• 제목/요약/키워드: Water shortage

검색결과 427건 처리시간 0.033초

마닐라 광역시 물공급 이슈(Issues) 진단 (The Assessment of Water Supply Issues in Metro Manila)

  • ;김이형;정상만
    • 한국습지학회지
    • /
    • 제10권3호
    • /
    • pp.37-45
    • /
    • 2008
  • The Philippine government enacted the National Water Crisis Act in 1995, as a response to the burgeoning situation of water supply systems in the country. This act led to the privatization of Metropolitan Waterworks and Sewerage System (MWSS), sector having jurisdiction and control over all waterworks and sewerage systems in a service area including Metro Manila. Nowadays, the region's supply of water is still facing a lot of difficulties, both in quality and quantity. The unabated migration of people to the metro which increases its population, tapping from the aged pipelines, lack of water facilities and infrastructure, excessive groundwater withdrawal, environmental degradation, and surface and groundwater pollution are some of the issues that Metro Manila have to deal with. These situations lead to two primary water supply issues suffered by Metro Manila: water shortage and flooding. The purpose of this paper was to present water supply in Metro Manila with respect to the problems in its distribution, environmental implications and quality. In this paper, several technical reports, published literature, and news articles were consulted and became the major basis for identifying gaps and suggesting remedial measures.

  • PDF

생활 및 공업용수 물이용 패턴을 고려한 물수급 전망 비교 및 고찰 (Evaluation and comparison of water balance and budget forecasts considering the domestic and industrial water usage pattern)

  • 오지환;임동진;김인규;신정범;류지성
    • 한국수자원학회논문집
    • /
    • 제55권11호
    • /
    • pp.941-953
    • /
    • 2022
  • 본 연구에서는 한강 권역의 포함된 65개 지자체를 대상으로 5년간 월별 물이용량 자료를 수집, 분석하여 월 단위의 대표적인 생공용수 물이용 패턴을 도출하고, 물수급 네트워크 모델(MODSIM)과 기초자료를 이용하여 물이용 패턴을 반영함에 따른 유역 내 발생 가능한 물부족량의 차이를 비교하였다. 분석 결과, 특정 시기별 물이용 주기성을 파악하고, 월별 일정 비율 대비-3.120%~+4.322%의 증감 폭이 나타남을 확인하였다. 이를 물수급 모델에 적용할 경우, 28개 중권역 중 17개 유역에서 물부족량의 변화가 나타났고, 연간 동일한 수요량임에도 불구하고, 시기별 수요량의 비율을 적용함에 따라 최대 생공용수 부족량은 기존대비 약 8.0% 수준으로 감소할 것으로 분석되었다. 장래 기후변화, 사회적, 지역적 특성이 반영된 물이용 패턴에 대한 예측 연구와 연계한다면, 더욱 현실감 있는 물수급 전망과 신뢰도 높은 국가수자원계획 수립이 가능할 것이라고 판단된다.

AHP를 이용한 강변여과 적지 분석 (Site Suitability Analysis for Bank Filtration Using AHP)

  • 김병찬;이승철;류지협
    • 한국재난관리표준학회지
    • /
    • 제1권2호
    • /
    • pp.53-59
    • /
    • 2008
  • 전 세계적으로 물부족 사태는 매우 심각한 상황에 이르렀다. 우리나라도 예외는 아니어서 용수부족이 예상된다. 지하수는 이러한 문제를 일부 지역에서 해결해 주는 역할을 할 수 있으며, 특히 강변여과는 위치와 규모의 제약에도 불구하고 저수지들이 지니고 있는 문제점들을 극복할 수 있다고 알려져 있다. 강변여과 적지분석을 위해 댐건설 지연과 물부족을 겪고 있는 네 지역을 선정하여, 갈등을 해결하고 대안의 우선순위를 결정하는 분석도구인 계층분석과정 (AHP)을 적용하였다. 또한 AHP를 이용한 분석결과를 기존 연구와 비교하였다. 개발된 강변여과 적지분석 방법론은 합리적 의사결정을 위한 판단근거를 제공할 것으로 사료된다.

  • PDF

계층분석과정을 이용한 지하댐 적지분석 (Site Suitability Analysis for Underground Dam Using Analytic Hierarchy Process)

  • 이상일;김병찬
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제8권4호
    • /
    • pp.36-44
    • /
    • 2003
  • 전 세계적으로 물부족 사태는 매우 심각한 상황에 이르렀다. 우리나라도 예외는 아니어서 2011년에는 약 18억 $\textrm{m}^3$, 2020년에는 약 26억 $\textrm{m}^3$의 용수부족이 예상된다 지하수는 이러한 문제를 일부 지역에서 해결해 주는 역할을 할 수 있으며, 특히 지하댐은 위치와 규모의 제약에도 불구하고 지상댐이 지니고 있는 문제점들을 극복할 수 있다고 알려져 있다. 지하댐 적지분석을 위해 댐건설 지연과 물부족을 겪고 있는 네 지역을 선정하여, 갈등을 해결하고 대안의 우선순위를 결정하는 분석도구인 계층분석과정(AHP)을 작용하였다. 또한 AHP를 이용한 분석결과를 기존 연구와 비교하였다. 개발된 지하댐 적지분석 방법론은 중앙정부나 지방자치단체에게 합리적 의사결정을 위한 판단근거를 제공할 것으로 사료된다.

