• 제목/요약/키워드: Water pipe supply

검색결과 265건 처리시간 0.022초

비상시 용수공급을 위한 상수도 연계관로의 수리적 적정성 평가 (Hydraulic Adequacy of Connection Pipes in Water Supply Systems for Contingencies)

  • 한완섭;정관수;김주환
    • 상하수도학회지
    • /
    • 제27권6호
    • /
    • pp.679-687
    • /
    • 2013
  • Although stable and safe drinking water supply to the customers is a basic function of multi-regional water supply systems in Korea, most systems have their vulnerabilities in emergency time due to the branch-type. Application of connections from the other water supply system can provide a solutions for these tentative problems. This paper describes reduction planning of water supply accidents that can minimize a service interruption to customers in multi-regional water supply system by connecting pipe lines between local water supply systems in Mokpo city areas. The result of this study shows that Juam dam multi-regional water supply systems can cover all of the water shortage in southern parts of Jeonnam multi-regional water supply systems by transmitting water through connected pipes between local networks. This can be effective to supply water interactively in various contingencies, when a pipe line accident occurs in southern area of Jeonnam multi-regional water supply systems. On the contrary, southern area of Jeonnam multi-regional water supply systems can cover 99.5 %($62,500m^3/day$) of the water shortage of Juam dam multi-regional water supply systems when service interruptions caused by various pipe accidents occur in the system.

상수도 배관의 갱생 공정을 위한 배관 건설 로봇 개발 (Development of the Pipe Construction Robot for Rehabilitation Work Process of the Water Pipe Lines)

  • 정명수;이재열;홍성호;장민우;신동호;함제훈;서갑호;서진호
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.223-231
    • /
    • 2021
  • In this paper describes the research and development of a pipe robot for pipe rehabilitation construction of old water pipes. After the water supply pipe construction, the pipe is leaking, damaged, and aging due to corrosion. Eventually, resistance to the flow of water in lower supply efficiency and contaminated water such as rusty water, finally in various consumer complaints. In order to solve this problem, rehabilitation construction robot technology is required to secure the construction quality of pipe rehabilitation construction and restore the function of the initial construction period. The developed pipe rehabilitation construction robot required a hydraulic actuator for high traction and was equipped with a small hydraulic supply device. In addition, we have developed a hydraulic cylinder and a link system that supports the pipe inner diameter to develop a single pipe robot corresponding to 500 to 800mm pipe diameter. The analysis and experimental verification of the driving performance and unit function of the developed pipe reconstruction robot are explained, and the result of the integrated performance test of the pipe reconstruction robot at the water supply pipe network site is explained.

공동주택의 노후 급수관 개선방안에 관한 연구 : 부천시 공동주택을 중심으로 (The Replacement Plans for Aged Public Water Supply Pipes in Apartment Buildings : Especially Apartment Buildings in Bucheon)

  • 이용화;허용철
    • 설비공학논문집
    • /
    • 제27권4호
    • /
    • pp.228-232
    • /
    • 2015
  • The water supply galvanized steel pipes of apartment buildings in Bucheon city constructed with building permission before 1994 have many problems such as leaks, the water containing rust, and low water pressure due to corrosion. Therefore, this study aims to find a way to renew the water supply pipes under investigation through a survey. As a result, when replacing the galvanized steel pipe with the corrosion-resistant pipe, the water supply system should also be changed from the gravity tank system to the booster pump system and the hygienic water storage tank. It is necessary to redraft the long-term repair plan including the replacement of the water supply system. Also, it is necessary to save the allowance reserve according to the modified long-term repair plan.

외벽측 급수관의 동결 과정에 관한 연구 (The Freezing Process of the Water Supply Pipe in an Exterior Wall)

  • 강한기;이재헌
    • 설비공학논문집
    • /
    • 제19권11호
    • /
    • pp.782-788
    • /
    • 2007
  • In this paper, the freezing process of the water supply pipe in the exterior wall of an apartment house was analyzed by numerical method. The thickness of the pipe insulation and the percentage of insulation damage were considered as parameters in this paper. In the cases of the 0%, 8% and 20% damaged of the 5mm thickness insulation, the freezing was completed after 13 hours, 10 hours and 7 hours respectively. And in cases of the 10mm thickness insulation, the freezing was completed after 18 hours, 10.5 hours and 8 hours respectively. As a result, it is predicted that the water freezing would occurred when the water supply pipe with 8% or 20% damaged insulation are installed in the exterior wall. However, the water freezing would not occurred when the water supply pipe with 10mm thickness insulation of 0% damage is installed in the exterior wall.

