• Title/Summary/Keyword: Water pipe supply

Search Result 265, Processing Time 0.023 seconds

Experimental Analysis of Nodal Head-outflow Relationship Using a Model Water Supply Network for Pressure Driven Analysis of Water Distribution System (상수관망 압력기반 수리해석을 위한 모의 실험시설 기반 절점의 압력-유량 관계 분석)

  • Chang, Dongeil;Kang, Kihoon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.6
    • /
    • pp.421-428
    • /
    • 2014
  • For the analysis of water supply network, demand-driven and pressure-driven analysis methods have been proposed. Of the two methods, demand-driven analysis (DDA) can only be used in a normal operation condition to evaluate hydraulic status of a pipe network. Under abnormal conditions, i.e., unexpected pipe destruction, or abnormal low pressure conditions, pressure-driven analysis (PDA) method should be used to estimate the suppliable flowrate at each node in a network. In order to carry out the pressure-driven analysis, head-outflow relationship (HOR), which estimates flowrate at a certain pressure at each node, should be first determined. Most previous studies empirically suggested that each node possesses its own characteristic head-outflow relationship, which, therefore, requires verification by using actual field data for proper application in PDA modeling. In this study, a model pipe network was constructed, and various operation scenarios of normal and abnormal conditions, which cannot be realized in real pipe networks, were established. Using the model network, data on pressure and flowrate at each node were obtained at each operation condition. Using the data obtained, previously proposed HOR equations were evaluated. In addition, head-outflow relationship at each node was analyzed especially under multiple pipe destruction events. By analyzing the experimental data obtained from the model network, it was found that flowrate reduction corresponding to a certain pressure drop (by pipe destruction at one or multiple points on the network) followed intrinsic head-outflow relationship of each node. By comparing the experimentally obtained head-outflow relationship with various HOR equations proposed by previous studies, the one proposed by Wagner et al. showed the best agreement with the exponential parameter, m of 3.0.

Optimal Design of Water Supply System using Multi-objective Harmony Search Algorithm (Multi-objective Harmony Search 알고리즘을 이용한 상수도 관망 다목적 최적설계)

  • Choi, Young-Hwan;Lee, Ho-Min;Yoo, Do-Guen;Kim, Joong-Hoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.293-303
    • /
    • 2015
  • Optimal design of the water supply pipe network aims to minimize construction cost while satisfying the required hydraulic constraints such as the minimum and maximum pressures, and velocity. Since considering one single design factor (i.e., cost) is very vulnerable for including future conditions and cannot satisfy operator's needs, various design factors should be considered. Hence, this study presents three kinds of design factors (i.e., minimizing construction cost, maximizing reliability, and surplus head) to perform multi-objective optimization design. Harmony Search (HS) Algorithm is used as an optimization technique. As well-known benchmark networks, Hanoi network and Gyeonggi-do P city real world network are used to verify the applicability of the proposed model. In addition, the proposed multi-objective model is also applied to a real water distribution networks and the optimization results were statistically analyzed. The results of the optimal design for the benchmark and real networks indicated much better performance compared to those of existing designs and the other approach (i.e., Genetic Algorithm) in terms of cost and reliability, cost, and surplus head. As a result, this study is expected to contribute for the efficient design of water distribution networks.

Occurrence and Distribution of Disinfection of By-Products in Drinking Water (수돗물중 소독부산물(DBPs)의 생성 및 분포특성에 관한 연구)

  • In, C.K.;Lee, J.H.;Lee, I.S.;Bang, E.O.;Song, H.S.;Yoon, S.J.
    • Proceedings of the Korean Environmental Health Society Conference
    • /
    • 2005.06a
    • /
    • pp.263-272
    • /
    • 2005
  • Chlorine disinfection has been used in drinking water supply to disinfect the water-borne microbial disease which may cause to serious human disease. it is still the least costly, relatively easy to use, Chlorination is the primary means to disinfect portable water supplies and control bacterial growth in the distribution system. However, chlorine reacts with natural organic matter(NOM), that presents in nearly all water sources, and then produces disinfection by-products(DBPs), that have adverse health effects. Although the existent DBPs have been reported in drinking water supplies, it is not feasible to predict the levels of the various DBPs due to the complex chemistry reaction involved. 1. The objectives of this study is to investigate seasonal variation difference concentration of DBPs in the plant to tap water. The average concentration of THMs was 20.04 ${\mu}g/{\ell}$ , HAAs 8-15 ${\mu}g/{\ell}$ , HANs 2-4.5 ${\mu}g/{\ell}$ respectively. 2. Distant variation of DBPs furmation by the distance is that THMs concentration increased by 17% at 2km point from the plant and by 28% at 7km and HAAs, HANs also increase each by 16%, 32% at 2 km from the plant and 35%, 56% at 7 km. DBPs increase in water supply pipe continually, 3. The seasonal occurrence of BBPs is that in May and August DBPs concentration is very higher than in march, in May DBPs concentration is highest. The temperature is main factor of DBPs formation, precursor also. 4. Precursor which was accumulated for winter flowed into the raw water by flooding in spring and summer and produced DBPs. 5. Therefore for the supply of secure drinking water, it is required to protect precursor of flowing into raw water and to add to BCAA and DBAA to drinking water standards.