Dilemma of a small dam with large basin area under climate change condition

  • Jeong-Hyeok Ma;Chulsang Yoo;Tae-Sup Yun;Dongwhi Jung
    • Computers and Concrete
    • /
    • 제33권5호
    • /
    • pp.559-572
    • /
    • 2024
  • Problems of under-sized dams (small dams with large basin area) could get worse under the global warming condition. This study evaluates the possible change of these problems with the Namgang Dam, an under-sized dam in Korea. For this purpose, first, this study simulates the dam inflow data using a rainfall-runoff model, which are then used as input for the reservoir operation. As a result, daily dam storage, dam release, and dam water supply are derived and compared for both past observed period (1973~2022) and future simulated period (2006~2099) based on the global warming scenarios. Summarizing the results are as follows. First, the inflow rate in the future is expected to be increased significantly. The maximum inflow could be twice of that observed in the past. As a result, it is also expected that the frequency of the water level reaching the high level is increasing. Also, the amount and frequency of dam release are to be increased in the future period. More seriously, this increase is expected to be concentrated on rather extreme cases with large dam release volume. Simply, the condition for flood protection in the downstream of the Namgang Dam is becoming worse and worse. Ironically, the severity of water shortage problem is also expected to become much worse. As the most extreme case, the frequency of no water supply was zero in the observed period, but in the future period, it becomes once every five years. Both the maximum consecutive shortage days and the total shortage volume are expected to become more than twice in the future period. To prevent or mitigate this coming problem of an under-sized dam, the only countermeasure at this moment seems to be its redevelopment. Simply a bigger dam with larger dam reservoir can handle this adverse effect more easily.

물 부족 문제의 해결을 위한 건축물 단위의 물재이용 시설 확대 방안 (Expansion of Water Reuse Facility for Building Unit to Solve Water Shortage Problem)

  • 박용화;심인태;김현진;장암
    • 대한환경공학회지
    • /
    • 제39권7호
    • /
    • pp.377-384
    • /
    • 2017
  • 본 연구는 환경부 시범사업으로 진행된 수원시 물 재이용(중수도)시설물 설치사업으로 설치된 물재이용시설을 통하여 건축물 단위의 물재이용을 통한 물 부족 문제 해결 가능성을 살펴보았다. 개별 건축물 단위의 물재이용이 이루어지며 도시의 물 수요를 최대 25%까지 줄일 수 있다. 이는 우리나라의 수자원 부족 문제를 해결할 수 있는 수준이다. 하지만 개별 건축물 단위의 물 재이용 시설을 활성화하려면 사용자의 중수도 거부감 해소와 경제성 문제를 해결하여야 한다. 중수도 거부감 해소는 MBR 공정과 AOP 공정을 연계 하였을 경우 해결 가능하다. MBR 공정과 AOP 공정을 연계하여 운영할 시 사용자들은 상수도와 중수도의 수질 차이를 느끼지 못하는 것으로 나타났다. 경제성 문제는 건설비와 운영비를 고려할 경우 시설용량 100톤/일 이상, 운영비만 고려할 경우 15톤/일 이상일 경우 상 하수도요금 수준에서 해결이 가능하다. 더 나아가 사회적 편익비용까지 고려할 시 150톤/일 이상부터는 수익이 창출되는 것으로 나타났다.

농업개수로 유량측정 현황 및 적정 방안 고찰 (Study on Discharge Metering Methods in Agricultural Open Canal)

  • 김진택;박지환;구본충
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.56-60
    • /
    • 2005
  • It is necessary to irrigate for agriculture in Korea and agricultural canals play important roles in irrigation. Nowadays gauging water discharge in canals is important because of water shortage in Korea. But It is rare to gauging water discharge in canals. Several water level gauges are installed in agricultural canals through TM/TC. But the abilities of the gauges are insufficient for agricultural water metering. In this situation, we are developing the water discharge metering system which is inexpensive and easy to maintain.

