• 제목/요약/키워드: Wind Turbine Test

검색결과 325건 처리시간 0.03초

다구찌 기법을 이용한 윈드실드 수직축 풍력 터빈의 기초 실험 연구 (Basic Experiment Using Taguchi method for Vertical Wind Turbine with Wind-shield)

  • 홍철현;서성호
    • 한국해양공학회지
    • /
    • 제25권3호
    • /
    • pp.85-89
    • /
    • 2011
  • This study aimed to develop a wind turbine system for the domestic wind environments. The Taguchi method was applied to obtain the optimal design for a wind turbine with a wind-shield. The design parameters were defined to look for the shape of the wind turbine. Optimal parameters were determined on the basis of the analyzed level averages of the characteristics. According to the test results to which the optimal parameters were applied, the rpm improved. It was also found that a windshield 3/4 the size contributes to improving the efficiency of existing turbines.

750 kW 풍력발전기의 소음 실증 (Noise Test and Evaluation of a 750 kW Wind Turbine Generator)

  • 김석현;김태형
    • 한국소음진동공학회논문집
    • /
    • 제16권2호
    • /
    • pp.124-131
    • /
    • 2006
  • This study introduces an environmental noise evaluation procedure for wind turbines(W/T) and the evaluation result of a 750 kW wind turbine(W/T) system. Test and evaluation are performed according to the international standard IEC 61400-11 on J48 W/T which is under operation in Daekwanryung W/T test site. With the meteorological data and W/T operational data, noise data are monitored and analysed. An integrated monitoring system is constructed in the test site and is utilized for the evaluation. From the measured noise data, acoustic power level, directivity and tonality of the W/T are estimated under the wind speeds required fly the International standard. The purpose of the study is to establish an W/T noise evaluating system satisfying the international standard and to obtain noise data for home made 750 kW W/T.

소형 풍력발전시스템의 출력성능검사 (Power performance Testing of Small Wind Turbine Generator System)

  • 김현기;김병민;유능수
    • 산업기술연구
    • /
    • 제31권A호
    • /
    • pp.123-128
    • /
    • 2011
  • In this study, procedures, a power performance testing system of Wind Turbine System Research Center of Kangwon National University is introduced. Test prodedures and results are presented on a stand-alone vertical-axis 200W wind turbine manufactured by Geum-Poong Energy Inc.. Power performance test is performed according to IEC standard. The test results are compared with the power performance standard. Also, the effects of normalization and disturbed sectors are considered.

  • PDF

시간영역 빔포밍을 사용한 풍력터빈 축소모델 소음원 측정 (Acoustic Noise Measurement for the Wind Turbine Blade by Using Time-domain Beamforming)

  • 조태환;김철완
    • 신재생에너지
    • /
    • 제5권2호
    • /
    • pp.25-30
    • /
    • 2009
  • The wind tunnel test to identify the acoustic noise source position of the wind turbine blade was conducted in KARI low speed wind tunnel. Microphone array and time-domain beamforming methodology was applied to this study. To reduce the data processing time, a modified beamforming method with a criteria between calculation time step and grid size for rotating angle in the cylinderical coordinate system was proposed. The test results shows that the data processing time to identify the noise source position was reduced to 20% compared with conventional method. And the dominant noise source of the blade moves from inboard to blade tip as the frequency increases.

  • PDF

Validation of a 750 kW semi-submersible floating offshore wind turbine numerical model with model test data, part II: Model-II

  • Kim, Junbae;Shin, Hyunkyoung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제12권1호
    • /
    • pp.213-225
    • /
    • 2020
  • Floating Offshore Wind Turbines (FOWT) installed in the deep sea regions where stable and strong wind flows are abundant would have significantly improved energy production capacity. When designing FOWT, it is essential to understand the stability and motion performance of the floater. Water tank model tests are required to evaluate these aspects of performance. This paper describes a model test and numerical simulation for a 750-kW semi-submersible platform wind turbine model-II. In the previous model test, the 750-kW FOWT model-I suffered slamming phenomena from extreme wave conditions. Because of that, the platform freeboard of model-II was increased to mitigate the slamming load on the platform deck structure in extreme conditions. Also, the model-I pitch Response Amplitude Operators (RAO) of simulation had strong responses to the natural frequency region. Thus, the hub height of model-II was decreased to reduce the pitch resonance responses from the low-frequency response of the system. Like the model-I, 750-kW FOWT model-II was built with a 1/40 scale ratio. Furthermore, the experiments to evaluate the performance characteristics of the model-II wind turbine were executed at the same location and in the same environment conditions as were those of model-I. These tests included a free decay test, and tests of regular and irregular wave conditions. Both the experimental and simulation conditions considered the blade rotating effect due to the wind. The results of the model tests were compared with the numerical simulations of the FOWT using FAST (Fatigue, Aerodynamics, Structures, and Turbulence) code from the National Renewable Energy Laboratory (NREL).