  • PDF

An Experimental Study on the Noise Reduction for Toilet Stool Plumbings in Apartment Bathroom (공동주택 욕실의 변기 배수소음 저감에 관한 실험적 연구)

  • Baek, Eun-Sun
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.57-62
    • /
    • 2007
  • Recently Among indoor noises plumbing noise from supply and drain water pipe is being pointed out as a annoying noise following to floor impact noise, and it is increasing the rate to point the noise due to the following several reasons: water pressure, vibration by fabricated structures and direct noise propagation from upper floor through ceiling This study aims to analyse the characteristics of toilet stool plumbing noise in apartment bathroom which are generated by crossing plumbings and elbows. And it analyse the effect of noise reduction by soundproofing and insulations which are covered at crossing plumbings. And also analyse the characteristics of noise about a type of elbows, crossing plumbing and result of dB(A). At last it provide a fundamental data for the purpose of reduction of plumbing noise in apartment.

Failure Analysis of Welded Pipe in Water Supplies for Apartment

  • Lee, Jong Kwon;Hong, Kyung Tae;Hwang, Woon Seok;Koh, Yong Tae;Park, Yong Soo
    • Corrosion Science and Technology
    • /
    • v.3 no.2
    • /
    • pp.67-71
    • /
    • 2004
  • Galvanized Steel pipes have been widely used in industries and apartments, Unexpected early leakage has been found in an apartment. Tunneling corrosion or penetration was found in the water supply pipes. The chemical compositions of the pipes and properties of coating layer were evaluated. The pipes met the specification of KS D 3507. The cause of early failure was analyzed through the examination of macrostructures and microstructures, It was found that the pipes were failed by grooving corrosion, which resulted from galvanic corrosion of weld bead and matrix.

Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case - (관류보일러 물-증기 계통의 동적 시뮬레이션 - 아임계 동력보일러 사례 -)

  • Kim, Seongil;Choi, Sangmin
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.41 no.5
    • /
    • pp.353-363
    • /
    • 2017
  • The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

A Study on the Economic Repair Pattern of the Building Components in the Apartment Housing (공동주택 구성재의 경제적 수선형태 설정 연구)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.17 no.5
    • /
    • pp.87-95
    • /
    • 2006
  • Building components have been deteriorated by various factors such as location, a building type, a surrounding environment and so on. In addition, each component has a peculiar characteristics, compared with other components in properties of matter an used part. Building components would be required to maintain its function and performance to provide the resident with a decent living condition. It is important to decide the repair time, scope and a required cost in repair plan, considering the each component's characteristics. In this parer, it aimed at providing the economic repair pattern to analyze the relation of the time-elapse and the cumulative repair cost in the apartment housing using 3rd quadratic function. Results of the study are as follows: First, the shape of the function for the economic repair is classified into two type. One is the continuous increase type of the cumulative cost which properly means the iterative repair type after built. The other is that the function has the maximum state at a point which means one-repair after its repair would be delayed to a scheduled time. Second, the iterative repair pattern would include window, roof proof, lighting and water supply pipe. The other repair pattern would include the paintings, heating pipe and sign board.

A study on the simulation method for the flushing flowrate and velocity in the watermain using a hydrant and a drain valve (소화전과 이토변을 이용한 플러싱 적용 시 관 내 세척유량과 유속 모의 방안에 관한 연구)

