• Title/Summary/Keyword: Water supply capacity

Search Result 367, Processing Time 0.027 seconds

Forecasting the Long-term Water Demand Using System Dynamics in Seoul (시스템 다이내믹스법을 이용한 서울특별시의 장기 물수요예측)

  • Kim, Shin-Geol;Pyon, Sin-Suk;Kim, Young-Sang;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.2
    • /
    • pp.187-196
    • /
    • 2006
  • Forecasting the long-term water demand is important in the plan of water supply system because the location and capacity of water facilities are decided according to it. To forecast the long-term water demand, the existing method based on lpcd and population has been usually used. But, these days the trend among the variation of water demand has been disappeared, so expressing other variation of it is needed to forecast correct water demand. To accomplish it, we introduced the System Dynamics method to consider total connections of water demand factor. Firstly, the factors connected with water demand were divided into three sectors(water demand, industry, and population sectors), and the connections of factors were set with multiple regression model. And it was compared to existing method. The results are as followings. The correlation efficients are 0.330 in existing model and 0.960 in SD model and MAE are 3.96% in existing model and 1.68% in SD model. So, it is proved that SD model is superior to the existing model. To forecast the long-term water demand, scenarios were made with variations of employment condition, economic condition and consumer price indexes and forecasted water demands in 2012. After all scenarios were performed, the results showed that it was not needed to increase the water supply ability in Seoul.

Improving the water yield capabilities using reservoir emergency storage and water supply adjustment standard (합천댐의 비상용량 및 용수공급 조정기준을 활용한 용수공급능력 제고)

  • Ahn, Jaehong;Lee, Youngmok;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.12
    • /
    • pp.1027-1034
    • /
    • 2016
  • One of the most important purpose of multi-purpose reservoir is storing a large amount of water for utilization in a dry season. However, multi-purpose reservoirs that were constructed according to the limited hydrologic information available at the time of construction may encounter problems such as decreased water inflow due to climate change and an inability to cope with a water shortage. To solve these problems, in 2015, the Ministry of Land, Infrastructure and Transport suggested a revised water supply standard in case of water shortage for reservoirs. However, the revised standard has not been sufficiently discussed to determine its effectiveness. In addition, multi-purpose reservoirs in South Korea have secured and stored water for emergencies, but there is currently no way to utilize the stored water. Determining how to utilize the stored water effectively may be a useful method for preparing drought. Therefore, this article discusses the revised water supply standard as it relates to a water shortage in reservoirs and a method of utilizing the water stored for emergencies in multi-purpose reservoirs. The options for utilizing the water storage were evaluated using a water shortage safety degree index, and the results showed that the options may slightly and limitedly increase the water supply capacity. However, the evaluation also showed that a complex application of two options may overcome the exisiting problem and to supply water more effectively.

Power Cable Insulation Diagnosis Using Low Frequency Power (저주파수 전원을 이용한 전력케이블 절연평가에 관한 연구)

  • Kim, Sung-Min;Lee, Sang-Hun;Jang, Jae-Yel
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1603-1603
    • /
    • 2011
  • As time goes by these cables make a insulation problems, and ask for a preventive diagnosis method. Cable has very high electrostatic capacity and insulation defects mainly caused by water-tree(WT). Dissipation factor test is very useful for detecting WT but it needs huge power supply. In this paper we presented a cable insulation diagnosis by dissipation factor using low frequency power supply.

  • PDF

Rainwater Harvesting Potential in a New Residential Area in North Bujumbura, Burundi

  • Kheria, Mfuranzima;Kang, Daeseok;Sung, Kijune
    • Journal of Environmental Science International
    • /
    • v.25 no.3
    • /
    • pp.447-456
    • /
    • 2016
  • Access to clean and affordable water is one of the fundamental human rights because water is essential to life and a foundation for socioeconomic development of any country in the world. Despite the efforts to secure water supply in Burundi, the amount of water supplied by public utilities does not meet the demand of the population because population keeps increasing with fluctuation of weather conditions. This study selected north Bujumbura that is a sprawling new residential area in the western part of Burundi as a case to investigate the potential of rainwater harvesting in meeting water demand of the country. Based on a long-term average monthly precipitation in the region, the rainwater harvesting potential was assessed as a function of roof sizes, number of households, and runoff coefficients of roof materials. For the entire region of north Bujumbura, the current water supply capacity of the local water company combined with the rainwater harvesting potential resulted in the water surplus of $468,604.1m^3/yr$. Although three communes among them still showed water deficit in dry season, they still got help from rainwater to relieve their water shortage. This suggests that at the regional scale, proper storages and water quality control for harvestable rainwater could contribute to relieving the regional water shortage and allow the population growth.

Development and application of integrated indicators for assessing the water resources performance of multi-purpose and water supply dams (댐 용수공급능력 안정성 평가를 위한 통합지표 개발 및 적용)

  • Sung, Jiyoung;Kang, Boosik;Kim, Bomi;Noh, Seongjin
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.687-700
    • /
    • 2022
  • For comprehensively assessment the water resources performance of multi-purpose dams and water supply dams in South Korea, a methodology was proposed to utilize the durational reliability along with the integrated auxiliary indicators including resiliency, dimensionless vulnerability, water resource efficiency, specific inflow, and specific water supply. In addition, for the purpose of sustainable dam operation in the future, a plan to grade the water resources performance was presented to periodically evaluate the performance and determine the priority of each dam's structural or non-structural planning according to the evaluation results. As major results, in the case of Sumjingang Dam, the durational reliability was 99.0%, but the integrated auxiliary index was the lowest of 44 points, which was 5th grade. This means that despite the current high reliability, hydrological changes due to future climate change or regional change of water demand-supply balance can have significant impacts on the water resources performances. In contrast, the Chungju Dam with a durational reliability of 93.0%, which is below the average among all multi-purpose dams, shows the 76 points of the integrated auxiliary index, which is 3rd highest following the Soyanggang Dam and the Namgang Dam. Nevertheless, due to the size of the basin, the specific inflow is sufficiently high as 185%, so the actual performance could be evaluated relatively high. The water supply dams designed for a single purpose tend to be evaluated relatively high because they have a high proportion of industrial and municipal water supply and have enough room for the supply capacity.

Assessment of Agricultural Water Supply Capacity Using MODSIM-DSS Coupled with SWAT (SWAT과 MODSIM-DSS 모형을 연계한 금강유역의 농업용수 공급능력 평가)

  • Ahn, So Ra;Park, Geun Ae;Kim, Seong Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.507-519
    • /
    • 2013
  • This study is to evaluate agricultural water supply capacity in Geum river basin (9,865 $km^2$), one of the 5 big river basin of South Korea using MODSIM-DSS (MODified SIMyld-Decision Support System) model. The model is a generalized river basin decision support system and network flow model developed at Colorado State University designed specifically to meet the growing demands and pressures on river basin management. The model was established by dividing the basin into 14 subbasins and the irrigation facilities viz. agricultural reservoirs, pumping stations, diversions, culverts and groundwater wells were grouped and networked within each subbasin and networked between subbasins including municipal and industrial water supplies. To prepare the inflows to agricultural reservoirs and multipurpose dams, the Soil and Water Assessment Tool (SWAT) was calibrated using 6 years (2005-2010) observed dam inflow and storage data. By MODSIM run for 8 years from 2004 to 2011, the agricultural water shortage had occurred during the drought years of 2006, 2008, and 2009. The agricultural water shortage could be calculated as 282 $10^6m^3$, 286 $10^6m^3$, and 329 $10^6m^3$ respectively.

A Study on Drainage Capability of Large Capacity Outlet and Spillway of Dams in Korea (한국댐의 대용량 배수시설 및 Spillway 배수능력에 관한 조사연구)

  • 이원환
    • Water for future
    • /
    • v.11 no.2
    • /
    • pp.43-53
    • /
    • 1978
  • Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.

  • PDF

Reevaluation of Multi-Purpose Reservoir Yield (다목적댐의 용수공급능력 재평가)

  • Lee, Dong-Hoon;Choi, Chang-Won;Yu, Myung-Su;Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.4
    • /
    • pp.361-371
    • /
    • 2012
  • For a basin with existing reservoirs, the necessity of additional water demands has been proposed, as well as a reevaluation of existing reservoir yield has been proposed. The objective of this study is to reevaluate a multipurpose reservoir yield and to assess the possibility of additional water supply according to increase of downstream water demands. Andong and Imha Reservoirs are selected for reevaluation. The standard reservoir operation rule model and the HEC-ResSim model were used for reservoir simulation for 30 years (1979~2008). In this study, water supply reliability was set up as 96.7% and 95.0% with yearly and monthly evaluating unit. In case of 95% water supply reliability with yearly evaluating unit, water supply capability of Andong reservoir was evaluated as 893MCM and water supply capability of Imha reservoir was evaluated as 382MCM, and that results showed that water yields for both reservoirs are less than the original designed yields.

Evaluation of water supply capacity using groundwater abstraction contributing to streamflow (하천유량에 기여하는 지하수 양수량의 물공급 능력 평가)

  • Chung, Il-Moon;Kim, Nam Won;Lee, Jeongwoo;Chang, Sun Woo
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.12
    • /
    • pp.889-896
    • /
    • 2017
  • In the present study, an integrated SWAT-MODFLOW model was implemented to analyze the method of supplying groundwater abstraction contributing to Musimcheon stream. Various simulations of supply of groundwater to streamflow with current and maximum groundwater abstraction have been explored for 5 years (2011-2015). In 2015, when the severe drought happened, the monthly discharge change rate due to groundwater supply was ranged from 23% in current abstraction to 68% in maximum abstraction. In terms of annual groundwater recharge, these quantities could be applicable recharges ranged from 75 mm (6.2% of annual mean precipitation) to 290 mm (24% of annual mean precipitation) which could be stable annual supply. Since surface water is vulnerable to drought, the water supply using groundwater could be an effective alternative for stream deficiency.