• Title/Summary/Keyword: Well cost

Search Result 4,540, Processing Time 0.032 seconds

Seismic effectiveness of tuned mass dampers in a life-cycle cost perspective

  • Matta, Emiliano
    • Earthquakes and Structures
    • /
    • v.9 no.1
    • /
    • pp.73-91
    • /
    • 2015
  • The effectiveness of tuned mass dampers (TMDs) in reducing the seismic response of civil structures is still a debated issue. The few studies regarding TMDs on inelastic structures indicate that they would perform well under moderate earthquake loading, when the structure remains linear or weakly nonlinear, while tending to fail under severe ground shaking, when the structure experiences strong nonlinearities. TMD seismic efficiency should be therefore rationally assessed by considering to which extent moderate and severe earthquakes respectively contribute to the expected cost of damages and losses over the lifespan of the structure. In this paper, a method for evaluating, in a life-cycle cost (LCC) perspective, the seismic effectiveness of TMDs on inelastic building structures is presented and exemplified on the SAC LA 9-storey steel moment-resisting frame benchmark building. Results show that the LCC concept may provide an appropriate alternative to traditional performance criteria for the evaluation of the effectiveness of TMDs and that TMD installation on typical existing middle-rise buildings in high seismic hazard regions may significantly reduce building lifetime cost despite the poor control performance observed under the most severe seismic events.

A Study on the Evaluation Method of Green Remodeling Considering LCA and LCC (LCA 및 LCC를 고려한 환경친화적 리모델링의 평가방법에 관한 연구)

  • Lee, Gwan-Ho;Kim, Nam-Gyu;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.1
    • /
    • pp.57-67
    • /
    • 2003
  • This study aims to presents Evaluation Method of Green Remodeling that analyze the value of environment through expense, using the method of life cycle cost and life cycle assessment simultaneously. The results of this study are summarized as follows. Evaluation Model developed in this study can convert economical value of environment into cost by integrating. In addition, the model can apply as a useful tool to estimation of economical design alternative as well as quantification of environmental loads and costs. Evaluation Model presented In this study observe energy consumption and the environmental load emission with qualification, it can forecast effect of environmental cost that cost estimation is expected to be added to energy cost rate by being possible. Synthetically, when Estimation Model and computer program that developed in this study is applies to the construction industry; reasonable management of environmental load is convenient at each step of Green Remodeling. In addition, at preliminary design phase, practical use may be possible by reasonable yardstick about various alternatives and improvement of design alternatives likewise by grasping environmental effect.

Developing an Integrated Evaluation Technology for Energy- and Cost-Efficient Building Design Based on BIM in the Real-time Manner

  • Park, Jae Wan;Lee, Yun Gil
    • Architectural research
    • /
    • v.16 no.3
    • /
    • pp.93-100
    • /
    • 2014
  • Existing BIM(Building Information Modeling) based energy evaluation tools cannot be utilized enough for the potential performance of BIM because most of them have not provided the integrated model for energy evaluation, assessment of the material, cost of the construction, and so on. This research aims to propose and develop a new application, EcoBIM, to support an integrated evaluation of the energy and cost efficiencies of the design alternatives within the design process. The proposed application functions as a BIM-based evaluation system that calculates energy-savings performance as well as the construction cost of the alternatives at the design stage. This study mainly focuses on the possibilities of developing the proposed technology. We also suggest an advanced design process using the proposed system, corresponding to changes of national regulations in Korea. This study deduce that EcoBIM can allow architects to make suitable decisions regarding energy- and cost-efficient designs. The proposed design process will allow architects not only to check the eco-friendly performance of design alternatives but also predict the operation cost in a certain period in the future. EcoBIM can prevent large-scale design changes required to obtain environmental certification and enable the owner to make an informed decision about the initial investment of construction according to the result of the analysis of the energy requirement at the design stage.

Reliability-based Life Cycle Cost Analysis for Optimal Seismic Upgrading of Bridges

  • Alfredo H-S. Ang;Cho, Hyo-Nam;Lim, Jong-Kwon;An, Joong-San
    • Computational Structural Engineering : An International Journal
    • /
    • v.1 no.1
    • /
    • pp.59-69
    • /
    • 2001
  • This study is intended to propose a systematic approach for reliability-based assessment of life cycle cost (LCC) effectiveness and economic efficiency for cost-effective seismic upgrading of existing bridges. The LCC function is expressed as the sum of the upgrading cost and all the discounted life cycle damage costs, which is formulated as a function of the Park-Ang damage index and structural damage probability. The damage costs are expressed in terms of direct damage costs such as repair/replacement costs, human losses and property damage costs, and indirect damage costs such as road user costs and indirect regional economic losses. For dealing with a variety of uncertainties associated with earthquake loads and capacities, a simulation-based reliability approach is used. The SMART-DRAIN-2DX, which is a modified version of the well-known DRAIN-2DX, is extended by incor-porating LCC analysis based on the LCC function developed in the study. Economic efficiencies for optimal seismic upgradings of the continuous PC segmental bridges are assessed using the proposed LCC functions and benefit-cost ratio.

  • PDF

Logistics Information System's Implementation Strategy of Global Company for Effective Logistics Cost Management : Focus on Case Study of 'A' Electronic Company (물류비의 효율적 관리를 위한 글로벌 기업의 물류정보시스템 구축 전략 : 'A'전자 구축사례를 중심으로)

  • Lee, Jong-Hwa;Goh, Hyun-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.1
    • /
    • pp.132-141
    • /
    • 2008
  • This research was conducted in order to present the strategies of implementing the logistics information system for effective logistics cost management with the case study of a leading global company. The strategy for effective logistics information system can be derived from the 3 different viewpoints, Firstly the effective global logistics management can be insured by means of the efforts of the reinforced total organization. Secondly from the process-oriented perspective, we should recognize the logistics process as the core factor of the competitive strategy and innovate the logistics process itself for the logistics cost reduction. Finally, the logistics cost will be effectively managed through establishing its logistics information strategy which maximizes the utilization of the information technologies. The case study of 'A' electronics company shows that its logistics management system provides the company with various visibilities about its logistics cost and the direct and indirect benefits over billions of wons per year as well. Therefore we can conclude that the research model provided in this research is validated. This study presents the concrete implementation strategies of the logistics information system and verifies the validity of the strategies by means of the case study of a leading company.

