• Title/Summary/Keyword: Waterway

Search Result 387, Processing Time 0.029 seconds

A Study on the Validity of Proper Maximum Navigation Speed in a Straight Waterway (직선항로에서의 적정 최대속력에 대한 타당성 검토에 관한 연구)

  • Park, Young-Soo;Jong, Jae-Yong;Park, Jin-Soo
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2006.05a
    • /
    • pp.53-58
    • /
    • 2006
  • Recently, vessel's average speed in the sea becomes fast because of the increasing of high-speeds vessel like a container ship and ferry. So, it is considered that speed control in the korean narrow waterway isn't the proper vessel traffic management, now. And, there is a rare paper studied about speed control quantitatively and numerically, especially speed control is discussing continuously, as abrogation of Incheon Port's speed control and alleviation of Kwangyang Port's speed control a according to navigating mariner's request. After this paper replayed the navigation traffic flow in the straight waterway using marine traffic flow simulation, the Environmental Stress Model is introduced to evaluate difficulty of each vessel's traffic.

  • PDF

Estimation of the Traffic Flow in the Korea Coastal Waterway by Computer Simulation (우리나라 연안의 해상교통관제시스템 설치를 위한 기초연구 시뮬레이션에 의한 우리나라 연안의 해상교통량 추정)

  • 구자윤;박양기;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.12 no.1
    • /
    • pp.85-112
    • /
    • 1988
  • From the point of view of safety of life and property at sea and the protection of the marine environment, the Vessel Traffic Management System along the Korea coastal waterway is inevitably introduced. But the establishing priority per area must be evaluated under the restricted budget. In this case, the estimated traffic flow has a major effect on priority evaluation. In the former paper , an algorithm was proposed for estimating the trip distribution between each pair of zones such as harbours and straits. This paper aims to formulate a simulation model for estimating the dynamic traffic flow per area in the Korea coastal waterway. The model consists of the algorithm constrined by the statistical movement of ships and the observed data, the regression analysis and the traffic network evaluations. The processed results of traffic flow except fishing vessel are summarized as follows ; 1) In 2000, the traffic congestions per area are estimated, in proportion of ship's number (tonnage), as Busan area 22.3%(44.5%), Yeosu area 19.8%(11.2%), Wando-Jeju area18.1%(6.8%), Mokpo area 14.9%(9.9%), Gunsan area 9.1%(9.3%), Inchon area 8.1%(7.7%), Pohang area 5.5%(8.5%), and Donghae area 2.2%(2.1%). 2) For example in Busan area, the increment of traffic volume per annum is estimated 4, 102 ships (23 million tons) and the traffic flow in 2000 is evaluated 158, 793 ships (687 million tons). 3) consequently, the increment of traffic volume in Busan area is found the largest and followed by Yeosu, Wando-Jeju area. Also, the traffic flow per area in 2000 has the same order.

  • PDF

Assessment of External Force Acting on Ship Using Big Data in Maritime Traffic (해상교통 빅데이터에 의한 선박에 작용하는 외력영향 평가에 관한 연구)

  • Kim, Kwang-Il;Jeong, Jung Sik;Park, Gyei-Kark
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.23 no.5
    • /
    • pp.379-384
    • /
    • 2013
  • For effective ship management in VTS(Vessel Traffic Service), it needs to assess the external force acting on ship. Big data in maritime traffic can be roughly categorized into two groups. One is the traffic information including ship's particulars. The other is the external force information e.g., wind, sea wave, tidal current. This paper proposes the method to assess the external force acting on ship using big data in maritime traffic. To approach Big data in maritime traffic, we propose the Waterway External Force Code(WEF code) which consist of wind, wave, tidal and current information, Speed Over the Water(SOW) of each ship, weather information. As a results, the external force acting a navigating ship is estimated.

A Study on Flow Zone Development and Bottom Change by Propeller Jets from Ships (선박추진기에 의한 흐름발달과 해저면변화에 대한 연구)

  • 이지훈;이중우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2002.11a
    • /
    • pp.139-145
    • /
    • 2002
  • The flow zone through propeller jets are used in evaluating the environmental and constructional effects of navigation on the waterway. It relies on the characteristics of ships and water depth. A numerical model using the momentum theory of the propeller and Shield's diagram was developed in a restricted waterway. Equations for discharge are presented based on thrust coefficients and propeller speed and are the most accurate means of defining discharge. Approximate methods for discharge are developed based on applied ship's power. Equations for discharge are as a function of applied power, propeller diameter, and ship speed. Water depth of the waterway and draft of the shop are also necessary for the calculation of the grain size of the initial motion. The velocity distribution of discharge from the propeller was simulated by the Gaussian normal distribution function. The shear velocity and shear stress were from the Sternberg's formula. Case studies to show the influence of significant factors on sediment movement induced by the ship's propeller at the channel bottom are presented.

