• 제목/요약/키워드: Water supply piping

검색결과 53건 처리시간 0.026초

급수배관방식에 따른 욕실 위생기구의 유량분석에 관한 연구 (A Study on the Flow rate Analysis of a Sanitary Fixture for Water Supply Piping System)

  • 장영근;김덕주;서병택
    • 한국기계기술학회지
    • /
    • 제13권4호
    • /
    • pp.9-14
    • /
    • 2011
  • The flow rate analysis for sanitary fixtures has been studied to determine the water supply piping system and size. The study has been carried out to analyze for a various water supply pressure and piping size theoretically. Also, the study has been carried out to analyze for a various water supply piping system experimentally. The water supply pressure is varied from 0.01MPa to 0.07MPa, and the piping size is varied from 6mm to 15mm. The water supply piping systems are one-to-one, all-loop-type, and bathroom-loop-type water supply piping system. The results indicate that the piping size is able to supply water fully in case of smaller than 15mm if the water supply pressure keep an necessary minimum pressure. And the gap of flow rate is very little for the various water supply piping systems.

급수관로계에 설치된 수격흡수기의 수격흡수효과에 관한 실험적 연구 (Experimental Study on the Water Hammer Absorption Effects of Water Hammer Arrester in the Water Supply Piping System)

  • 최중근;이석종;이명호;성재용
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제30권3호
    • /
    • pp.396-402
    • /
    • 2006
  • In this study, dynamic characteristics of water hammer pressure in water supply piping system with water hammer arrester has been investigated experimentally to characterize the transient pressure of water hammer in high rise building. Experiments were conducted to verify the absorption effects by water hammer arresters with 3 different gas volumes of water hammer pressure generated by sudden valve closure. As the results, it has been found that zoning and sizing of pipe diameter for suitable flow velocity and water hammer arresters with effective pressure absorption capacity have to be installed to protect water hammer problems in building water supply piping system.

사무소 건물의 급수배관경 산정을 위한 동시사용유량에 관한 연구 (The evaluation of the simultaneous flow rate for sizing the water supply piping in the office building)

  • 이용화
    • 설비공학논문집
    • /
    • 제11권4호
    • /
    • pp.511-517
    • /
    • 1999
  • Determining the simultaneous flow rate in any particular section of piping is the important step in order to determine the size of water supply piping. Now we are using the diversity curve of common water closet in order to determine the simultaneous flow rate of water supply piping, but there is a difference between a determined flow rate of general water closet and that of water closet for water saving. This study aims to find out the fixture unit of a flush valve type water closet for water saving in office building, and to determine the correlation between the fixture units and peak flow rates on the basis of the probability theory. A flush valve type water closet for water saving that have a 7.5 second duration of flush operation with an average design flow rate 72 $\ell$/fin was considered. Simulation results indicate that the number 5 is shown to be reasonable to the fixture unit of water closet for water saving. And the design can be undersized considerably with the revised diversity curves using modified fixture unit.

  • PDF

상·하수 배관재의 수 환경에서 부식진전도 연구 (Research of Corrosion Growth Degree According in Liquid Environment of Waterworks and Sewer Piping Material)

  • 박경동;기우태;유형주;김동욱
    • 한국기계가공학회지
    • /
    • 제5권4호
    • /
    • pp.33-40
    • /
    • 2006
  • The quality of the supply water which is supplied to consumer is not the thing of water after filtrating but the thing of water from faucet through pipe. As a result, heavy metals and microorganism, that is the major materials, which cause the distrust of the supply water is generated by supply process. Especially, the heavy metal is generated by the corrosion of waterworks. Besides, rupture by corrosion of pipe becomes the factor of supply water's pollution in waterworks and the factor of pollution of the soil and environment in drain pipe. Therefore, this research examined the weight reduction electric potential measure to measure the corrosion degree of piping materials after testing the corrosion of piping materials(Copper Pipe, Galvanized Steel Pipe, Stainless Steel Pipe) which is generally used at the moment in various corrosion environments(subterranean water, supply water, 3.5% NaCl, 3.5% $HNO_3$). And let me show basic design data about problem occurrence such as leakage water, rust water, inside and outside corrosion from this.

  • PDF

발전소 복수 공급 배관계의 고진동과 분기 배기배관의 절손 규명 (Examination on High Vibration and Branch Vent Pipe's Failure of Complex Piping System Suppling Condensate-Water in Power Site)

  • 김연환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2010년도 추계학술대회 논문집
    • /
    • pp.380-384
    • /
    • 2010
  • A disturbance flow at piping bands and discontinuous regions such as a valve, a header has a intense broadband internal pressure field and a sound field which are propagated through the piping system The fields becomes the source of a vibration of this piping system. Intense broadband disturbance flow at a discontinuous region such as elbows, valves or headers generates an acoustical pulsation. The pulsation becomes the source of structural vibration at the piping system. If it coincides with the natural frequency of the pipe system, excessive vibration results. High-level vibration due to the pressure pulsation affects the reliability of the plant piping system. This paper discusses the high vibration and the branch vent pipe's failure of condensate-water supply piping system due to the effect of acoustical pulsations by flow turbulence from the flow control valves of globe type in a power site.