  • Gim, ARin;Lee, Eunhwan;Lee, SongI;Kim, kwang hyun;Jun, Hwandon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.spc1
    • /
    • pp.1251-1260
    • /
    • 2022
  • Recently, due to the deterioration of watermains and the detachment of scale which is accumulated on the watermain surface, water quality accidents in a water supply network occur frequently. As scale accumulated on watermains is stabilized, it may not cause water quality accidents under the normal operating condition. However, due to water hammer or transient flow caused by the abrupt velocity and/or direction of flow change, it can be detached from the watermain surface resulting in water quality accidents. To prevent these kinds of water quality accidents, it is required to remove scale by watermain cleaning regularly. Many researches about flushing which is the most popular water cleaning method are focused on the desirable velocity criteria and the cleaning condition to accomplish the effect of flushing whereas less amount of research effort is given to develop a method to consider whether the desirable velocity for flushing can be obtained before flushing is performed. During flushing, the major and minor headloss is occurred when flushing water flows through a hydrant or drain valve. These headloss may slow down the velocity of flushing water so that it can reduce the flushing effect. Thus, in this study, we suggest a method to simulate the flow velocity of flushing water using "MinorLoss Coefficient" and "Emitter Coefficient" in EPANET. The suggested method is applied to a sample network and the water supply network of "A" city in Korea to compare the flushing effect between "flushing through a hydrant" and "flushing through a drain valve". In case of "flushing through a hydrant", if the hydraulic condition ocurring from a watermain pipe connecting to the inlet pipe of a hydrant to the outlet of a hydrant is not considered, the actual flowrate and velocity of a flow is less than the simulated flowrate and velocity of a flow. In case of "flushing through a drain valve", the flushing velocity and flowrate can be easily simulated and the difference between the simulated and the actual velocity and flowrate is not significant. Also, "flushing through a drain valve" is very effective to flushing a long-length pipe section because of its efficiency to obtain the flushing velocity. However, the number and location of a drain valve is limited compared to a hydrant so that "flushing through a drain valve" has a limited application in the field. For this reason, the engineer should consider various field conditions to come up with a proper flushing plan.

Failure Analysis of Air Vent Connected with Heat Supply Pipeline Under Manhole (맨홀에 설치된 지역난방 열공급관 에어벤트의 전단부 파손 원인 규명)

  • Cho, Jeongmin;Chae, Hobyung;Kim, Heesan;Kim, Jung-Gu;Kim, Woo Cheol;Jeong, Joon Cheol;Lee, Soo Yeol
    • Corrosion Science and Technology
    • /
    • v.19 no.4
    • /
    • pp.196-202
    • /
    • 2020
  • The air vent connected to a heat supply pipeline in the district heating system has been used to eliminate the existing air in the pipe, which has a detrimental effect on corrosion durability and heat efficiency. Recently, the air vent installed under a manhole for 22 years was corroded and several pinholes were detected in the front-end of the air vent. To identify the cause of the failure, thickness reduction, corrosion products, and water quality were examined. The corrosion damage was significant at the outside of the front-end of the air vent where the insulator was covered. While a thin oxide layer was formed in the interior of the tube, the coarse and porous corrosion products consisting of magnetite and hematite were found externally. Water flowing into the thermal insulator was absorbed by the insulator following hydrolysis. The hydrolyzed insulator ejected the corrosion factors such as Cl-, SO42-, and NH4+. The findings suggest that the corrosion under insulation due to rain water is the main cause of the underlying failure in the air vent.

Evaluation of water drainage according to hydraulic properties of filling material of sand dam in Mullori, Chuncheon (춘천 물로리 지역 샌드댐 채움재 수리특성에 따른 배수량 평가)

  • Chung, Il-Moon;Lee, Jeongwoo;Kim, Min-Gyu;Kim, Il-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.11
    • /
    • pp.923-929
    • /
    • 2022
  • The Chuncheon Mullori area is an underprivileged area of water welfare where local water supply is not supplied, and it is supplying water to the villages with small water supply facilities using lateral flow and groundwater as water sources. This is an area with poor water supply conditions, such as relying on water trucks due to water shortages during the recent severe drought. Therefore, in order to solve the problem of water shortage during drought and to prepare for the increasing water demand, a sand dam was installed along the valley, and this facility has been operating since May 2022. In this study, repeated simulations were performed according to the hydraulic conductivity of the filler material and the storage coefficient value for the inflow condition for about two years from mid-March 2020 to mid-March 2022. For each case, the amount of discharge through the perforated drain pipe was calculated. Overall, as the hydraulic conductivity increased, the amount of discharge and its ratio increased. However, when the hydraulic conductivity of the second floor was relatively low, the amount of discharge increased and then decreased as the hydraulic conductivity of the third floor increased. This is considered to be due to the fact that the water level was kept low due to the rapid drainage compared to the net inflow into the third floor because the water permeability of the third floor and the drainage coefficient of the drain pipe were large. As a result of simulating the flow of the open channel in the upper part of the sand dam as a hypothetical groundwater layer with very high hydraulic conductivity, the decrease in discharge rate was slower than the increase in the hydraulic conductivity of the hypothetical layer, but it was clearly shown that the discharge volume decreased relatively as the hydraulic conductivity of the virtual layer increased.