• Title/Summary/Keyword: Wet Floor Heating System

Search Result 7, Processing Time 0.023 seconds

A Study on Comparison of Capacity between Wet.Dry Floor Heating Systems Using Geothermal Heat Pump (지열히트펌프를 이용한 습식.건식 바닥난방 성능평가 연구)

  • Lee, Byoung-Doo;Lee, Se-Jin;Lee, Dae-Woo;Oh, Sung-Hae;Nam, Woo-Dong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.567-570
    • /
    • 2009
  • The present study conducted comparative evaluation of wet dry floor heating systems using geothermal heat pump. Circulation hot water from geothermal heat pump which is $10{\sim}15^{\circ}C$ lower than that from boiler was used. In order to access indoor temperature ($25^{\circ}C$) it took 74 minutes for dry type and 247 minutes for wet type. Average floor temperature was $23.89^{\circ}C$ for wet type and $32.66^{\circ}C$ for dry type. Energy saving rate gradually increased by 66% after 138 minutes. In the results, for floor heating system using low temperature circulation water, wet type was not enough to meet stable and comfortable radiant floor heating due to low floor temperature and access time to indoor set temperature. While dry type was practicable for stable floor heating due to fast rise of indoor set temperature and comfortable floor temperature.

  • PDF

Comparative Study on Performance of Wet-type and Dry-type Floor Heating Systems Using Geothermal Heat Pump (지열히트펌프를 이용한 습식.건식 바닥난방 성능평가 연구)

  • Lee, Byoung-Doo;Lee, Se-Jin;Lee, Dae-Woo;Oh, Sung-Hae;Nam, Woo-Dong
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.60-65
    • /
    • 2009
  • The present study was conducted for a comparative evaluation of wet and dry floor heating systems using geothermal heat pump. We circulated hot water from geothermal heat pump which is $10{\sim}15^{\circ}C$ lower than that from boiler. In order to access indoor temperature ($25^{\circ}C$) it took 74 minutes for dry type and 247 minutes for wet type. Average floor temperature was $23.9^{\circ}C$ for wet type and $32.7^{\circ}C$ for dry type. Energy saving rate gradually increased by 66% after 138 minutes. As a result, in case of floor heating system using low temperature circulation water, dry type was more practicable for stable floor heating than wet type in terms of floor temperature and access time to indoor set temperature.

  • PDF

A Study on the Development of Rolled Dry Floor Heating System for Improving Workability (현장 시공성 개선을 위한 롤타입 건식바닥난방시스템 개발)

  • Lee, Gyu-Dong;Kim, Jun-Ho;Jeong, Chang-Ho;Kim, Dong-Woo;Ogawa, Keiichiro
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.177-180
    • /
    • 2012
  • Korea residential housing generally use wet floor heating system 'Ondol' which consist of insulation cushioning, lightweight foamed concrete, hot water pipe and mortar on top of reinforced concrete slab. Wet floor heating system's installation process is too complicate and difficult to supervise field for continuing assurance quality. Also, this method has a huge impact on the progress of construction because it take a long time to cure finishing mortar and lightweight foamed concrete. Therefore, it is considered a disturbance factor of reduction of construction duration for enhancing competitiveness. In this study, we conducted an experiment about the radiant heat performance and temperature difference on upper panel of rolled dry floor heating systems which is jointly developed by Kolon global and Sumisho Metalex for remodeling housing, studio apartment and the urban-life housing.

  • PDF

An Experimental Study on Structural Safety Assesment of Wet Type Floor Heating System with Insulation (완충재 적용에 따른 습식온돌의 구조안전성 평가를 위한 실험연구)

  • Ahn, Jae-Won;Jun, Myoung-Hoon;Lee, Bum-Sik;Lee, Do-Heun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.287-290
    • /
    • 2005
  • Housing is demanded to convert simple dwelling space into delightful one by improving of standard of living by economic development It is interested in the impact noise of the apartment housing that is revised to housing construction criteria at 29 March 2005 and then regulated the level of floor impact noise by the rule. The plan, which is actively investigated by counterplan for the reduction of impact noise, is application of sound insulation. In generally, first target by using insulation is the reduction of floor thermal transmittance in floor heating system of apartment housing. It is recently proposed soft materials that reduce the impact noise. However, it is a fact that the application of soft sound insulation includes some problem about structural performance. In this study, we made wet-heating specimen with various sound insulations, and carried out structralexperiment for evaluating the structural safety of it.

  • PDF

Thermal Performance Assessment of Wet Ondol and Electric Ondol System (습식온돌시스템과 전기온돌시스템의 열성능 평가)

  • Han, Byung-Jo;Koo, Kyung-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.214-220
    • /
    • 2011
  • This paper studies about the assessment of thermal performance between wet ondol system and electric ondol system. Electrical ondol systems shows faster warm-up time, higher floor surface temperature distribution and lower power consumption than wet ondol system. However, if we provide heat regularly wet ondol system which has more heat capacity shows greater thermal storage than electric ondol system. Therefore, we could conclude that wet ondol system which keeps temperature regularly by the thermal storage show better energy-efficiency in case of using the central heating and district heating system. However, Electrical ondol system shows better efficiency in case of using the space during short time or individual heating systems which needs to heat quickly. The Experiment says that electric ondol system has more benefits on timing to reach the set temperature and energy-efficiency than wet ondol system.

The comparison of thermal characteristics of new Han-ok floor heating for applying modern On-dol system (현대 온돌 시스템 적용을 위한 신한옥 바닥난방의 열적특성 비교)

  • Lee, Tai-Gang;Lee, Ju-Yeob;Song, Min-Jeong;Kim, Sun-Woo
    • KIEAE Journal
    • /
    • v.13 no.3
    • /
    • pp.61-69
    • /
    • 2013
  • The experiment on thermal characteristics of on-dol systems were carried out to apply to New Han-ok's heating system. Change of surface temperature varied with heating times, distribution of surface temperature, radiation property were surveid on four on-dol system in laboratory conditions. Followings are results. 1) "Hwang-to unit" was most favorable condition of the distribution of floor surface temperature. And the results from reaching time to thermal comfort temperature of on-dol system showed that "Hwang-to unit" was the most favorable to continuance of floor temperature. 2) There were a little difference in surface floor radiations of $30^{\circ}C$ for three wet on dol-systems. 3) It was suggested that "Hwang-to unit" is the most appropriate to floor heating system of new han-ok considering eco-friendship and continuance of floor temperature in intermittent heating condition.

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF