Recently, needs for reuse of sludge produced from WTP(water treatment plant) have been increased with shortage of landfill sites and difficulties of the treatment and disposal processes. Therefore, Reusing is becoming an Increasingly popular waste management alternative to divert waste from landfills. In order to research the characteristics of WTP sludges, we used the sludges of C WTP which intake the lake Dae-Cheong and the sludges of S WTP which intake Keum river, The specific surface area of C and S WTP sludges were $0.9986m^2/cc\;and\;1.874m^2/cc$, respectively. The gravity was about $2.0{\sim}2.4$ which are scope of peat or loamy clay. The major minerals of C WTP sludges were kaolinite(48.4%), muscovite(19.5%), and quartz(16.7%). Also, muscovite(31.6%), quartz(30.3%), and kaolinite(17.3%) in S WTP sludges were major minerals.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.73-73
/
2023
전 세계적으로 기후변화의 영향이 심화되면서, 예상치 못한 가뭄 지속에 따른 물부족 문제 역시 심각해지고 있으며, 국제사회 및 국내외 기업들은 기후변화 심화에 따른 물 리스크를 관리하기 위한 Water Positive 시스템의 도입, ESG 경영, 환경공시 강화 등을 추진하고 있다. 우리나라의 경우 최근 광주·전라남도 지역에서 가뭄이 발생하여, 기업과 지역주민들이 물절약 캠페인을 벌이고, 공장 정비 일정을 변경하는 등의 대응을 하고 있으며, 중앙 정부 및 지방 정부 역시 물 부족대응을 위한 다양한 정책을 추진하고 있다. 본 연구는 이와 같이 기후변화로 인해 심화되는 가뭄대응에 대한 경제적 가치를 추정하는 것을 목적으로 수행되었다. 특히 최근 지속되는 가뭄으로 물부족이 심각한 광주 및 전라남도 지역 주민을 대상으로 물부족 문제 대응에 대한 경제적 가치를 산정해보았다. 다양한 시나리오 하에서 분석이 가능하도록 단위 가치를 추정할 수 있는 선택실험법을 적용하였으며, 광주 및 전라남도 지역의 소득이 있는 1,000가구를 대상으로 지역별·연령별 표본설계를 하였다. 조사된 결과를 바탕으로 추정된 경제적 가치는 다양한 물부족 대응 프로젝트, 정책 등의 평가시 기초자료로 활용될 수 있을 것이다.
Chung, Kyungmi;Yeo, In-Ho;Lee, Wonil;Oh, Young Khee;Park, Tae Shin;Park, Yong-gyun
Journal of Korean Society of Water and Wastewater
/
v.30
no.4
/
pp.401-408
/
2016
Desalination is getting more attention as an alternative to solve a global water shortage problem in the future. Especially, a desalination technology is being expected as a new growth engine of Korea's overseas plant business besides one of the solutions of domestic water shortage problem. In the past, a thermal evaporation technology was a predominant method in desalination market, but more than 75% of the current market is hold by a membrane-based reverse osmosis technology because of its lower energy consumption rate for desalination. In the future, it is expected to have more energy efficient desalination process. Accordingly, various processes are being developed to further enhance the desalination energy efficiency. One of the promising technologies is a desalination process combined with Pressure Retarded Osmosis (PRO) process. The PRO technology is able to generate energy by using osmotic pressure of seawater or desalination brine. And the other benefits are that it has no emission of $CO_2$ and the limited impact of external environmental factors. However, it is not commercialized yet because a high-performance PRO membrane and module, and a PRO system optimization technology is not sufficiently developed. In this paper, the recent research direction and progress of the SWRO-PRO hybrid desalination was discussed regarding a PRO membrane and module, an energy recovery system, pre-treatment and system optimization technologies, and so on.
Kim, Heewon;Sin, Yeonju;Choi, Jungheon;Kang, Hyunwoo;Ryu, Jichul;Lim, Kyoungjae
Journal of Korean Society on Water Environment
/
v.27
no.4
/
pp.405-412
/
2011
Increased Non-permeable areas which have resulted from civilization reduce the volume of groundwater infiltration that is one of the important factors causing water shortage during a dry season. Thus, seeking the efficient method to analyze the volume of groundwater in accurate should be needed to solve water shortage problems. In this study, two different watersheds were selected and precipitation, soil group, and land use were surveyed in a particular year in order to figure out the accuracy of estimated infiltration recharge ratio compared to Web-based Hydrograph Analysis Tool (WHAT). The volume of groundwater was estimated considering Antecedent soil Moisture Condition (AMC) and Curve Number (CN) using Long Term Hydrologic Impact Assessment (L-THIA) model. The results of this study showed that in the case of Kyoung-an watershed, the volume of both infiltration and baseflow seperated from WHAT was 46.99% in 2006 and 33.68% in 2007 each and in Do-am watershed the volume of both infiltration and baseflow was 33.48% in 2004 and 23.65% in 2005 respectively. L-THIA requires only simple data (i.e., land uses, soils, and precipitation) to simulate the accurate volume of groundwater. Therefore, with convenient way of L-THIA, researchers can manage watershed more effectively than doing it with other models. L-THIA has limitations that it neglects the contributions of snowfall to precipitation. So, to estimate more accurate assessment of the long term hydrological impacts including groundwater with L-THIA, further researches about snowfall data in winter should be considered.
