• Title/Summary/Keyword: Water time

Search Result 15,259, Processing Time 0.047 seconds

Quality Characteristics of Chalduk according to the Soaking Time of Glutinous Rice in Water (수침 시간을 달리한 찹쌀가루로 제조한 찰떡의 품질 특성)

  • Jung, Eun-Jin;Woo, Kyung-Ja
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.16 no.6
    • /
    • pp.677-683
    • /
    • 2006
  • Glutinous rice cake(Chalduk) was made by varying the hours of soaking time of glutinous rice in the water(0, 4, 8, 12, 24 hours). After storage for various periods, the sensory and physical characteristics and the degree of gelatinization were examined in order to determine the effect of glutinous rice soaking period on the quality of Chalduk. The results of the study are summarized as follows. In the sensory test, 8-hour water soaking produced the significantly highest score for salty taste, while 0-hour water soaking had the lowest score. Four-hour water soaking had the significantly highest score for the degree of chewiness. Eight-hour water soaking had the significantly highest score for overall desirability. For the moisture content of Chalduk covered with bean flour, 8-hour water soaking produced the highest moisture content but the difference was not significant. For the degree of gelatinization, 8-hour water soaking had the highest maltose content, which confirmed the suitability of 8-hour water soaking glutinous rice. Eight-hour water soaking had the lowest hardness. With increasing storage period, the hardness sharply increased. Elasticity was higher for the long-period immersed samples than for the non-immersed samples. In conclusion, an 8-hour soaking time for glutinous rice in water was proposed to maximize the Chalduk quality.

  • PDF

Seasonal Variation of Water Temperature and Dissolved Oxygen in the Youngsan Reservoir (영산호 수온과 용존산소의 계절적 변화에 관한 연구)

  • Park, Yongwoo;Cho, Kian;Cho, Cheol
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.1
    • /
    • pp.44-53
    • /
    • 2008
  • To recognize the spatial and temporal variability of water temperature and dissolved oxygen in the Youngsan reservoir formed after dike construction, water temperature and dissolved oxygen data have been observed and analyzed from April, 2002 until March, 2003. As the results, certain stratifications were not distinctly observed in the Youngsan reservoir during summer, which was estimated due to the drainage characteristic from the Youngsan water gates. The yearly variation of water temperature in the Youngsan reservoir is shown seasonally ups and downs by the heat exchange between the atmosphere and the reservoir. On the other hand, dissolved oxygen and water temperature in the Youngsan reservoir have been shown inversed proportional correlation. As the calculation results of residence time and water exchange rate, it is considered that the feature of oxygen distribution is determined by the drainage characteristics caused the shortest residence time during summer, which also disturbed the formation of stratification in the Youngsan reservoir.

The Characteristics of Diurnal Changes in the Tissue-Water Relations of Pueraria thunbergiana (칡(Pueraria thunbergiana) 조직수분관계의 일변화 특성)

  • 박용목;최창렬
    • The Korean Journal of Ecology
    • /
    • v.21 no.1
    • /
    • pp.89-96
    • /
    • 1998
  • The diurnal changes of the stomatal conductance, transpiration and leaf water potential were measured in order to assess the water relations characteristics of Pueraria thunbergiana in August of 1995 and 1996. The results showed two different responses depending on the duration of rainless days. The microclimatic conditions were highly stressful on 2 August. Daily maximum temperature reached to $39.0{\circ}C$ and vapor pressure deficit was 3.55 KPa. During this time the leaf water potential decreased to -1.02 MPa and a marked reduction of stomatal conductance was shown. However, on 15 August the stomatal conductance increased with increment of photon flux density, and transpiration was highly maintained during the day time. Minimum leaf water potential was only -0.47 MPa in spite of high transpiration rate. Furthermore, on 15 August reduced leaf water potential during the day time was recovered rapidly with decrease of photon flux density, whereas recovery of leaf water potential on 2 August was delayed. However, reduced leaf water potential on 2 August was recovered untile the next dawn. Osmotic potential at turgor loss point of Pueraria thunbergiana on 2, 3 and 15 August was -1.79, -1.70 and -1.60 MPa, respectively. The vapor pressure deficit is more contributive to the regulation of stomatal conductance than leaf water potential.

