• Title/Summary/Keyword: Weighted scheduling

Search Result 134, Processing Time 0.023 seconds

FLOW SHOP SCHEDULING JOBS WITH POSITION-DEPENDENT PROCESSING TIMES

  • WANG JI-BO
    • Journal of applied mathematics & informatics
    • /
    • v.18 no.1_2
    • /
    • pp.383-391
    • /
    • 2005
  • The paper is devoted to some flow shop scheduling problems, where job processing times are defined by functions dependent on their positions in the schedule. An example is constructed to show that the classical Johnson's rule is not the optimal solution for two different models of the two-machine flow shop scheduling to minimize makespan. In order to solve the makespan minimization problem in the two-machine flow shop scheduling, we suggest Johnson's rule as a heuristic algorithm, for which the worst-case bound is calculated. We find polynomial time solutions to some special cases of the considered problems for the following optimization criteria: the weighted sum of completion times and maximum lateness. Some furthermore extensions of the problems are also shown.

Lyapunov-based Fuzzy Queue Scheduling for Internet Routers

  • Cho, Hyun-Cheol;Fadali, M. Sami;Lee, Jin-Woo;Lee, Young-Jin;Lee, Kwon-Soon
    • International Journal of Control, Automation, and Systems
    • /
    • v.5 no.3
    • /
    • pp.317-323
    • /
    • 2007
  • Quality of Service (QoS) in the Internet depends on queuing and sophisticated scheduling in routers. In this paper, we address the issue of managing traffic flows with different priorities. In our reference model, incoming packets are first classified based on their priority, placed into different queues with different capacities, and then multiplexed onto one router link. The fuzzy nature of the information on Internet traffic makes this problem particularly suited to fuzzy methodologies. We propose a new solution that employs a fuzzy inference system to dynamically and efficiently schedule these priority queues. The fuzzy rules are derived to minimize the selected Lyapunov function. Simulation experiments show that the proposed fuzzy scheduling algorithm outperforms the popular Weighted Round Robin (WRR) queue scheduling mechanism.

MPLS-Based IP-QoS Provisioning in 3G GPRS Networks (3G GPRS 망에서 MPLS 기반의 IP-QoS 제공 방안)

  • 이상호;정동수;김영진;박성우
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.7B
    • /
    • pp.653-663
    • /
    • 2002
  • UMTS/GPRS has its own QoS architecture, but additionally needs to support IP-QoS to provide Internet services. This paper describes an IP-QoS provisioning mechanism in the MPLS-based UMTS/GPRS network. We propose a QoS framework that includes the functional architecture of the MPLS-based GPRS networks and the efficient scheduling mechanism based on Diffserv model. The proposed scheduling mechanims is especially focused on the QoS support for real-time services. It also includes a new buffer management scheme that combines the priority queuing and weighted round robin method. The ns-2 simulator has been used to verify the validity of the proposed scheduling method.

A Priority Time Scheduling Method for Avoiding Gateway Bottleneck in Wireless Mesh Networks (무선 메쉬 네트워크에서 게이트웨이 병목 회피를 위한 우선순위 타임 스케줄링 기법)

  • Ryu, Min Woo;Kim, Dae Young;Cha, Si Ho;Cho, Kuk Hyun
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.5 no.2
    • /
    • pp.101-107
    • /
    • 2009
  • In existing wireless ad-hoc networks, how to distribute network resources fairly between many users to optimize data transmission is an important research subject. However, in wireless mesh networks (WMNs), it is one of the research areas to avoid gateway bottleneck more than the fair network resource sharing. It is because WMN traffic are concentrated on the gateway connected to backhaul. To solve this problem, the paper proposes Weighted Fairness Time-sharing Access (WFTA). The proposed WFTA is a priority time scheduling scheme based on Weighted Fair Queuing (WFQ).

No-Wait Lot-Streaming Flow Shop Scheduling (비정체 로트 - 스트리밍 흐름공정 일정계획)

  • Yoon, Suk-Hun
    • IE interfaces
    • /
    • v.17 no.2
    • /
    • pp.242-248
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots to allow the overlapping of operations between successive machines in a multi-stage production system. A new genetic algorithm (NGA) is proposed for minimizing the mean weighted absolute deviation of job completion times from due dates when jobs are scheduled in a no-wait lot-streaming flow shop. In a no-wait flow shop, each sublot must be processed continuously from its start in the first machine to its completion in the last machine without any interruption on machines and without any waiting in between the machines. NGA replaces selection and mating operators of genetic algorithms (GAs), which often lead to premature convergence, by new operators (marriage and pregnancy operators) and adopts the idea of inter-chromosomal dominance. The performance of NGA is compared with that of GA and the results of computational experiments show that NGA works well for this type of problem.