  • PDF

A Study on the Towing Force of Heavy Loaded Barge against Strong Current (강조류에서 중량물 운반 부선의 예인력에 관한 연구)

  • Kim, Chol-Seong;Rim, Geug-Soo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.2
    • /
    • pp.179-185
    • /
    • 2011
  • A marine collision accident occurred at the Jin-do water way. A barge loaded with heavy equipment of Power Generation Plant was being towed at its side by two tugs "A" and "B" from Byeg-pa harbour to the designated position to be used for power generation plant near Jin-do bridge. The Power Generation Plant was 40-meters high loaded atop the barge. When the "tugs and tow" were approaching the Jin-do the bridge, the two towing tugs lost maneuvering control of the barge and it went off-course, hit first the waterway embankment and finally struck the lower part of bridge's span and post musing the barge to capsize and sunk its cargo into the sea. The bridge also suffered damages where the top of the Plant struck At the time of the accident, there was a strong tidal current at the waterway. This paper calculates the safe towing force of barges with heavy loads when traversing in a strong tidal current situation in narrow waterway.

Development of the Speed Limit Model for Harbour and Waterway(II) - The Method of Speed Limit Decision and Application -

  • Kim, Deug-Bong;An, Kwang
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.3
    • /
    • pp.274-282
    • /
    • 2015
  • This research is the result on calculating the logical speed limit through certain process which some elements must be considered on selecting the speed limit of harbour and waterway. The suggested speed limit select model on this research is processed from 1~6 steps by forming a professional group of experts. Each step has its information which 1st step(water division), 2nd step(selecting the model vessel and vessel applied with speed limit.), 3rd step(selecting the maximum and minimum speed range on each section), 4th step(evaluation on the safeness of traffic), 5th step(suggesting the appropriate speed limit), 6th step(execution and evaluation.). The appropriate speed limit was decided on consideration of the safety of maritime traffic on the range of the maximum speed and the minimum speed. This model was used to derive the appropriate speed limit on the harbour water and Busan harbour entrance waterway. As the result, the harbour water was calculated to be 6.9 knots, the appropriate speed limit of Busan entrance harbour was 9.3 knots. The present calculation of the speed limit on the approaching channel area is 10 knots, inner harbour area is 7 knots, which are similar to the result of the speed limit. This research is the first research on selecting the speed limit model and has its limits on finding the perfect speed limit result. More detailed standards on the safeness of traffic evaluation must be found and additional study is necessary on discriminating consideration of the elements. This research has its value which it provides instances of aboard cases on guidelines of selecting the speed limit.

A Study on Current Characteristics Based on Design and Performance Test of Current Generator of KRISO's Deep Ocean Engineering Basin

  • Kim, Jin Ha;Jung, Jae Sang;Hong, Seok Won;Lee, Chun Ju;Lee, Yong Guk;Park, Il Ryong;Song, In Haeng
    • Journal of Ocean Engineering and Technology
    • /
    • v.35 no.6
    • /
    • pp.446-456
    • /
    • 2021
  • To build an environment facility of a large-scale ocean basin, various detailed reviews are required, but it is difficult to find data that introduces the related research or construction processes on the environment facility. The current generator facility for offshore structure safety evaluation tests should be implemented by rotating the water of the basin. However, when the water in the large basin rotates, relatively large flow irregularities may occur and the uniformity may not be adequate. In this paper, design and review were conducted to satisfy the performance goals of the DOEB through computational numerical analysis on the shape of the waterway and the flow straightening devices to form the current in the large tank. Based on this, the head loss, which decreases the flow rate when the large tank water rotates through the water channel, was estimated and used as the pump capacity (impeller) design data. The impeller of the DOEB current generator was designed through computational numerical analysis (CFD) based on the lift surface theory from the axial-type impeller shape for satisfying the head loss of the waterway and maximum current velocity. In order to confirm the performance of the designed impeller system, the flow rate and flow velocity performance were checked through factory test operation. And, after installing DOEB, the current flow rate and velocity performance were reviewed compare with the original design target values. Finally, by measuring the current velocity of the test area in DOEB formed through the current generator, the spatial current distribution characteristics in the test area were analyzed. Through the analysis of the current distribution characteristics of the DOEB test area, it was confirmed that the realization of the maximum current velocity and the average flow velocity distribution, the main performance goals in the waterway design process, were satisfied.

Analysis on Downtime element of Gripper TBM based on field data (현장 데이터 분석을 통한 Gripper TBM의 Downtime 요소 분석)

  • Park, Jinsoo;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.393-402
    • /
    • 2021
  • The first TBM introduced in Korea was the gripper TBM, which was applied to the Gudeok Waterway Tunnel in 1985. In the initial stage of the introduction of the gripper TBM, many applications were mainly focused on waterway tunnels (Tunnel Mechanized Construction Design, 2008). Currently, the construction range of gripper TBM in Korea is widely applied to not only waterway tunnels, but also subways, railway tunnels, and TBM+NATM expansion. Overseas, gripper TBM is generally applied, and even when NATM tunnel is applied, it is applied as an exploration tunnel because of the excellent advance rate of gripper TBM and used as an evacuation tunnel after completion. Due to the fast excavation speed, the application of the gripper TBM in the rock section of weathered rock or higher can minimize the environmental and civil complaints caused by creating a large number of work areas when planning long tunnels or mountain tunnels. In this study, the work process of the general gripper TBM was analyzed by analyzing the construction cycle and the gripper TBM with a diameter of 2.6~5.0 m, which was applied the most in Korea. Downtime was investigated and analyzed.