The Economic Benefits of Breastfeeding (모유수유의 경제적 효과)

  • 현태선;김기남;강남미;임은영
    • Korean Journal of Community Nutrition
    • /
    • v.7 no.6
    • /
    • pp.863-871
    • /
    • 2002
  • To compare the costs incurred by infant feeding between mothers who breastfed their infants and those who fed them infant formula, a questionnaire survey was carried out to 136 mothers living in Seoul, Cheongju and Chungju who breastfed and 199 mothers who formula-fed their infants. The cost of formula-feeding was estimated based on the expenditures for formula and feeding apparatus, and the time needed to wash bottles and prepare formula. The cost of breastfeeding was estimated based on the expenditures for food for the additional nutritional intake of these mothers. The mean cost of formula-feeding was ₩ 1,870,125 during the first year of the baby's life. The food cost for the additional nutritional intake of the breastfeeding mothers was ₩ 203.004 per year. The extra medical cost for respiratory illnesses in the formula-fed group compared to the breastfed group was W 62,920 because the formula-fed infants required medical attention for respiratory illnesses more often than the breast-fed infants. Therefore, breastfeeding could save ₩ 1,730,041 during the first year of an infant's life. We may have underestimated the cost savings from breastfeeding because we did not take into account the potentially decreased costs of fertility control and the health benefits for mothers. as well as the decreased usage of water and gas. Analyses showed that breastfeeding is not only nutritionally advantageous, but also economically advantageous for families and society.

The Implementation of Total Quality Management in Controlling the Cost of Manufacturing

  • Seetharaman, A.;Raj, John Rudolph;Seetharaman, Saravanan Arumugam
    • Journal of Distribution Science
    • /
    • v.13 no.8
    • /
    • pp.27-40
    • /
    • 2015
  • Purpose - Total Quality Management (TQM) has received significant attention and interest from a large number of organizations around the world in various industries. These organizations have tried to embody TQM concepts in areas such as engineering and product design, marketing, R&D, procurement, production, personnel, and product inspection. Research design, data, and methodology - This study presents an overview of the fundamentals of TQM and an in depth review of the obstacles to the successful implementation of TQM. Results - In order to control the cost of manufacturing, the tracking of the cost of quality (COQ) allows companies to capture the actual overall cost incurred in producing a unit of product or service. The study explores the reasons why companies track the COQ and ways to address it. Conclusions - Based on the results, COQ is one of the key performance indicators for making more accurate strategic decisions as well as a critical aspect of TQM. The study also presents a few popular quality improvement tools that have been widely used in organizations successfully implementing TQM.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Cost-benefit Analysis of Home Visiting Care for Vulnerable Populations with Hypertension (취약계층 고혈압 대상자를 위한 방문건강관리사업의 비용편익분석)

  • Ko, Young;Lee, In-Sook
    • Research in Community and Public Health Nursing
    • /
    • v.22 no.4
    • /
    • pp.438-450
    • /
    • 2011
  • Purpose: This study was to investigate the effect of home visiting care service and to evaluate the effect from the cost-benefit perspective. Methods: Target participants were enrolled in 2007~2008 for home visiting care and provided with a home visiting nursing service for more than 18 months in J Ward of S City. Of 391 participants, 244 who satisfied the inclusion criteria were used in the final analysis. Cost-benefit analysis was done using the net benefit and benefit/cost ratio. Results: After providing the home care nursing service, the blood pressure control rate increased from 50.8% to 75.4%. Of the subjects, 39.8% maintained their blood pressure level within the target range. As a whole, the net benefit of home visiting care per person ranged from 434,964.86 to 447,112.43 won and the benefit/cost ratio ranged from 2.82 to 2.84. Conclusion: Home visiting care for vulnerable populations with hypertension was effective in both maintaining blood pressure and reducing blood pressure to the target range. Therefore these results are especially useful for establishing the value of home visiting services for policy makers as well as for prioritizing vulnerable populations.

A Dual-Population Memetic Algorithm for Minimizing Total Cost of Multi-Mode Resource-Constrained Project Scheduling

  • Chen, Zhi-Jie;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.70-79
    • /
    • 2010
  • Makespan and cost minimization are two important factors in project investment. This paper considers a multi-mode resource-constrained project scheduling problem with the objective of minimizing costs, subject to a deadline constraint. A number of studies have focused on minimizing makespan or resource availability cost with a specified deadline. This problem assumes a fixed cost for the availability of each renewable resource per period, and the project cost to be minimized is the sum of the variable cost associated with the execution mode of each activity. The presented memetic algorithm (MA) consists of three features: (1) a truncated branch and bound heuristic that serves as effective preprocessing in forming the initial population; (2) a strategy that maintains two populations, which respectively store deadline-feasible and infeasible solutions, enabling the MA to explore quality solutions in a broader resource-feasible space; (3) a repair-and-improvement local search scheme that refines each offspring and updates the two populations. The MA is tested via ProGen generated instances with problem sizes of 18, 20, and 30. The experimental results indicate that the MA performs exceptionally well in both effectiveness and efficiency using the optimal solutions or the current best solutions for the comparison standard.