Browse > Article

Scheduling for Parallel Machines with Family Setup Times  

Kwon Ick-Hyun (고려대학교 산업시스템정보공학과)
Shin Hyun-Joon (삼성전자)
Eom Dong-Hwan (육군본부)
Kim Sung-Shick (고려대학교 산업시스템정보공학과)
Publication Information
Abstract
This paper considers identical parallel machine scheduling problem. Each job has a processing time. due date. weight and family type. If a different type of job is followed by prior job. a family setup is incurred. A two phased heuristic is presented for minimizing the sum of weighted tardiness. In the first phase. using roiling horizon technique. group each job into same family and schedule each family. In the second phase. assign each job to machines using schedule obtained in the first phase. Extensive computational experiments and comparisons among other algorithms are carried out to show the efficiency of the proposed algorithm.
Keywords
Family Setup; Parallel Machines; ATCS(Apparent Tardiness Cost with Setup); Tabu Search; Total Weighted Tardiness;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Bitran, GR and S.M. Gilbert, 'Sequencing Production on Parallel Machines with Two Magnitudes of Sequence-Dependent Setup Cost,' Journal of Manufacturing and Operations Management, Vol.3(1990), pp.190-200
2 Cheng, T.C.E. and C.C.S. Sin, 'A State-of-the-Art Review of Parallel-Machine Scheduling Research,' European Journal of Operational Research. Vol.47, No.3(1990), pp.271-292   DOI   ScienceOn
3 Elmagraby, S.E. and S. Park, 'Scheduling Jobs on a Number of Identical Machines,' lIE Transactions, Vol.6, No. 1(1974) , pp.1-13
4 Ovacik, I.M and R. Uzsoy, 'Rolling Horizon Procedures for Dynamic Parallel Machine Scheduling with Sequence-Dependent Setup Times,' International Journal of Production Research, Vol.33, No.1(1995), pp.3173-3192   DOI   ScienceOn
5 Schutten, J.M.J. and R.A.M. Leussink, 'Parallel Machine Scheduling with Release Dates, Due Dates and Family Setup Times,' International Journal of Production Economics, Vol.46/47(1996), pp.119-125   DOI   ScienceOn
6 Glover, F., 'Tabu search - Part II,' ORSA Journal on Computing, Vol.2, No.1(1990), pp. 4-32   DOI
7 Ovacik, I.M. and R. Uzsoy, Decem- position Methods for Complex Factory Scheduling Problems, Kluwer Academic Publishers, 1997
8 Lee, Y.H. and M Pinedo, 'Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times,' European Journal of Operational Research, Vol.100, No.3(1997), pp.464-474   DOI   ScienceOn
9 Monma, C.L. and C.N. Potts, 'Analysis of Heuristic for Preemptive Parallel Machine Scheduling with Batch Setup Times,' Operations Research, Vol.41, No.5(1993), pp.981-993   DOI   ScienceOn
10 Vollmann, T.E, .L.B. Berry, D.C. Whybark and F.R. Jacobs, Manufacturing Planning and Control for Supply Chain Management, McGraw-Hill, 2004
11 Horowitz, E. and S. Sahni, 'Exact and Approximate Algorithms for Scheduling Nonidentical Processors,' Journal of ACM, Vol.23 (1976), pp.317-327   DOI   ScienceOn
12 Pinedo, M., Scheduling : Theory, Algorithms, and System, Prentice Hall, New Jersey, 1995
13 Barnes, J.W. and J.W. Brennan, 'An Improved Algorithm for Scheduling Jobs on Identical Machines,' lIE Transactions, Vol.9, No.1(1977), pp.25-31
14 Lawler, E.L., J.K Lenstra, AHG. Rinnooy Kan and DB. Shmoys, Sequencing and Scheduling : Algorithms and Complexity, Handbooks in Operations and Management Science, Vol.4, 1993
15 Glover, F. and M. Laguna, Tabu Search, Kluwer Academic Publishers, Dordrecht, 1997
16 Glover, F., 'Tabu Search - Part I,' ORSA Journal on Computing, Vol.1, No.3(1989), pp. 190-206   DOI
17 Hariri, AMA and C.N. Potts, 'Heuristics for Scheduling Unrelated Parallel Machines,' Computers & Operations Research, Vol.18, No.3(1991) pp.323-331   DOI   ScienceOn
18 Azizoglu, M and S. Webster, 'Scheduling Parallel Machines to Minimize Weighted Flowtime with Family Set-up Times,' International Journal of Production Research, VoI.41, No.6 (2003), pp.1199-1215   DOI   ScienceOn
19 Karp, R.M, Reducibility among Combinatorial Problems - Complexity of Computer Computations, Plenum Press, New York, 1972
20 Tang, C.S., 'Scheduling Batches on Parallel Machines with Major and Minor Set-ups,' European Journal of Operational Research, Vol.46, No.1(1990), pp.28-37   DOI   ScienceOn
21 Laguna, M., J. W. Barnes and F. Glover, 'Tabu Search Methods for Single Machine Scheduling Problem,' Journal of Intelligent Manufacturing, Vol.2, No.1(1991) , pp.63-74   DOI
22 Vasilescu, E.N. and AD. Amar, 'An Empirical Evaluation of the Entrapment Procedure for Scheduling Jobs on Identical Machines,' lIE Transactions, Vol.15(1983), pp.261-263
23 Dogramaci, A, 'Production Scheduling of Independent Jobs on Parallel Identical Processors,' International Journal of Production Research, Vol.22, No.4(1984), pp.535-548   DOI   ScienceOn