  • PDF

가뭄시 가정용수에 대한 소비자 지불의사 (Willingness to Pay for Residential Water on Drought Conditions)

  • 박두호;박윤신
    • 한국수자원학회논문집
    • /
    • 제40권11호
    • /
    • pp.861-867
    • /
    • 2007
  • 본 연구는 가뭄시 제한급수를 할 경우 이에 대한 소비자의 지불의사를 추정코자 하였다. 7대 특 광역시와 32개 가뭄상습지역에 거주하는 일반인을 대상으로 가정용수 수요패턴과 가뭄을 고려한 가정용수의 가치를 추정하였다. 조사결과 상대적으로 부유한 특 광역시 주민들은 수돗물의 수량보다는 수질을 더 중요하게 생각하였고 상습가뭄지역의 주민들은 수질도 중요하지만 수량의 중요성을 강조하고 있다. 지불의사 추정을 위한 설문은 양분선택형과 개방형을 혼합하였고, 모형은 Tobit모형을 이용하였다. 예상대로 교육수준이 높을수록, 가구수가 많을수록, 소득이 높을수록 지불의사가 높은 것으로 나타났다. 가뭄으로 인해 가정용수의 25% 제한시 일인당 WTP가 약 2,010원으로 추정되었다. 그러나 예상과는 반대로, 50% 제한시에는 25% 경우 보다 조금밖에 증가하지 않았다. 이는 소비자들의 조세저항 때문이기도 하고 실제 그 같은 가뭄을 경험하지 못했기 때문일 것이다. 그럼에도 불구하고 실제 가뭄상황에 대한 소비자들의 WTP는 본 연구보다 훨씬 높을 것으로 판단된다. 중앙정부 및 지방정부들은 가까운 미래에 찾아올지도 모르는 가뭄으로 인한 물부족에 대비하여 보다 효율적인 물공급 및 분배체계를 갖추어야 할 것이며 소비자들 역시 생활용수의 확보를 위해 현재의 물 값 이상의 비용을 지불할 의사가 있음을 제시하고 있다. 따라서 정부는 상수도의 급수체계조정 및 비상시 대체수자원을 확보할 수 있는 대안을 시급히 강구해야 한다.

가중치산정을 통한 다목적댐 용수의 배분 방안 (Allocation of Water Supplied by Multi-Purpose Dam Using the Estimate of Weighting Factors)

  • 이충성;최승안;심명필;정관수
    • 한국수자원학회논문집
    • /
    • 제37권8호
    • /
    • pp.663-674
    • /
    • 2004
  • 본 연구는 합리적 용수배분의 기본원칙으로 효율성, 형평성과 지속가능성을 설정하고, 용도별 용수의 상대적 중요도를 나타내는 용도가중치와 각 수요처의 지역적 특성을 대표하는 지역가중치를 산정 하였다. 용도가중치는 계층화분석과정(AHP, Analytic Hierarchy Process)기법을 사용하였으며, 지역가중치는 사회ㆍ경제적 통계치를 반영한 지역특성가중치와 지역규모가중치를 조합하여 산정 하였다. 이러한 가중치를 적용하여 댐을 중심으로 한 용수배분 방안을 수립하고 이를 가상 물부족 상황에서 부산, 대구, 고령군 일부를 수요처로 하는 안동댐에 적용하였다. 우선순위 (priority)에 의한 용수배분이 최하순위의 용도나 지역에서 모든 물 부족을 부담하는데 반하여 상대적 가중치에 의한 용수배분은 모든 용도와 지역에 물부족량이 분산되므로 보다 합리적인 것으로 판단된다.

수도사업의 국민경제적 역할분석 (The Role of Water Utility Industry to the National Economy)

  • 김태유;유승훈;허은녕
    • 한국수자원학회논문집
    • /
    • 제30권4호
    • /
    • pp.367-377
    • /
    • 1997
  • 수량과 수질 양면에서의 '물위기'를 극복하 수 있는 공공정책 개발을 위해 두 가지 접근방법으로 수도사업의 국민경제적 역할을 고찰하고자 했다. 먼저 급속한 산업화와 도시화로 인해 물소비가 급증한 시기인 1978-1994년 동안의 물소비와 경제성장간의 관계를 살펴보았다. 물의 총수요와 부문별 수요의 가격 및 소득탄력성을 분석하였다. 둘째, 단기적으로 수자원 문제를 분석할 수 있는 투입-산출(I-O, input-output)모형을 개발하였다. 통상적인 I-O 모형을 고찰한 뿐만 아니라 그 응용으로서 i) 공급유도 투입-산출모형을 이용한 부문별 공급지장비용 평가와, ii) 레온디에프 가격모형을 이용한 수도요금 상승으로 인한 부문별 물가파급효과분석을 다루었다. 결론적으로 가장 주목할 만한 정책적 시사점은 수도부문에 대한 트자와 물공급장애가 생활수준과 산업생산에 큰 영향을 미치지만, 절수를 고무하고 투자재원을 확보할 목적의 수도요금 인상은 물수요를 유의하게 감소시키지만 전반적 물가수준에 별다른 영향을 미치지 않는 것으로 나타났다.

  • PDF