1 |
Friedler, E. and Hadari, M., "Economic feasibility of on-site greywater reuse in multi-storey buildings," Desalination, 190, 221-234(2006).
DOI
|
2 |
Lesjean, B. and Gnirss, R., "Grey water treatment with a membrane bioreactor operated at low SRT and low HRT," Desalination, 199(1-3), 432-434(2006).
DOI
|
3 |
Sumikura, M. and Hidaka, M., "Ozone micro-bubble disinfection method for wastewater reuse system," Water Sci. and Technol., 56(5), 53-61(2007).
DOI
|
4 |
Nolde, E., "Greywater reuse systems for toilet flushing in multi-storey buildings - over ten years experience in Berlin," Urban Water, 1, 275-284(1999).
|
5 |
Lazarova, V., Hills, S. and Birks, R., "Using recycled water for non-potable, urban uses: a review with particular reference to toilet flushing," Water Sci. Technol. Water Supply, 3(4), 69-77(2003).
DOI
|
6 |
Park, H. J., Kim, T. I. and Han, M. Y., "Determinant Factor Analysis for the Spread of Water Reuse," Korean Soc. Environ. Eng., 36(4), 271-276(2014).
DOI
|
7 |
Hernandez, L., Zeeman, G., Temmink, H. and Buisman, C., "Characterization and biological treatment of greywater," Water Sci. Technol., 56(5), 193-200(2007).
DOI
|
8 |
Knerr, H., Engelhart, H. J., and Sagawe, G., "Separated grey- and blackwater treatment by the KOMPLETT water recycling system-. a possibility to close domestic water cycle. Proceeding of Sanitation Challenge: New Sanitation Concepts and Models of Governance," Wageningen, 2008, 260-269(2008).
|
9 |
Fangyue, L. and Knut, W., "Review of the technological approaches for grey water treatment and reuses," Sci. Total Environ., 407, 3439-3449(2009).
DOI
|
10 |
Ministry of Environment, "Water reuse master plan," (2011).
|
11 |
Shim, I.-T. and Han, M. Y., "Design and operation of the rainwater-Greywater Hybrid System : SNU No. 39 Building," Korean Soc. Environ. Eng., 38(12), 676-682(2016).
DOI
|
12 |
Lee, B. H. and Kim, S. H., "Advanced Secondary Wastewater Treatment Using the DOF (dissolved Ozone Flotation) System," Korean Soc. Water and Wastewater, 19(6), 767-774(2005).
|
13 |
Suwon-si, "Establishment of water reclamation facilities (greywater) 1st pilot project report,"(2015).
|
14 |
Suwon-si, "Establishment of water reclamation facilities (greywater) 2nd pilot project report,"(2016).
|