상·하수 배관재의 수 환경에서 부식진전도 연구 (Research of Corrosion Growth Degree According in Liquid Environment of Waterworks and Sewer Piping Material)

  • 박경동;기우태;유형주;김동욱
    • 한국기계가공학회지
    • /
    • 제5권4호
    • /
    • pp.33-40
    • /
    • 2006
  • The quality of the supply water which is supplied to consumer is not the thing of water after filtrating but the thing of water from faucet through pipe. As a result, heavy metals and microorganism, that is the major materials, which cause the distrust of the supply water is generated by supply process. Especially, the heavy metal is generated by the corrosion of waterworks. Besides, rupture by corrosion of pipe becomes the factor of supply water's pollution in waterworks and the factor of pollution of the soil and environment in drain pipe. Therefore, this research examined the weight reduction electric potential measure to measure the corrosion degree of piping materials after testing the corrosion of piping materials(Copper Pipe, Galvanized Steel Pipe, Stainless Steel Pipe) which is generally used at the moment in various corrosion environments(subterranean water, supply water, 3.5% NaCl, 3.5% $HNO_3$). And let me show basic design data about problem occurrence such as leakage water, rust water, inside and outside corrosion from this.

  • PDF

고강도 수도용 PVC관의 성능평가 연구 (Evaluation Method of Plastic Pipe for High-Strength Water Supply)

  • 박종일;이창석
    • 설비공학논문집
    • /
    • 제30권1호
    • /
    • pp.44-49
    • /
    • 2018
  • High-strength plastic water supply pipe evaluation method was evaluated in this study. Up to date, high strength water supply pipes that we install are mostly ductile cast iron pipes. Sometimes, a few PVC pipes are installed. Metal pipes have rust problem on the surface, causing serious damage to metal pipes and reducing the expected life span of water piping system. Nowadays, depending on technology development, some companies have improved properties of general PVC pipe performance with remarkable properties that exceed KS and ASTM standard. Here, we suggest a new method of performance evaluation for high-strength water plastic pipes.

용수공급 안정화를 위한 연계관로 설계 및 평가 (A Study on the design and evaluation of connection pipes for stable water supply)

  • 장용훈;김주환;정관수
    • 상하수도학회지
    • /
    • 제26권2호
    • /
    • pp.249-256
    • /
    • 2012
  • The paper describes a design methodology that can select a proper reliability factor and apply the selected reliability factor into the real water distribution system. Reliability factors which are used for the assesment of water supply networks, can be categorized by a connectivity, a reachability, an expected shortage and an availability. Among these factors, an expected shortage is the most proper reliability factor in the aspect of economic evaluation. Therefore, the expected shortage is applied to draw a water supply reliability into Changwon water supply systems. And the economic pipe diameter can be determined as 600mm for a connection pipe in the pipe network from the estimation of the expected shortage. Also, a quantitative effect of the connection pipe can be expressed in terms of the reduction, which is estimated by the expected shortage of 30,269$m^{3}$ from 68,705$m^{3}$ at initial condition to 38,436$m^{3}$ under the connected condition with the diameter 600mm pipe.

상수관로의 노후도 영향인자 및 가중치 산정에 관한 연구 (Estimation of Deterioration and Weighting Factors in Pipes of Water Supply Systems)

  • 김응석;김중훈;이현동
    • 상하수도학회지
    • /
    • 제16권6호
    • /
    • pp.686-699
    • /
    • 2002
  • The purpose of this study is to estimate deterioration factors and weighting factors in pipe network which each local self-governments takes rehabilitation and replacement work present time. Deterioration factors in pipe network are able to effected of specific province or location related with water supply. Most of water supply pipes are laid under the ground, it is hard to quantify deterioration degree of water system. Moreover, the timing and economic limitation and insufficient information on the spot survey gives a difficulty to look over how old water supply system is. Accordingly, this study collects and analyses five data as the laying environment, visual analysis, analysis of soil contents, analysis of pipe material, and questionary survey data in water pipe of A city. The deterioration factor estimates 14 factors with excavation and experimental analysis and 9 factors without excavation and experimental analysis. Also, the weighting factors are estimated by using the multiple linear regressions and the linear programming. The estimated deterioration factor and weighting results are compared the analysis result of visual, pipe material, and soil contents with the Probabilistic Neural Network Model. Consequently, the model results of estimated 9 factors in this study and 14 factors show the 1-2% difference. The result show that the proposed model could be used to decide the deterioration condition of pipe line with real excavation and experimental analysis.