Heuristics for Flow Shop Scheduling with Weighted WIP Costs

  • Yang Jae-Hwan;Kim Hyun-Soo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1124-1132
    • /
    • 2006
  • This paper considers a flow shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. The objective is to minimize the sum of the weighted WIP. For the two machine flow shop case, the recognition version is unary NP-Complete. The three simple and intuitive heuristics H0, H1, and H2 are presented for the problem. For each heuristic, we find an upper bound on relative error which is tight in limit. For heuristic H2, we show that H2 dominates the other two heuristics.

  • PDF

Scheduling for Parallel Machines with Family Setup Times (패밀리 셋업이 존재하는 병렬기계 일정계획 수립)

  • Kwon Ick-Hyun;Shin Hyun-Joon;Eom Dong-Hwan;Kim Sung-Shick
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.1
    • /
    • pp.27-41
    • /
    • 2005
  • This paper considers identical parallel machine scheduling problem. Each job has a processing time. due date. weight and family type. If a different type of job is followed by prior job. a family setup is incurred. A two phased heuristic is presented for minimizing the sum of weighted tardiness. In the first phase. using roiling horizon technique. group each job into same family and schedule each family. In the second phase. assign each job to machines using schedule obtained in the first phase. Extensive computational experiments and comparisons among other algorithms are carried out to show the efficiency of the proposed algorithm.

Energy Scheduling Weighted-value Control Algorithm in MANET (모바일 에드혹 네트워크에서 에너지 스케쥴링 가중치 제어 알고리즘)

  • Oh, Young-jun;Kim, Yong-hwan;Lee, Kang-whan
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.510-512
    • /
    • 2013
  • 본 논문에서는 이동 에드 혹 네트워크(Mobile Ad-hoc network: MANET)에서의 상황인식 기반의 에너지 스케쥴링 기법인 ESWC(Energy Scheduling Weighted-value Control) 알고리즘을 제안한다. 기존 MANET에서 노드의 에너지를 관리하기 위한 여러 가지의 방법들이 제안 되고 있다. 특히 이동노드들의 경우 이동성에 따라 에너지 소모율이 다르며, 이때 상호 노드간 전송하는 데이터와 상호 위치에 따라 에너지 소모율은 다르게 된다. 본 논문에서는 계층적 클러스터 단위의 동적인 토폴로지에서 전송 거리와 전송 데이터의 패킷량이 어떠한 상호관계에 따라 노드의 소모 에너지에 미치는 영향이 있는지를 분석한다. ESWC에서 도출된 에너지의 가중치 결과는 최종적으로 전송 경로에 있어 에너지 소모율을 분석하여 네트워크상에서 전체적인 노드의 라이프타임을 향상 시킬 수 있다. 본 연구의 주어진 모의실험환경에서 노드의 방향성 및 시간에 따른 이동성을 반영함으로써 에너지 효율적인 클러스터링 및 라우팅 경로 알고리즘이 제공되어 네트워크의 최적화된 에너지 소모 결과를 보여주었다.

  • PDF

QoS-Guaranteed Multiuser Scheduling in MIMO Broadcast Channels

  • Lee, Seung-Hwan;Thompson, John S.;Kim, Jin-Up
    • ETRI Journal
    • /
    • v.31 no.5
    • /
    • pp.481-488
    • /
    • 2009
  • This paper proposes a new multiuser scheduling algorithm that can simultaneously support a variety of different quality-of-service (QoS) user groups while satisfying fairness among users in the same QoS group in MIMO broadcast channels. Toward this goal, the proposed algorithm consists of two parts: a QoS-aware fair (QF) scheduling within a QoS group and an antenna trade-off scheme between different QoS groups. The proposed QF scheduling algorithm finds a user set from a certain QoS group which can satisfy the fairness among users in terms of throughput or delay. The antenna trade-off scheme can minimize the QoS violations of a higher priority user group by trading off the number of transmit antennas allocated to different QoS groups. Numerical results demonstrate that the proposed QF scheduling method satisfies different types of fairness among users and can adjust the degree of fairness among them. The antenna trade-off scheme combined with QF scheduling can improve the probability of QoS-guaranteed transmission when supporting different QoS groups.

Online Non-preemptive Deadline Scheduling for Weighted Jobs (가중치 작업들의 온라인 비선점 마감시한 스케줄링)

  • Kim Jae-Hoon;Chang Jung-Hwan
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.32 no.2
    • /
    • pp.68-74
    • /
    • 2005
  • In deadline scheduling, jobs have deadlines by which they are completed. The scheduling algorithm determines which jobs are executed at each time. Then only the completed jobs contribute to the throughput or gain of the algorithm. The jobs have arbitrary weights and the gain of the algorithm is given as the sum of weights of the completed jobs. The goal of the scheduling algorithm is to maximize its gain. In this paper, we consider online non-preemptive scheduling, where jobs arrive online and the scheduling algorithm has no information about jobs arriving ahead. Also the jobs cannot be preempted or rejected while they are executed. For this problem, we obtain lower bounds for any online algorithms and also we propose an optimal online algorithm meeting the lower bounds.