The temperature changes are very important in improving the accuracy of the load forecasting during the summer. It is because the cooling load in summer contribute to the increasing of the load. This paper proposes a weekend load forecasting algorithm using the temperature change characteristic in a summer of Jeju. The days before and after weekends in Jeju, when the load curves are quite different from those of normal weekdays. The temperature change characteristic are obtained by using weekends peak load and high temperature data. And load forecasted based on the sensitivity between unit temperature changes and load variations. Load forecast data with better accuracy are obtained by using the proposed temperature changes than by using the ordinary daily peak load forecasting. The method can be used to reduce the error rate of load forecast.
Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.
The Application of Artificial Neural Network(ANN) to forecast a load in a power system is investigated. The load forecasting is important in the electric utility industry. This technique, methodology based on the fact that parallel structure can process very fast much information is a promising approach to a load forecasting. ANN that is highly interconnected processing element in a hierachy activated by the each input. The load pattern can be divided distinctively into two patterns, that is, weekday and weekend. ANN is composed of a input layer, several hidden layers, and a output layer and the past data is used to activate input layer. The output of ANN is the load forecast for a given day. The result of this simulation can be used as a reference to a electric utility operation.
Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.
This paper presents a model for short-term load forecasting using multiple time-series. We made one-hour ahead load forecasting without classifying load data according to daily load patterns(e.g. weekday. weekend and holiday) To verify its effectiveness. the results are compared with those of neuro-fuzzy forecasting model(5). The results show that the proposed model has more accurate estimate in forecasting.
This paper presents the methods of short-term load forecasting Kohonen neural networks and back-propagation neural networks. First, historical load data is divided into 5 patterns for the each seasonal data using Kohonen neural networks and using these results, load forecasting neural network is used for next day hourly load forecasting. Next day hourly load of weekdays and weekend except holidays are forecasted. For load forecasting in summer, max-temperature and min-temperature data as well as historical hourly load date are used as inputs of load forecasting neural networks for a better forecasting accuracy. To show the possibility of the proposed method, it was tested with hourly load data of Korea Electric Power Corporation(1994-95).
단기 전력수요예측의 오차를 줄여 불필요한 전력생산을 이전에 방지하는 것은 매우 중요하다. 본 논문에서는 오차율이 높은 연휴 전 평일의 단기 전력수요예측 정확도를 높이기 위해 이전 평일과 주말의 데이터를 이용한 새로운 예측 방법을 제안하고, 추석연휴 전 평일에 제안한 방법을 적용하여 수요예측에 대한 오차가 개선됨을 확인하였다.
본 논문에서는 평일환산비를 사용하여 단기부하를 상정하는 알고리즘을 제시한다. 평일환산비로 주 주기성을 제거하고, 5개의 상정구간과 3 형태의 중회귀모델을 구성한다. 상정결과 상정도가 2.8〔%〕정도로 양호한 결과를 얻었다. 이로서 특수일(주말)부하의 전력수요상정도 가능하게 되었다. 중회귀 모델을 이용한 전력수요상정시의 큰 문제점인 특수일(주말)의 전력수요를 상정하는 방법이 제시됨으로서 상정도의 향상은 물론 신뢰성있는 상정모델의 구성이 가능하게 되었다.
Worldwide, the building energy simulation becomes inevitable step for predicting the energy consumption in building. In simulation process, the expertise is required for the accurate analysis results. In Korea, however, most of user use the inconsistent data with Korea circumstance. In this step, we need to construct the standard input data matched building in Korea. In this study, electricity consumption of apartments in Daejeon is analyzed. The yearly data of a apartment complexes of 2009 are analyzed as monthly, daily(week and weekend), timely, and completion year. With this result, we are able to predict the demand pattern of electricity in a house and make the schedule by demand pattern. The results of this study are followed. The averaged amount of electricity consumption in winter is higher than summer because of the high capacity of heating equipment. All of the house has electric base load from 0.26kWh to 0.5kWh. The average of the electricity consumption of month is shown as 326.7kWh. A week is seperated as 4 part such as week, weekend, Saturday and Sunday. During week, the average of timely electricity consumption is shown as 0.442kWh. The Saturday consumption is 0.453kWh. The Sunday is 0.461kWh.
To improve working environment for the toll workers who were working at Kyungbu expressway in outskirts of Seoul and Suwon, the status of air pollution surrounding toll booth were measured from March 28 through June 14, 1986. The results were as follows: 1. The amount of TSP (total suspended particle) surrounding toll booth was directly proportional to the traffic load. The ratio of traffic load at Seoul and Suwon toll was 3.2:1 and of TSP was 2.6:1. 2. The proportion of particle larger than 5$\mum$ was 24.8 $\sim$ 34.9% of TSP at Seoul toll and 19.2 $\sim$ 32.7% at Suwon. The proportion of particle less than 2$\mum$ was 38.7 $\sim$ 51.8% of TSP at Seoul toll and 34.8 $\sim$ 54.8% at Suwon. 3. The concentration of respirable particle les than 7$\mum$ measured by personal air sampler was higher in Seoul toll booth than that of Suwon and it seems to be influenced by the exhausion of diesel engine. Especially the concentration of respirable particle of reformed toll booth with air curtain was 20% lower than unreformed one. 4. Concentration of Pb among suspended particles around Seoul toll was 5 times higher than Pb of Suwon toll. So it is considered that there were other possible pollution source of Pb beyond heavy traffic in Seoul toll area. The amount of Pb inside toll booth was extremely small but the concentration of benzo(a)pyrene showed a trend of increase according to traffic stagnation. 5. The concentration of $SO_2$ arround toll showed no difference between weekday and weekend and also showed no relation with traffic load. But the concentration of $NO_2$ was affected by traffic load.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.