참고문헌
- Azizoglu, M and S. Webster, 'Scheduling Parallel Machines to Minimize Weighted Flowtime with Family Set-up Times,' International Journal of Production Research, VoI.41, No.6 (2003), pp.1199-1215 https://doi.org/10.1080/0020754021000042959
- Barnes, J.W. and J.W. Brennan, 'An Improved Algorithm for Scheduling Jobs on Identical Machines,' lIE Transactions, Vol.9, No.1(1977), pp.25-31
- Bitran, GR and S.M. Gilbert, 'Sequencing Production on Parallel Machines with Two Magnitudes of Sequence-Dependent Setup Cost,' Journal of Manufacturing and Operations Management, Vol.3(1990), pp.190-200
- Cheng, T.C.E. and C.C.S. Sin, 'A State-of-the-Art Review of Parallel-Machine Scheduling Research,' European Journal of Operational Research. Vol.47, No.3(1990), pp.271-292 https://doi.org/10.1016/0377-2217(90)90215-W
- Dogramaci, A, 'Production Scheduling of Independent Jobs on Parallel Identical Processors,' International Journal of Production Research, Vol.22, No.4(1984), pp.535-548 https://doi.org/10.1080/00207548408942477
- Elmagraby, S.E. and S. Park, 'Scheduling Jobs on a Number of Identical Machines,' lIE Transactions, Vol.6, No. 1(1974) , pp.1-13
- Glover, F., 'Tabu Search - Part I,' ORSA Journal on Computing, Vol.1, No.3(1989), pp. 190-206 https://doi.org/10.1287/ijoc.1.3.190
- Glover, F., 'Tabu search - Part II,' ORSA Journal on Computing, Vol.2, No.1(1990), pp. 4-32 https://doi.org/10.1287/ijoc.2.1.4
- Glover, F. and M. Laguna, Tabu Search, Kluwer Academic Publishers, Dordrecht, 1997
- Hariri, AMA and C.N. Potts, 'Heuristics for Scheduling Unrelated Parallel Machines,' Computers & Operations Research, Vol.18, No.3(1991) pp.323-331 https://doi.org/10.1016/0305-0548(91)90034-O
- Horowitz, E. and S. Sahni, 'Exact and Approximate Algorithms for Scheduling Nonidentical Processors,' Journal of ACM, Vol.23 (1976), pp.317-327 https://doi.org/10.1145/321941.321951
- Karp, R.M, Reducibility among Combinatorial Problems - Complexity of Computer Computations, Plenum Press, New York, 1972
- Laguna, M., J. W. Barnes and F. Glover, 'Tabu Search Methods for Single Machine Scheduling Problem,' Journal of Intelligent Manufacturing, Vol.2, No.1(1991) , pp.63-74 https://doi.org/10.1007/BF01471219
- Lawler, E.L., J.K Lenstra, AHG. Rinnooy Kan and DB. Shmoys, Sequencing and Scheduling : Algorithms and Complexity, Handbooks in Operations and Management Science, Vol.4, 1993
- Lee, Y.H. and M Pinedo, 'Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times,' European Journal of Operational Research, Vol.100, No.3(1997), pp.464-474 https://doi.org/10.1016/S0377-2217(95)00376-2
- Monma, C.L. and C.N. Potts, 'Analysis of Heuristic for Preemptive Parallel Machine Scheduling with Batch Setup Times,' Operations Research, Vol.41, No.5(1993), pp.981-993 https://doi.org/10.1287/opre.41.5.981
- Ovacik, I.M and R. Uzsoy, 'Rolling Horizon Procedures for Dynamic Parallel Machine Scheduling with Sequence-Dependent Setup Times,' International Journal of Production Research, Vol.33, No.1(1995), pp.3173-3192 https://doi.org/10.1080/00207549508904867
- Ovacik, I.M. and R. Uzsoy, Decem- position Methods for Complex Factory Scheduling Problems, Kluwer Academic Publishers, 1997
- Pinedo, M., Scheduling : Theory, Algorithms, and System, Prentice Hall, New Jersey, 1995
- Schutten, J.M.J. and R.A.M. Leussink, 'Parallel Machine Scheduling with Release Dates, Due Dates and Family Setup Times,' International Journal of Production Economics, Vol.46/47(1996), pp.119-125 https://doi.org/10.1016/0925-5273(95)00086-0
- Tang, C.S., 'Scheduling Batches on Parallel Machines with Major and Minor Set-ups,' European Journal of Operational Research, Vol.46, No.1(1990), pp.28-37 https://doi.org/10.1016/0377-2217(90)90295-M
- Vasilescu, E.N. and AD. Amar, 'An Empirical Evaluation of the Entrapment Procedure for Scheduling Jobs on Identical Machines,' lIE Transactions, Vol.15(1983), pp.261-263
- Vollmann, T.E, .L.B. Berry, D.C. Whybark and F.R. Jacobs, Manufacturing Planning and Control for Supply Chain Management, McGraw-Hill, 2004