The optimum dosage control is presumably the goal of every water treatment plant. However it is difficult to determine the dosage rate of coagulant, due to nonlinearity, multivariables and slow response characteristics, etc. To deal with this difficulty, the real number genetic-fuzzy system was used in determining the dosage rate of the coagulant. The genetic algorithms are excellently robust in complex optimization problems. Since it uses randomized operators and searches for the best chromosome without auxiliary informations from a population which consists of codings of parameter set. To apply this algorithms, we made the real number rule table and membership function from the actual operation data of the water treatment plant. We determined optimum dosages of coagulant(LAS) using the fuzzy operation and compared them with the dosage rate of the actual operation data.
Treatment efficiencies of water quality parameters such as $KMnO_4$ Demand, $UV_{254}$, Turbidity, and LAS(Linear Alkyl Sulfonate) were compared between DAF(Dissolved Air Flotation) and CGS(Conventional Gravitational Sedimentation). The experimental results showed that DAF is much more efficient in treatment of water quality parameters than CGS. The optimum pH was about 7, and optimum alum($Al_2(SO_4)_3$) dose was about 30 ppm for DAF treatment. Economic aspects were also analyzed for bath systems. Even though production cost per ton of drinking water is slightly higher in DAF than in CGS, it turned out that construction cost and land value of CGS far surpass the production cost. DAF system is superior in removal efficiency of impurities and in production cost as a whole to CGS system.
Pre-filter system that was consisted of wasted-tire, non-woven fabrics, and sponge was developed as a primary treatment process prior to rainwater reservation or a pre-treatment process of rainwater reuse system for reclamation. By using this system, SS concentration, TOC, COD, and turbidity could decreased by 86.7%, 62.6%, 69.1% and 66.5%, respectively. From the results of particle size distribution of treated water, the particles over than $30{\mu}m$ of diameter were completely removed by pre-filter system. But 90% of particles less than $20{\mu}m$ of diameter were passed through pre-filter. Optimal depth of wasted-tire and non-woven fabrics were 15cm and 2.4cm, respectively. Pre-filter system was considered as an effective alternative for pre-treatment of rainwater including non-point pollutants and it could be also applied for the treatment of combined sewer overflow (CSO).
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
한국지하수토양환경학회 2003년도 총회 및 춘계학술발표회
/
pp.90-93
/
2003
Sampling of waters from each stage of treatment system, SAPS (Successive Alkalinity Producing System), and spring water near the Hanchang coal mine of Kangwon. Province were carried out periodically and analyzed to evaluate the source and possible path of groundwater contamination by acid mine drainage(AMD). Chemical and sulfur isotope compositions showed that spring water was affected by seepage from mine tailings, and seepage of stonewall, a part of treatment system, was affected by both seepage from mine tailings and mine adit drainage. Through the treatment system no appreciable decrease of sulfur content was identified. And almost similar sulfur isotope compositions of water from each stage of the treatment system may suggest incomplete or very poor sulfate reduction by sulfate reducing bacteria.
It is difficult to determine the feeding rate of coagulant in water treatment process, due to nonlinearity, multivariables and slow response characteristics etc. To deal with this difficulty, the fusion of genetic algorithms and fuzzy inference system was used in determining of feeding rate of coagulant. The genetic algorithms are excellently robust in complex operation problems, since it uses randomized operators and searches for the best chromosome without auxiliary information from a population consists of codings of parameter set. To apply this algorithms, we made the look up table and membership function from the actual operation data of water treatment process. We determined optimum dosages of coagulant (PAC, LAS etc.) by the fuzzy operation, and compared it with the feeding rate of the actual operation data.
Kim, Dong-Ryong;Kim, Gi-Tae;Han, Byong-Ok;Han, Sang-Ok
Proceedings of the KIEE Conference
/
대한전기학회 2007년도 춘계학술대회 논문집 전기설비전문위원
/
pp.61-63
/
2007
In these days there are many troubles - system data error, control malfunctions, cable overheating - in water treatment plant. Specially DAF(Dissolved Air Floation Process) plant has high frequency than previous water treatment process. DAF plant has diverse equipment, nonlinear loads for the precise control. But there is no sufficient overall study about harmonics condition of water treatment plant just taking a following partial action without a fundamental solution. On designing of power system, designer should have regard to harmonics condition, but there is no guide reflected harmonics condition on DAF plant This study says what is the result of guideless design about harmonics. With the result of diagnosis and analysis in DAF plant, economical efficiency and safety of plant will be upgraded in the next design.