  • PDF

Significance of Ground Water Movements in the Numerical Modelling of Tunnelling (터널해석에 있어 지하수 거동의 중요성)

  • 신종호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.257-264
    • /
    • 2003
  • Tunnelling in water bearing soils influences the ground water regime. It has been indicated in the literature that the existence of ground water above a tunnel influences tunnel stability and the settlement profile. Only limited research, however, has been done on ground water movements around tunnels and their influence on tunnel performance. Time dependent soil behaviour can be caused by the changes of pore water pressure and/or the viscous properties of soil(creep) under the stress change resulting from the advance of the tunnel face. De Moor(1989) demonstrated that the time dependent deformations due to tunnelling are mainly the results of pore pressure dissipation and should be interpreted in terms of effective stress changes. Drainage into tunnels is governed by the permeability of the soil, the length of the drainage path and the hydraulic boundary conditions. The potential effect of lime dependent settlement in a shallow tunnel is likely to occur rapidly due to the short drainage path and possibly high coefficient of consolidation. Existing 2D modelling methods are not applicable to these tunnelling problems, as it is difficult to define empirical parameters. In this paper the time-based 2D modelling method is adopted to account for the three dimensional effect and time dependent behaviour during tunnel construction. The effect of coupling between the unloading procedure and consolidation during excavation is profoundly investigated with the method. It is pointed out that realistic modelling can be achieved by defining a proper permeability at the excavation boundary and prescribing appropriate time for excavation Some guidelines for the numerical modelling of drained and undrained excavation has been suggested using characteristic time factor. It is highlighted that certain range of the factor shows combined effect between the unloading procedure due to excavation and consolidation during construction.

  • PDF

Development of Wireless Real Time River Water Quality Management System with GPS and GIS (GIS와 GPS를 연계한 무선 실시간 하천수질관리시스템 개발)

  • Yi, Jae-Eung;Ha, Sang-Min;Lee, Jong-Kook
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.4 s.7
    • /
    • pp.69-75
    • /
    • 2002
  • In this paper the development of a real time river water quality management system is described. This system can manage a river water quality fluctuation by finding out abnormal conditions quickly and exactly. The GIS based monitoring system collects various properties of river water quality through the wireless real time network. Tanchun, the first branch of the Han River was selected as the target basin of the system development. This system is composed of three parts - wireless real time field measuring system with a GPS receiver, a server computer and a GIS platform. After the first field test in Tanchun basin, the result showed the many possibilities of measuring various water quality properties in real time and storing the data and analyzing them within the GIS environment in real time in very efficient manners. It is expected that the developed system will contribute to the efficient management of a river water quality control and water quality related disaster prevention purposes.

Analysis of Problems of Water Supply Capacity Determination in Water Resources Systems (수자원시스템의 용수공급량 결정방법의 문제점 분석)

  • Lee, Gwang-Man;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.4
    • /
    • pp.331-342
    • /
    • 2014
  • In water resources planning, to decide proper water supply capacity is a very important task. Once water supply system such as a dam is decided, it will affect whole range of water resources circumstances for a long time. Even though systematic approaches have been implemented since 1980, many problems are still prevail in reality. Especially some issues related to the reliability analysis method used in planning dams in Korea have been persistently brought up. This study is to diagnose problems on the reliability criterion in water supply capacity assessment of water resources systems and discuss a valid method. As a result, the estimates by the different analysis time intervals, in case of the temporal reliability, show no large difference, but there is a large difference when assessment time intervals are differently applied. The volumetric reliability accounts for 2~3% higher than that of the temporal reliability, and resiliency and vulnerability also show large differences by the analysis time intervals.

Water level forecasting for extended lead times using preprocessed data with variational mode decomposition: A case study in Bangladesh