The Prototype and Structure of the Water Supply and Drainage System of the Wolji Pond During the Unified Silla Period (통일신라시대 월지(月池) 입·출수 체계의 원형과 구조)

  • Kim, Hyung-suk;Sim, Woo-kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.4
    • /
    • pp.124-141
    • /
    • 2019
  • This research explored the relationship between the water quality issue of Wolji Pond (Anapji Pond) with the maintenance of the channel flow circulation system. The water supply and drainage system closely related to the circulation system of pond has been reviewed, rather than the existing water supply and drainage system that has been analyzed in previous studies. As a result of reviewing the water supply system, it has been learned that the water supply system on the southeastern shore of Wolji Pond, being the current water supply hole, has been connected to the east side garden facility (landscaping stone, curved waterway, storage facility of water) between the north and south fence and the waterway. This separate facility group seems to have been a subject of the investigation of the eastern side of Wolji Pond, with the landscaping stones having been identified in the 1920's survey drawings. The water supply facility on the southeastern shore, being the suspected water supply hole, seems to have some connection with the granite waterway remaining on the building site of Imhaejeon (臨海殿) on the southern side of Wolji Pond. It is inferred that it provides clean water, seeing that the slope towards the southwestern shore of Wolji Pond becomes lower, the landscaping stones have been placed in the filter area, and it is present in the 1920's survey drawings and the water supply hole survey drawing of 1975. The water drainage facility on the northern shore is composed of five stages. The functions of the wooden waterway and the rectangular stone water catchment facility seem not to be only for the water drainage of Wolji Pond. In light of the points that there are wood plugs in the wooden waterway and that there is a water catchment facility in the final stage, it is judged that the water of Balcheon Stream (撥川) may be charged in reverse according to this setup. Namely, the water could enter and exit in either direction in the water drainage facility on the northern shore It also seems that the supply to the wooden waterway could be opened and shut through the water catchment facility of rectangular stone group as well. The water drainage facility on the western shore is very similar to the water drainage facility on the northern shore, so it is difficult to avoid the belief that it existed during the Silla Dynasty, or it has been produced by imitating the water drainage facility on the northern shore at some future point in time. It seems to have functioned as the water drainage facility for the supply of agricultural water during the Joseon Dynasty. The water supply and drainage facilities in Wolji Pond have been understood as a systematized distribution network that has been intertwined organically with the facility of Donggung Palace, which was the center of the Silla capital. Water has been supplied to each facility group, including Wolji Pond, through this structure; it includes the drainage system connecting to the Namcheon River (南川) through the Balcheon Stream, which was an important canal of the capital center.

Characteristics of Sea Exchange in Gwangyang Bay and Jinju Bay considering Freshwater from Rivers (하천유출수를 고려한 광양만과 진주만의 해수교환 특성)

  • Hong, Doung;Kim, Jongkyu;Kwak, Inn-Sil
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.2
    • /
    • pp.201-211
    • /
    • 2022
  • At the center of the Noryang waterway, the Gwangyang bay area (including the Yeosu Strait) is located at the west, and the Jinju bay area (including Gangjin bay and Sacheon bay) is located at the east. Freshwater from several rivers is flowing into the study area. In particula,r the event of flood, great quantities freshwater flow from Seomjingang (Seomjin river) into the Gwangyang bay area and from Gahwacheon (discharge from Namgang Dam) into the Jinju bay. The Gwangyang and Jinju bay are connected to the Noryang waterway. In addition, freshwater from Seomjingang and Gahwacheon also affect through the Noryang waterway. In this study, we elucidated the characteristics of the tidal exchange rate and residence time for dry season and flood season on 50 frequency, considering freshwater from 51 rivers, including Seomjingang and Gahwacheon, using a particle tracking method. We conducted additional experiments to determine the effect of freshwater from Seomjingang and Gahwacheon during flooding. In both the dry season and flood season, the result showed that the particles released from the Gwangyang bay moved to the Jinju bay through the Noryang waterway. However, comparatively small amount of particles moved from the Jinju bay to the Gwangyang bay. Each experimental case, the sea exchange rate was 44.40~67.21% in the Gwangyang bay and 50.37~73.10% in the Jinju bay, and the average residence time was 7.07~15.36days in the Gwangyang bay and 6.45~12.75days in the Jinju bay. Consequently the sea exchange rate increased and the residence time decreased during flooding. A calculation of cross-section water flux over 30 days for 7 internal and 5 external areas, indicated that the main essential flow direction of the water flux was the river outflow water from Seomjingang flow through the Yeosu strait to the outer sea and from Gahwacheon flow through Sacheon bay, Jinju bay and the Daebang waterway to the outer sea.