• Title/Summary/Keyword: Waterway

Search Result 387, Processing Time 0.034 seconds

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

Development of Flood Routing Model in the Navigation Waterway to Support Operations of Weir and Flood Gate (가동보 및 배수문운영을 고려한 주운수로 홍수위 산정모형 구축)

  • Noh, Joon-Woo;Park, Myung-Ki;Shim, Myung-Geun;Lee, Sang-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.9
    • /
    • pp.959-968
    • /
    • 2012
  • HEC-RAS has been applied to simulate water level variation in the Ara waterway during the flood season. To support decision making necessary for operation of the hydraulic structures especially during the flood season, it is important to consider various factors such as water level of the Han River, Gulpo River, and tidal level of the west sea in conjunction with operation of the hydraulic structures such as the Gyulhyun Weir, the West sea gate, and pumping stations. Especially for operation of the west sea gate, the Rule-script option was employed to determine the opening height considering the variation of the water level in the waterway and the west sea simultaneously. For model verification, comparison of water level computed at the upstream and downstream of the regulation weir shows a good agreement with observed data measured during the flood event in September 2010. The HEC-RAS model developed in this study will contribute to support operation of the waterway during the flood season.

Landscape Design of Gyeong-In Ara Waterway (경인 아라뱃길 친수경관 기본설계)

  • An, Byung-Chul;Shin, Hyun-Don
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.2
    • /
    • pp.119-129
    • /
    • 2010
  • This study concerns the design strategy for the waterside of Gyeong-In Ara Waterway, Korea’s first constructed canal. This design focused on the creation of a new paradigm for waterway landscapes the major factors of which were geographical advantage, value of landscape and efficient approach. As the major space plan for the waterfront formed through the Gyeong-In Ara waterway from the Yellow Sea to the Han River, eight good views of the waterfront zone were designed by utilizing the waterway as a scenery viewpoint and, by constructing two traffic lanes for the scenic parkway connecting Incheon and the Gimpo terminal, both a linear greenway as well as various waterfront facilities were also designed. A boardwalk and bike path connecting the major theme parks were planned, and a waterfront pocket park was then organized based on the bike path. In this study, the result of the new waterfront result from the Gyeong-In Ara waterway was planned to have an identity as a new waterside culture space in order to achieve multiple functions including environmental, cultural, leisure, and tourism as well as management programs based on a variety of applied culture content and story-telling.

A Study on the Waterway Restoration and its Utilization of the Yeongsan River (영산강의 주운복원과 활용방안 연구)

  • Kim, Jong-Il
    • Journal of the Korean association of regional geographers
    • /
    • v.11 no.1
    • /
    • pp.40-53
    • /
    • 2005
  • The Yeongsan River had played an important role as s waterway, but in 1981, the Yeongsan River Estuarin Barrage had been constructed, the waterway had been cut off. Since then, in the lower Yeongsan River basin, discussions about the waterway restoration and its utilization of the Yeongsan River has been proposed. But these discussions have not been examined thoroughly with geomorphological and hydrological characteristics of river charmel The waterway restoration and its utilization in the Yeongsan River should be based on scientific validity. In case of considering the conditions of the Yeongsan River, it is desired that the small ship for environmental survey and ecotourism is navigable from Gujinpo to Yeongsan River Estuarin Barrage by dredging a parts of river channel. To devise a plan about restoration and its utilization of waterway, it is necessary that regional and local governments, related administrative agencies, specialists, and NGO should develop the participation and cooperation systems based on governance.

  • PDF

A Study on the Establishment of Rules of Safe Navigation and Management for Gyeongin Ara Waterway (경인 아라뱃길 안전운항 및 관리규칙 제정에 관한 연구)

  • Yun, Giw-Ho;Kim, Jin-Kwon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.3
    • /
    • pp.235-243
    • /
    • 2011
  • Gyeongin Ara Waterway will be open on Oct., 2011, Which is the first inland artificial waterway constructed in Korea. There have been arguments about the environmental issues and economic effectiveness, however, it's now time to focus on the safety of navigation at the waterway to protect human life, property and environment. Therefore this paper aims at examining the establishment of the rule of safe navigation and management for the safe and effective management of the waterway and tries to draft the rules based on these examinations. The draft rule consists of 7 chapters, which are general rules, general rules on navigation, specific rules on navigation, general restrictions, emergency response, restrictions on navigation and penalties in consideration of the characteristic of Gyeongin Ara Waterway and regulations on navigation in major canals in the world.