  • Shabbir Ahmed Osmani;Roya Narimani;Hoyoung Cha;Changhyun Jun;Md Asaduzzaman Sayef
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.179-179
    • /
    • 2023
  • This study suggests a new approach of water level forecasting for extended lead times using original data preprocessing with variational mode decomposition (VMD). Here, two machine learning algorithms including light gradient boosting machine (LGBM) and random forest (RF) were considered to incorporate extended lead times (i.e., 5, 10, 15, 20, 25, 30, 40, and 50 days) forecasting of water levels. At first, the original data at two water level stations (i.e., SW173 and SW269 in Bangladesh) and their decomposed data from VMD were prepared on antecedent lag times to analyze in the datasets of different lead times. Mean absolute error (MAE), root mean squared error (RMSE), and mean squared error (MSE) were used to evaluate the performance of the machine learning models in water level forecasting. As results, it represents that the errors were minimized when the decomposed datasets were considered to predict water levels, rather than the use of original data standalone. It was also noted that LGBM produced lower MAE, RMSE, and MSE values than RF, indicating better performance. For instance, at the SW173 station, LGBM outperformed RF in both decomposed and original data with MAE values of 0.511 and 1.566, compared to RF's MAE values of 0.719 and 1.644, respectively, in a 30-day lead time. The models' performance decreased with increasing lead time, as per the study findings. In summary, preprocessing original data and utilizing machine learning models with decomposed techniques have shown promising results for water level forecasting in higher lead times. It is expected that the approach of this study can assist water management authorities in taking precautionary measures based on forecasted water levels, which is crucial for sustainable water resource utilization.

  • PDF

Comparison Analysis of Ready to Use Time Depending on The Type of Public Fire Hydrant of Fire-fighting Water Facility (소방용수시설의 공설소화전 종류에 따른 사용 준비시간 비교분석)

  • Jeon, Jai-In;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.87-92
    • /
    • 2019
  • The purpose of this study is to investigate the preparation time of fire-fighting water for public fire hydrants and ground, underground fire hydrants. The equipment preparation time for stage 1 was 20.50 seconds for ground type and 24.67 seconds for underground type. The reason for this difference in preparation time is that an underground fire hydrant requires additional standpipes to connect to the main conduit of Paru and the underground hydrant, which open the manhole cover. Water tank Maintenance joint with water hose male coupling of the second stage was similar to that of the ground type of 48.50 seconds and underground water tipe of 49.00 seconds. This is because the operation of connecting the fire hose to the maintenance tank of the water tank car is the same. In the third stage, the water pipe connection was 43 seconds for ground type and 174.33 seconds for underground type. The reason why the time for connecting the water pipe to the fire hydrant is large difference is that the underground fire hydrant is opened by opening the manhole cover, After connecting the stand pipe to the fire hydrant, the additional process of connecting the water pipe to the stand pipe is required, which is considered to have greatly increased the time required. The opening of Water Control Valve and spindle Valve in the fourth stage was 66.50 seconds for the ground type and 78.83 seconds for the underground type. This difference is due to the fact that the spindle of the ground fire hydrant is located on the main body and can be easily opened, but the underground type is located next to the main body under the manhole and requires additional time to connect the opening equipment.

Time Series Simulation of Explosive Charges In Shallow Water Using Ray Approach

  • Hahn, Jooyoung;Lee, Seongwook;Na, Jungyul
    • The Journal of the Acoustical Society of Korea
    • /
    • v.22 no.3E
    • /
    • pp.133-140
    • /
    • 2003
  • A time series simulation is presented by a ray approach for the simulating the received waveform of a broadband acoustical signals interacting with the ocean boundaries. The environment is assumed to be horizontally stratified, and the seafloor is described in terms of homogeneous fluid half-space. The ray approach includes the effects of reflection from the air-water, water-sediment interface and phase shifts due to boundaries interaction. To generate time series, we assume that the acoustic energy propagates from source to receiver along eigenrays and represent the action of the bottom on the incident wave by a linear filter and characterized in the frequency domain by the transfer function. As example application, the time series for an explosive source in a shallow water environment is calculated and analyzed in terms of acoustical process. good agreement with measured time series is demonstrated.

An Effect on the Properties of Antiwashout Underwater Concrete by mixing time and mixing quantity (배합시간과 배합량이 수중불분리성 콘크리트의 특성에 미치는 영향)

  • 박세인;김동명;김종수;김명식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.345-350
    • /
    • 2000
  • The objective of this study makes investigation into the effect on the properties of underwater antiwashout concrete. which is followed by mixing time and mixing quantity. There is an tendency that (the compressive strength of underwater antiwashout concrete made and cured in fresh water or sea water) is increase when dry mixing time, mixing quantity, total mixing time is increase as unit weight grows. The difference of compressive strength (in case of no dry mixing time and 60 second) is averagely 46.8kgf/㎠ in the fresh water and 35.6kgf/㎠ in sea water. it's considered that dry mixing is dispersed by underwater antiwashout admixture.

  • PDF