LabVIEW를 이용한 풍력발전기 모니터링 시스템 개발 (Development of a Wind Turbine Monitoring System using LabVIEW)

  • 남윤수;김형기;유능수;이정완
    • 한국정밀공학회지
    • /
    • 제20권5호
    • /
    • pp.92-98
    • /
    • 2003
  • A wind turbine monitoring system is essential equipment fur the performance evaluation and mechanical load analysis of a wind turbine. A monitoring system using LabVIEW is developed in this study. This system monitors signals from a meteorological mast, wind turbine generator, and tower. The discrete signals which are sampled at t Hz are automatically saved on a data file in the unit of a day. Besides these basic functions, the developed monitoring system has the other several capabilities. One of them is the information access from a remote PC through the internet. A vision image of the test site area and data files that are produced by LabVIBW software can be uploaded to the main computer located in a remote site. An emergency backup system using UPS fur the power loss on the monitoring HW is also prepared, A detail explanation for the developed wind turbine monitoring system is presented in this study.

Structural Design and Analysis of Connecting Part for Vertical Wind Turbine System Blade

  • Park, Hyunbum
    • 항공우주시스템공학회지
    • /
    • 제14권2호
    • /
    • pp.44-49
    • /
    • 2020
  • This work is intended to develop a flapping-type vertical wind turbine system that will be applicable to diesel generators and wind turbine generator hybrid systems. In the aerodynamic design of the wind turbine blade, parametric studies were performed to determine an optimum aerodynamic configuration. After the aerodynamic design, the structural design of the blade was performed. The major structural components of the flapping-type wind turbine are the flapping blade, the connecting part, and the stopper. The primary focus of this work is the design and analysis of the connecting part. Structural tests were performed to evaluate the blade design, and the test results were compared with the results of the analysis.

수직/수평축 통합형 풍력발전 시스템 (Dual Rotor Wind Turbine System)

  • 신찬;김지언;송승호;노도환;김동용;정성남
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.289-292
    • /
    • 2001
  • A Dual rotor turbines HAWT/VAWT combined wind turbine system that can drastically enhance the power production capability compared to conventional Single Rotor Turbine HAWT system. The combined system that takes advantage of strong point of both horizontal and vertical Axis wind turbine system developed by a venture firm : KOWINTEC of Chonbuk National University. The HAWT/VAWT hybrid system has been successfully field tested and commercial operation since Feb. 12, 2001 in Hae-chang rest park, Bu-an county near the Sae Man-Kum Sea Dike. This paper will briefly describe the field test results performance and a special aerodynamic structure with bevel-planetary gear box of Dual Rotor Wind Turbine system.

  • PDF

소형 풍력발전시스템의 출력제어 (Power Control of Small Wind Power System)

  • 김철호;이현채;서영택;조환기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.1066_1067
    • /
    • 2009
  • Wind power is one of most promising renewable energy. The output capacity of large wind turbine has been increased for off-shore application. Number of installation of small wind turbine also has been increased for the stand-alone and off-grid application of remote area and recently small wind turbine equipped with lamp on the pole is used for street lamp. Maximum wind energy must be extracted by wind turbine within rated wind speed. Power must be controlled to protect the system such as blade, generator, and power system above the rated wind speed. In this paper, small wind power system of 800W rating for battery charging is implemented and output power control by furling system is verified at wind tunnel test.

  • PDF

풍력발전시스템 성능 해석 S/W의 초기 검증에 관한 연구 (Preliminary Validation of Wind Turbine Generator System Performance Analysis S/W, WINSIM)

  • 문정희;노태수;박종혁;김성주
    • 한국항공우주학회지
    • /
    • 제37권2호
    • /
    • pp.209-214
    • /
    • 2009
  • 본 논문에서는 풍력발전시스템의 정상 및 과도 응답과 같은 동적 거동 분석은 물론 피치제어 시스템의 성능 예측을 위하여 개발된 시뮬레이션 소프트웨어의 검증을 위하여 실제 현장에서 측정한 자료와 비교 검증을 수행하였고 실제와 유사하도록 시스템 모델링 및 소프트웨어의 개선 방향을 제시함으로써 향후 본 연구를 통하여 개발한 소프트웨어의 유용성을 제시하고자 한다.