• Title/Summary/Keyword: Water Resources Operation

Search Result 921, Processing Time 0.021 seconds

Development of Open Water Management Program(OWMP) for Water Management Automation System with Open Architecture (물관리자동화시스템을 위한 개방형 운영 프로그램 개발)

  • 김선주;김필식;윤찬영;박재홍
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.5
    • /
    • pp.83-92
    • /
    • 2001
  • As a result of the recent water resources crisis, development of water management automation system becomes important. This system should be developed with open architecture in order to flexibly meet the spacial and time change of irrigation water demand. Thereby, water management automation system requires open architecture and suitable software program. This study presents an application of object-oriented methodology for Open Water Management Program(OWMP). Accordingly, OWMP provides a high degree of reliability which allows modification of parameters by change of region or time to be possible. OWMP consists of Data Base Management System(DBMS) and Model System. DBMS makes it possible to analyze data related with planning water schedule and establishing database. Model System calculates reservoir inflow, reservoir effluent and basin water demand. An operator decides the reservoir operation with results of Model System and DBMS. OWMP could be adapted to the planning and decision for saving water.

  • PDF

Reservoir Operating System Using Sampling Stochastic Dynamic Programming for the Han River Basin (표본 추계학적 동적계획법을 사용한 한강수계 저수지 운영시스템 개발)

  • Eum, Hyung-Il;Park, Myung-Ky
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.1
    • /
    • pp.67-79
    • /
    • 2010
  • Korea water resources corporation (K-Water) has developed the real-time water resources management system for the Nakdong and the Geum River basin to efficiently operate multi-purpose dams in the basins. This study has extended to the Han River basin for providing an effective ending target storage of a month to the real-time water resources management system using Sampling Stochastic Dynamic Programming (SSDP), consequently increasing the efficiency of the reservoir system. The optimization model were developed for three reservoirs, named Soyang, Chungju, and Hwacheon, with high priority in terms of the amounts of effective capacity and water supply for the basin. The number of storage state variable for each dam to set an optimization problem has been assigned from the results of sensitivity analysis. Compared with the K-water operating policy with the target water supply elevations, the optimization model suggested in this study showed that the shortfalls are decreased by 37.22 MCM/year for the required water demands in the basin, even increasing 171 GWh in hydro electronic power generation. In addition, the result of a reservoir operating system during the drawdown period applied to real situation demonstrates that additional releases for water quality or hydro electronic power generation would be possible during the drawdown period between 2007 and 2008. On the basis of these simulation results, the applicability of the SSDP model and the reservoir operating system is proved. Therefore, the more efficient reservoir operation can be achieved if the reservoir operating system is extended further to other Korean basins.

Development and application of integrated indicators for assessing the water resources performance of multi-purpose and water supply dams (댐 용수공급능력 안정성 평가를 위한 통합지표 개발 및 적용)

  • Sung, Jiyoung;Kang, Boosik;Kim, Bomi;Noh, Seongjin
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.687-700
    • /
    • 2022
  • For comprehensively assessment the water resources performance of multi-purpose dams and water supply dams in South Korea, a methodology was proposed to utilize the durational reliability along with the integrated auxiliary indicators including resiliency, dimensionless vulnerability, water resource efficiency, specific inflow, and specific water supply. In addition, for the purpose of sustainable dam operation in the future, a plan to grade the water resources performance was presented to periodically evaluate the performance and determine the priority of each dam's structural or non-structural planning according to the evaluation results. As major results, in the case of Sumjingang Dam, the durational reliability was 99.0%, but the integrated auxiliary index was the lowest of 44 points, which was 5th grade. This means that despite the current high reliability, hydrological changes due to future climate change or regional change of water demand-supply balance can have significant impacts on the water resources performances. In contrast, the Chungju Dam with a durational reliability of 93.0%, which is below the average among all multi-purpose dams, shows the 76 points of the integrated auxiliary index, which is 3rd highest following the Soyanggang Dam and the Namgang Dam. Nevertheless, due to the size of the basin, the specific inflow is sufficiently high as 185%, so the actual performance could be evaluated relatively high. The water supply dams designed for a single purpose tend to be evaluated relatively high because they have a high proportion of industrial and municipal water supply and have enough room for the supply capacity.