  • PDF

초임계 보일러 재열기 급수 공급배관의 과도 음향진동 진단 및 회피설계 (Mechanism Diagnosis and Avoidance Design on Transient Acoustic Vibration of Reheater Water Supply Piping in Supercritical Boiler)

  • 김연환;배용채;김재원;이두영;허해용
    • 한국소음진동공학회논문집
    • /
    • 제23권5호
    • /
    • pp.385-393
    • /
    • 2013
  • In this paper, the mechanism identification and the avoidance measures on the phenomena of transient acoustic vibration amplified at the water-supply piping system to regulate the steam temperature of the boiler reheater in 500MW class supercritical power plant are presented. The pressure pulsation waves induced by the impeller passing of two feed-water pumps with five blades are coincident with the local acoustic modes of boiler reheater water-supply piping system. There are the phenomena amplified at the peaks of 5X, 10X, 15X and 20X in spectrums of piping vibration, sound pressure, and the feed-water's pressure pulsation waves. The shut-off device is installed in the piping system for the interception of pressure pulsation waves transmitted from two feed-water pumps and the modified design change of the piping layout is applied for the acoustic resonance avoidance. The acoustic natural frequencies are separated from the harmonics of pressure pulsation waves induced by the pump impellers passing through the design change of the span length. The acoustic vibration is gone by resonance avoidance measures. As a result, more than 20 dBA reduction is achieved from 100 dBA to 80 dBA.

급수 배관계의 음향진동 현상 고찰 및 대책 (Mechanism Investigation and Measures on Acoustic Vibration Phenomena of Water Supply Piping)

  • 김연환;배용채;이두영
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2012년도 추계학술대회 논문집
    • /
    • pp.470-475
    • /
    • 2012
  • The downstream piping system of the water supply system in a supercritical power plant is affected by the fluctuation pressure waves induced by accessing to the acoustic modes of the piping systems with the rotation and impeller passing pulsations of the feed water pump. There are the phenomena amplified at the same time in the range of 415 ~ 455Hz, 830 ~ 910Hz, 1245 ~ 1365Hz and 1660 ~ 1820Hz on the spectrums of the vibration, the sound pressure, and the pressure fluctuation waves.

  • PDF

아파트의 온수공급배관망해석 (Analysis on Heat Supply Piping Network for Apartment House)

  • 박윤철;황광일
    • 한국주거학회논문집
    • /
    • 제13권6호
    • /
    • pp.89-99
    • /
    • 2002
  • The purpose of this research is to analyze the characteristics of flow rate distribution in hot-water piping networks in the apartment building. A 14-story apartment house was selected as a sample building and analyzed numerically by Hardy-Cross method. Two different piping networks, one has three vertical zones and the other of a single zone with automatic balancing valves, were compared. Some of research results are as follows; As the temperature of supply hot-water increases, the flow rate of it does by buoyancy effect, but this effect is not found in the piping network with automatic balancing valves. Non-uniformity in hot-water flow distributions to all stories in the piping system of single vertical zone can be completely reformed by the installation of either manually operated or automatic balancing valves in every story.

수격파를 이용한 배관 세정기 개발 연구 (A Study on the Development of the Water Hammering Cleaner System for Pipeline)

  • 김홍식;김윤제;박광진
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2002년도 학술대회지
    • /
    • pp.675-678
    • /
    • 2002
  • In order to develop the water hammering cleaner system for removing scale and slime in inner metal or non-metal piping wall, the flow characteristics are investigated by numerical and experimental methods. The air bubbles in the piping systems as a shock wave are formed and transferred with the water flow in the piping. The governing equations are derived from making using of three-dimensional Wavier-Stokes equations with the standard $k-{\varepsilon}$ turbulence model and SIMPLE algorithm. Pressure distributions in the pipeline are calculated for different air supply pressures. Also, we prepared some experimental results of the pressure differences for various air supply times.

  • PDF

관망해석을 통한 주거용 건축물의 급수.급탕 헤더시스템 설계 방안에 관한 연구 (A Study on the Design Method of Cold & Hot Water Manifold System for Residential Buildings through the Piping Network Analysis)

  • 차민철;석호태;김동우
    • 한국주거학회논문집
    • /
    • 제19권5호
    • /
    • pp.111-120
    • /
    • 2008
  • The aim of this study is to present the design methods about manifold location being installed and size and to draw out the proper piping size as comparing the fluctuation of discharge with manifold size and residence size through the piping network analysis, when using the same faucet in accordance. The findings are summarized as follows, 1) an appropriate header main body pipe diameter was deemed to be $32{\sim}50\;mm$. 2) the research presented design measures for the application of appropriate water supply inlet pipe diameters according to residential buildings with various sizes. 3) the header direct branch piping method is ideal for small and medium-sized residential complexes, and the header branching and semi header methods are deemed to be more favorable for large residential complexes. 4) this study offered design measures for appropriate header system main body pipe diameters, water supply inlet pipe diameters, header system piping methods, application methods for functional auxiliary equipment units, and header system installation spaces and location.