.9% of uncertainty in the wind speed region as 4~11m/s. Although the deviation of curve between measured power and designed power is high, the difference of annual energy production is low in the low wind speed region.

Consideration on Pre-Feasibility Studies for Large-scale Offshore Wind Farms Led by Local Governments, Focusing on the Case of Shinan-gun (지자체 주도 대규모 해상풍력단지 사전 타당성 조사에 대한 고찰, 신안군 사례 중심으로)

  • Min Cheol Park;Ji Hoon Park;Gi Yun Lee;Chang Min Lee;Gwang Hyeok Yu;Hee Woong Jang;Hyun Sig Park
    • New & Renewable Energy
    • /
    • v.20 no.2
    • /
    • pp.65-70
    • /
    • 2024
  • The major challenge in promoting large-scale offshore wind power projects is securing local acceptance. Several recent studies have emphasized the crucial role of local governments in addressing this problem. However, local governments have difficulty in achieving clear results because of the lack of expertise and manpower in offshore wind power projects, making thempassive in promoting these initiatives. In this context, we briefly introduce the case of Shinan-gun, which recently successfully conducted a pre-feasibility study on a large-scale offshore wind power complex led by the local government.

Assessment of Wind Resource Around the Korean Peninsula by Using Marine Buoys Datasets (해상부이 데이터 분석을 통한 한반도 해역의 바람자원 평가)

  • Oh, Ki-Yong;Kim, Ji-Young;Lee, Jun-Shin
    • New & Renewable Energy
    • /
    • v.7 no.1
    • /
    • pp.15-21
    • /
    • 2011
  • In recent years, many countries have been endeavoring to exploit the offshore wind energy in terms of overcoming the limitations of on-land wind energy. Considering that mountains cover 70 percent of the Korean Peninsula and arable plains for wind energy are negligibly small, Korean government aggressively drives the offshore wind development of the Korean Peninsula. As part of preliminary investigation of offshore wind resources, KEPCO-RI (Korea Electric Power Corporation-Research Institute) has been analyzing marine buoy datasets measured at 5 positions over the period of 12 years, including estimation of extreme wind speed. It can be observed that variation of yearly wind speed, monthly wind speed as well as frequency distribution of wind direction. Wind classes of buoy sites are estimated by extrapolated average wind speed using log law. In addition, wind turbine class based on IEC code is assessed for evaluation of suitable wind turbine.

A study on comparing short-term wind power prediction models in Gunsan wind farm (군산풍력발전단지의 풍력발전량 단기예측모형 비교에 관한 연구)

  • Lee, Yung-Seop;Kim, Jin;Jang, Moon-Seok;Kim, Hyun-Goo
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.3
    • /
    • pp.585-592
    • /
    • 2013
  • As the needs for alternative energy and renewable energy increase, there has been a lot of investment in developing wind energy, which does not cause air pollution nor the greenhouse gas effect. Wind energy is an environment friendly energy that is unlimited in its resources and is possible to be produced wherever the wind blows. However, since wind energy heavily relies on wind that has unreliable characteristics, it may be difficult to have efficient energy transmissions. For this reason, an important factor in wind energy forecasting is the estimation of available wind power. In this study, Gunsan wind farm data was used to compare ARMA model to neural network model to analyze for more accurate prediction of wind power generation. As a result, the neural network model was better than the ARMA model in the accuracy of the wind power predictions.

Measurement and Analysis of Wind Energy Potential in Kokunsando of Saemankeum (새만금 고군산군도의 풍자원 측정 및 분석)

  • Shim, Ae-Ri;Choi, Yeon-Sung;Lee, Jang-Ho
    • New & Renewable Energy
    • /
    • v.7 no.2
    • /
    • pp.51-58
    • /
    • 2011
  • Saemankeum is well known for its high speed wind, and it is known that the blueprint of a future city around Saemankeum, including new industrial complex, has been planned. As a result, large-scale offshore wind farm, on the basis of the measurement of wind resource for a long time, can be considered, so that generated electricity can be used to meet the energy demand near the wind farm. Wind speed in Kokunsando of Saemankeum is measured and analyzed with its statistical distribution and wind directions. The probability of wind power resource over Kokunsando of Saemangeum is reviewed with the measured data in one island of Kokunsando. According to measured data, the shape and scale factor of Weibull distribution of wind speed are obtained, and then power density is analyzed as well. Through this study, it is clear that the Saemangeum area has a fluent and abundant wind power source to develop the wind farm in Korea.

Evaluation of Onshore Wind Resource Potential According to the Road Proximity (도로인접성에 따른 육상 풍력자원 잠재량 평가)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Kang, Yong-Heack;Yun, Chang-Yeol
    • New & Renewable Energy
    • /
    • v.9 no.4
    • /
    • pp.13-18
    • /
    • 2013
  • Wind turbines should generally be installed at a certain distance from a road to ensure passengers' safety. In Korea, there is no clear guidance as the Ministry of Environment first proposed a road setback distance of 400 m in the Onshore Wind Farm Siting Guidelines draft proposed in July 2012, and then modified it to 1.5 times the height of the wind turbine in October of the same year. This study analyzed the dynamic range of onshore wind resource potential according to how the road setback distance is set using the Korea Wind Atlas with 100m spatial resolution made by the Korea Institute of Energy Research, the transportation network of the Ministry of Construction and Transportation, and the forest road network of the Korea Forestry Service. Owing to the geographical characteristics of Korea, where mountainous terrain accounts for 70% of the total territory, the wind resource potential within 1 km from forest roads are estimated to be 14.3 GW, 14% of Korea's total wind resource potential. In addition, the construction distance of new road for transporting wind turbines from the existing road to a wind farm site is estimated as less than 2 km. Given the limited wind resource potential and geographical constraints, an assessment system that can maximize wind resource utilization and ensure road safety at the same time, and which takes into account the regional characteristics instead of applying the fixed road setback distance across-the-road, is required.

Demonstration of 10kw Wind Turbine System at the King Sejong Station (극한환경에서의 소형풍력발전 실증운전)

  • Kim, Seok-Woo;Kyong, Nam-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.4
    • /
    • pp.25-30
    • /
    • 2006
  • 10kW wind turbine has been successfully commissioned at the King Sejong station in April, 2006. The wind turbine installed is a part of the R&D program for developing a solid wind/diesel hybrid power control system for a remote area such as Antarctica. At the same time, the current research aims to develop an anti-icing and de-icing technologies for a small wind turbine rated under 50kW. Since its commissioning, the turbine has generated about 500kWh for 47days without any system faults. Although sufficient data have not been obtained yet, any trouble has not occurred in the wind/diesel hybrid system based on the current analysis. Concerning on the environmental impact by the wind turbine operation, the turbine is installed within the station boundary in order to meet the Madrid protocol. Therefore, wind turbine operation meets the international requirements for preservation of antarctic ecosystem.

Evaluation of the Performance on WindPRO Prediction (WindPRO의 예측성능 평가)

  • O, Hyeon-Seok;Go, Gyeong-Nam;Heo, Jong-Cheol
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.300-305
    • /
    • 2008
  • Using WindPRO that was software for windfarm design developed by EMD from Denmark, wind resources for the western Jeju island were analyzed, and the performance of WindPRO prediction was evaluated in detail. The Hansu site and the Yongdang site that were located in coastal region were selected, and wind data for one year at the two sites were analyzed using WindPRO. As a result, the relative error of the Prediction for annual energy Production and capacity factor was about ${\pm}20%$. For evaluating wind energy more accurately, it is necessary to obtain lots of wind data and real electric power production data from real windfarm.

  • PDF