Journal of the Institute of Convergence Signal Processing
/
제16권3호
/
pp.108-114
/
2015
Ballast water is carried by ships to ensure stability, trim and structural integrity. When a ship loads cargo, the ballast water is discharged. When foreign marine microorganisms are introduced into new marine environments, they pose a threat to the local marine ecological system. UV system is commonly used for the disinfection of waste and surface water. This method would not be as efficient because some species do survive to form viable populations, much of the sediment and organisms at the bottom of tanks, and may become serious pests. In this paper, we designed and implemented ballast water treatment system using fuzzy PID controller to prevent lamp damage, and to reduce the formation of the viable populations. The experiments were conducted with ballast water treatment system using fuzzy PID controller with short time exposure to the temperature above $40^{\circ}C$. This system was shown to be effective by significantly reducing bacterial population and lamp life extension through appropriate temperature of ballast water.
Magazine of the Korean Society of Agricultural Engineers
/
제42권5호
/
pp.94-102
/
2000
Investigated was the effectiveness of a constructed wetland system on water quality in Hwa-Ong estruarin reservoir, located in Hwasung-Gun, Kyunggi-Do. Procedures for estimation of pollutant loading from watershed and required area for natural systems, and simulation of corresponding reservoir water quality were reviewed. Generally, simulated reservoir water quality was within the reasonable range, and about 15% of total polder farmland was required to meet the agricultural water quality standards. The model was applied based on the current loading condition without additional treatment systems. Wetland system is an ecologically sound treatment system. Therefore, natural systems can be an alternative measure for water quality improvement in polder projects. The area for natural systems was estimated using literature value which might be acceptable at the planning stage. However, pilot system and its experimental data are requisite for large scale field application. WASP5 was proved to be a useful and versatile model, and its application to estuarine reservoir water quality simulation was thought to be appropriate.
The object of study were the development of membrane process and the optimization of operation condition for membrane system, which was used the pre-treatment system of tap water treatment in steady of conventional process such as coagulation, sedimentation. The higher steady flux is very important factor, by a suitable pre-treatment and optimization of operating condition such as fouling control, crossflow and backwashing method, in membrane system. So, we were observed the effect of flux decline for membrane used by 4 type ultrafiltration(UF) membrane pre-treatment process, and optimized the operation condition of filtration system under various MWCO(Molecular weight cut-off), operation pressure, linear velocity and temperature to maintain higher flux. From these experiment, we were identified that UF process showed a slower flux decline rate and a higher flux recovery than microfiltration(MF) membrane. The water quality of UF permeate was better than that of MF, and was not effected pre-treatment process. In the operation condition, the rate of flux decline was diminished by a higher linear velocity and operation temperature, lower pressure.
Proceedings of the Korea Water Resources Association Conference
/
한국수자원학회 2009년도 학술발표회 초록집
/
pp.2179-2183
/
2009
As urbanization is progressed, the network for distributing water in a basin become complex due to the spatial expansion and parameter uncertainties of water supply systems. When a long range water supply plan is determined, the total construction and operation cost has to be evaluated with the system components and parameter uncertainties as many as possible. In this paper, the robust optimization approach of Bertsimas and Sim is applied in a hypothetical system to find a solution which remains feasible under the possible parameter uncertainties having the correlation effect between the uncertain coefficients. The system components to supply, treatment, and transport water are included in the developed water supply system and construction and expansion of the system is allowed for a long-range period. In this approach, the tradeoff between system robustness and total cost of the system is evaluated in terms of the degree of conservatism which can be converted to the probability of constraint violation. As a result, the degree of conservatism increases, the total cost is increased due to the installation of large capacity of treatment and transportation systems. The applied robust optimization technique can be used to determine a long-range water supply plan with the consideration of system failure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.