상수도 시스템의 운영 및 유지관리 의사결정 지원을 위한 시스템다이내믹스 모형의 개발 (Development of a System Dynamics Model to Support the Decision Making Processes in the Operation and Management of Water Supply Systems)

  • 박수완;김규리;김봉재;임기영
    • 한국수자원학회논문집
    • /
    • 제43권7호
    • /
    • pp.609-623
    • /
    • 2010
  • 본 논문에서는 시스템다이내믹스(System Dynamics, SD) 방법론에 입각하여 상수도 시스템의 운영에 내재된 피드백 루프 메커니즘(feedback loop mechanism)을 상수관로의 유지관리와 연관하여 규명하고, 관로 상태의 변화가 전체 시스템에 미치는 영향을포함한 상수도 시스템의 운영지표를예측하여 상수도 시스템의 효율적인운영 및 유지관리를 지원할 수 있는 SD 컴퓨터 모의 모형(simulation model)을 개발하였다. 개발된 모형은 물 공급(water supply) 모형, 관로 유지 관리(pipe maintenance) 모형 및 상수도 재정(water supply business finance) 모형으로 구성된다. 연구대상 지역 상수도 시스템의 운영 자료를 개발된 모형에 적용하여 모형을 검증하고 시스템의 과거 및 미래의 운영 상태를 추정하였으며, 시스템의 운영에 큰 영향을 미치는 정책 지렛대를 발견하였다. 정책 지렛대 발견을 위해 모형의 외부변수의 변화에 대한 연구대상 시스템의 주요 운영지표의 민감도가 분석되었는데 관로의 유지관리에 연관된 외부변수는 누수수량과 관로의 변화에는 큰 영향을 끼치나, 유수율을 비롯한 주요 운영지표에는 큰 영향을 미치지 않는 것으로 나타났다. 관로의 유지관리와 유수율과 같은 주요 운영지표 간의 관계를 보다 정확히 모형화하기 위해서는 관로의 누수 또는 사고로 인해 발생하는 사회적 비용의 발생과 그 전파 메카니즘이 모형화되어야 할 것으로 분석된다.

수도용 강관의 온도변화에 따른 물리적 특성에 대한 연구 (Study on the Physical Characteristics of Water Supply Steel Pipe according to Temperature Change)

  • 김우영;장암
    • 대한환경공학회지
    • /
    • 제39권12호
    • /
    • pp.733-740
    • /
    • 2017
  • 환경부에서 수립한 "상수도 시설기준(2004)"은 관로 신축이음관 설치기준에 있어서는 용접이음 강관에는 설치하지 않는 것으로 규정하고 있으며, 이에 대한 근거가 명확하지 않고 관로 안정성이 충분히 확보되었는지 확인하기가 어렵다. 금번 연구에서는 강관의 거동 분석을 통한 관로 안정성을 연구하여 신축이음관의 필요여부를 검증하는 것을 목적으로 하였다. 검토결과는 아래와 같다. 첫째, 아스팔트 도복장강관(D2,400 mm)은 온도변화에 따라 4-cycle로 관로 신 수축이 반복되며, 연장 1.24 km에 있어 최대 13.03 mm의 변위를 나타내었다. 둘째, 수도용 강관의 신 수축으로 발생되는 온도응력은 매설깊이(최대 4 m)에 따라 $13.7{\sim}36.1kgf/cm^2$로 발생되며, 강관(STWW 400)의 안정성에 큰 영향을 키치는 주요 비교인자인 허용 인장강도와 피로한도는 $4,100kgf/cm^2$$1,840kgf/cm^2$로 산출되었다. 마지막으로, 수도용 강관의 온도응력은 허용 인장강도와 피로한도와 비교시 매우 작음에 따라, 온도변화에 의한 관로의 신 수축이 발생하여도 관로 안정성에는 영향을 끼치지 못함을 알 수 있었다. 결론적으로 금번 연구를 통하여 수도용 강관의 관로부에는 신축이음관을 설치할 필요가 없는 것으로 증명되었다.