Analysis of Correlation between Marine Traffic Congestion and Waterway Risk based on IWRAP Mk2 (해상교통혼잡도와 IWRAP Mk2 기반의 항로 위험도 연관성 분석에 관한 연구)

  • Lee, Euijong;Lee, Yun-sok
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.5
    • /
    • pp.527-534
    • /
    • 2019
  • Several types of mathematical analysis methods are used for port waterway risk assessment based on marine traffic volume. In Korea, a marine traffic congestion model that standardizes the size of the vessels passing through the port waterway is applied to evaluate the risk of the waterway. For example, when marine traffic congestion is high, risk situations such as collisions are likely to occur. However, a scientific review is required to determine if there is a correlation between high density of maritime traffic and a high risk of waterway incidents. In this study, IWRAP Mk2(IALA official recommendation evaluation model) and a marine traffic congestion model were used to analyze the correlation between port waterway risk and marine traffic congestion in the same area. As a result, the linear function of R2 was calculated as 0.943 and it was determined to be significant. The Pearson correlation coefficient was calculated as 0.971, indicating a strong positive correlation. It was confirmed that the port waterway risk and the marine traffic congestion have a strong correlation due to the influence of the common input variables of each model. It is expected that these results will be used in the development of advanced models for the prediction of port waterway risk assessment.

Assessment of Attraction Efficiency of By-pass Fishway at Dalseong Weir According to Operating Attraction Waterway (유인수로의 운영에 따른 달성보 인공하도식 어도의 유인효율 평가)

  • Park, Ji Hyun;Ku, Young Hun;Baek, Kyong Oh;Kim, Young Do
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.1
    • /
    • pp.1-11
    • /
    • 2015
  • In this study, the attraction efficiency of the by-pass fishway installed at Dalseong Weir in Nakdong River was assessed according to operation of the attraction waterway by using River2D which is a two-dimensional physical habitat simulation model. The model was calibrated and validated through the measured water elevation. The attraction efficiency of the fishway was evaluated at the low flow condition because the target fish, Zacco platypus (Z. platypus), have moved frequently up and downstream at the spawning season from April to June. From simulation results, it can be deduced that the attraction efficiency at situation of open attraction waterway is superior to that of close attraction waterway. Also it is shown that velocity field at inner region of the fishway is suitable for migration of the fish.

Relation between Groundwater Inflow into the Waterway Tunnel and Hydrogeological Characteristics in Hyeonseo-myeon, Cheongsong-gun, Korea (청송군 현서면 일대 도수로터널내 지하수 유입량과 수리지질 특성의 관련성)

  • 박재현;함세영;성익환;이병대;정재열
    • The Journal of Engineering Geology
    • /
    • v.11 no.2
    • /
    • pp.141-152
    • /
    • 2001
  • The waterway tunnel zone (length 1,484m) in the Hyeonseo-myeon area that is a part of Yeongcheon dam waterway tunnel has been studied to characterize the relationship between groundwater inflow into the waterway tunnel and hydrogeologic characteristics. The effects of sandstone thickness in the tunnel section. fracture density, fracture aperture and spacing, fault zone width and hydraulic conductivity on the early inflow (inflow prior to the lining and grouting) are investigated. The relationship between fracture density and hydraulic conductivity is also considered. The result of the study suggests that fault zone width has the greatest effect on groundwater inflow into the tunnel, and sandstone thickness, hydraulic conductivity and fracture density in order shows an influence on the inflow.

  • PDF

Evaluation of Pollutant loads at Inflow Streams under Ara Waterway Basin

  • Han, Sangyun;Jung, Jongtai
    • Journal of Urban Science
    • /
    • v.10 no.1
    • /
    • pp.39-48
    • /
    • 2021
  • In this study, to evaluate the characteristics of the pollution in the major inflow tributaries and major environmental facilities in the watershed of Ara waterway, An inflow flow rate measurement and water quality analysis were conducted during dry and rainy seasons. In addition, the flow rate measurement, water quality analysis, and pollutant load at each monitoring point were compared and evaluated. Influx of BOD5, T-P and T-N into the tributaries of the ARA waterway watershed, excluding the Gulpo river watershed, during dry season were only 0.007%, 0.005% and 0.004% respectively of the incoming loads in the entire ARA waterway basin. In addition, it was confirmed that the discharge pollutant loads during rainfall event was about 440 times more for BOD5, about 545 times on T-P, and about 23 times on T-N in comparison to the pollutant loads during the dry days. When the Gulhyeon rubber dam was deflated, the discharged pollutant load during a rainfall was higher than the estimated load at the G7 monitoring point because the deposited pollutants from the upstream riverbed flowed down. Therefore, during a rainy season, it is necessary to manage the influx of high-load water pollutants from the overflow and deflation of the Gulhyun rubber dam as well as to find a strategy to reduce the pollutant loads in the Gulpo river watershed.

APPLICATION AND FUNCTIONAL REQUIREMENTS OF SIMULATOR IN HARBOR AND WATERWAY DESIGN

  • Shi, Chaojian
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2001.10a
    • /
    • pp.142-152
    • /
    • 2001
  • The roles and importance of the application of simulator in harbor and waterway design are emphasized. Different methods of simulation and their application are described. A large-scale simulation concept, group simulation, is proposed. Requirements of the simulator for accomplishing the tasks properly and effectively are suggested. Some points on modeling of ship hydrodynamics and environmental factors, welch are critical especially in waterway design simulation are discussed and algorisms presented.

  • PDF