Gnawali, Kapil;Han, KukHeon;Koo, KangMin;Yum, KyungTaek;Jun, Kyung Soo
Proceedings of the Korea Water Resources Association Conference
/
2019.05a
/
pp.161-161
/
2019
Water security issues, stimulated by increasing population and changing climate, are growing and pausing major challenges for water resources managers around the world. Proper utilization, management and distribution of all available water resources is key to sustainable development for achieving water security To alleviate the water shortage, most of the current research on multi-sources combined water supplies depends on an overall generalization of regional water supply systems, which are seldom broken down into the detail required to address specific research objectives. This paper proposes the concept of optimization framework on multi water sources selection. A multi-objective water allocation model with four objective functions is introduced in this paper. Harmony search algorithm is employed to solve the applied model. The objective functions addresses the economic, environmental, and social factors that must be considered for achieving a sustainable water allocation to solve the issue of water security.
Proceedings of the Korea Water Resources Association Conference
/
2019.05a
/
pp.164-175
/
2019
The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.
Journal of The Korean Society of Agricultural Engineers
/
v.53
no.6
/
pp.51-58
/
2011
The objective of this study is to identify whether or not the ground water level is decreasing. We suggest a method of estimating the change in groundwater level using newly developed groundwater pumping station data. The Goseong area located in Gyeongnam province was selected considering three factors. First, this area demands relatively large amount of irrigation water because most of the land is used as a paddy field and the proportion of the paddy field within total arable land is increasing. Second, groundwater level data in nearby area are available since these are monitored by Water Management Information System (WAMIS). Third, many groundwater pumping stations have been developed in this area in order to overcome droughts thus detail information for pumping stations are available. Regression results indicate groundwater level has been decreased for over 20 years. This decreasing trend is due to the shortage of surface irrigation water which was caused by the decrease in rainfall.
Journal of the Korean Professional Engineers Association
/
v.42
no.6
/
pp.47-52
/
2009
According to increasing demand of water mainly due to the growth of population and increased water consumption, many countries either face or worry about the shortage of fresh water. Proportionately, importance and efforts of each country to develop the potable water has been gradually increasing as well. Among others, desalination of seawater has been developed to one of the solutions mainly from the middle east and other arid regions to produce large quantity of fresh water from seawater. We installed beach seawater collector wells to develop the filtered seawater supply for desalination in a refinery. We came to a conclusion that the beach seawater collector well is one of the recommendable alternatives of seawater pre-treatment for desalination applications with lower operating cost and higher efficiency.
Proceedings of the Korea Concrete Institute Conference
/
1998.10b
/
pp.883-887
/
1998
Hydration is the main reason for the growth of the material properties. A exact parameter to control the chemical and physical process is not the time, but the degree of hydration. Therefore, it is reasonable that development all material properties should be formulated in terms of degree of hydration. Mathematical formulation of degree of hydration is based on combination of reaction rate functions. The effect of moisture conditions as well as temperature on the rate of reaction is considered in the degree of hydration model. This effect is subdivided into two contributions: water shortage and water distribution. The former is associated with the effect of on the progress of hydration. The water needed for progress of hydration do not exist and there is not enough space for the reaction products to form. The latter is associated with the effect of free capillary water distribution in the pore system. Physically absorption layer does not contribute to progress of hydration and only free water is available for further hydration.
Oh, Seunghyun;Kim, Jungwook;Chae, Myung-Byung;Bae, Younghye;Kim, Hung Soo
Journal of Wetlands Research
/
v.20
no.3
/
pp.210-218
/
2018
It is very important to analyze water balance in the mountain wetland for the sustainable management of the wetland. In this study, the SWAT model was used to analyze the water balance of Janggun wetland located in Geumjeong mountain of Gyungnam province, Korea. The data such as rainfall and water level measured in Janggun wetland were used for water balance analysis and from the analysis we have known that the rainfall of 10mm within 8 days is required for maintaining an appropriate water level in Janggun wetland. Also, water balance analysis in the wetland for the period of 2009 to 2017 was performed by using hydro-meteorological data obtained from Yangsan weather station which is located around Janggun wetland. From the analysis results, we have known that the amount of rainfall was relatively small in 2010, 2012 and 2015 and water shortage was occurred in the wetland. Especially, water shortage was occurred during the summer that we had intensive rainfall for very short time and faster removal of the runoff from the wetland. Therefore, we may need extend water courses from a wetland watershed to the wetland for preventing land-forming of the wetland and also store water by banking up the wetland for preventing the decrease of water level in the wetland.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.