Application of deep learning method for decision making support of dam release operation (댐 방류 의사결정지원을 위한 딥러닝 기법의 적용성 평가)

  • Jung, Sungho;Le, Xuan Hien;Kim, Yeonsu;Choi, Hyungu;Lee, Giha
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.spc1
    • /
    • pp.1095-1105
    • /
    • 2021
  • The advancement of dam operation is further required due to the upcoming rainy season, typhoons, or torrential rains. Besides, physical models based on specific rules may sometimes have limitations in controlling the release discharge of dam due to inherent uncertainty and complex factors. This study aims to forecast the water level of the nearest station to the dam multi-timestep-ahead and evaluate the availability when it makes a decision for a release discharge of dam based on LSTM (Long Short-Term Memory) of deep learning. The LSTM model was trained and tested on eight data sets with a 1-hour temporal resolution, including primary data used in the dam operation and downstream water level station data about 13 years (2009~2021). The trained model forecasted the water level time series divided by the six lead times: 1, 3, 6, 9, 12, 18-hours, and compared and analyzed with the observed data. As a result, the prediction results of the 1-hour ahead exhibited the best performance for all cases with an average accuracy of MAE of 0.01m, RMSE of 0.015 m, and NSE of 0.99, respectively. In addition, as the lead time increases, the predictive performance of the model tends to decrease slightly. The model may similarly estimate and reliably predicts the temporal pattern of the observed water level. Thus, it is judged that the LSTM model could produce predictive data by extracting the characteristics of complex hydrological non-linear data and can be used to determine the amount of release discharge from the dam when simulating the operation of the dam.

Re-chlorination facility design to cope with virus intrusion in water distribution system (상수도 관망 내 바이러스 유입 대응을 위한 재염소 시설 설계)

  • Kim, Beomjin;Lee, Seungyub
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.4
    • /
    • pp.277-287
    • /
    • 2024
  • Water distribution system (WDS) is exposed to various water quality incidents during its operation. This study utilized Quantitative Microbial Risk Assessment (QMRA) to analyze the risk associated with potential virus intrusion in WDSs. Additionally, the study determined the location and operation of rechlorination facilities to minimize potential risk. In addition, water quality resilience was calculated to confirm that the chlorine concentration maintains within the target range (0.1-1.0 mg/L) during normal operation. Hydraulic analysis was performed using EPANET, while EPANET-MSX was linked to simulate the reactions between viruses and chlorine. The proposed methodology was applied to the Bellingham network in the United States, where rechlorination facilities capable of injecting chlorine concentrations ranging from 0.5 mg/L to 1.0 mg/L were considered. Results indicated that without rechlorination facilities, the Average risk was 0.0154. However, installing rechlorination facilities and injecting chlorine at a concentration of 1.0 mg/L could reduce the Average risk to 39.1%. It was observed that excessive chlorine injection through rechlorination facilities reduced water quality resilience. Consequently, a rechlorination facility with a concentration of 0.5 mg/L was selected, resulting in a reduction of approximately 20% in average risk. This study provides insights for designing rechlorination facilities to enhance preparedness against potential virus ingress in the future.

Unit Water Production Cost Development for Alternative Water Resource Projects - Centered on the Economics of Aquifer Storage and Recovery (ASR) - (대안수자원시설의 음용수 단위생산비용 산출 - 청정지하저수지 경제성에 대한 고찰 -)

  • Choi, Jae-Ho;Shim, Young-Gyoo;Park, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.611-619
    • /
    • 2017
  • This paper intends to develop unit water production cost (UWPC) between alternative water resources including desalination, freshwater reservoirs, single-purpose dams, underground dams, and two indirect water in-take technologies - riverbank filtration and aquifer storage and recovery (ASR). The UWPCs of water supply schemes including each alternative are determined based on project cost, and operation and maintenance estimation models, which were developed based on real project cost data. The sensitivity analysis of UWPCs reveals that ASR is the lowest cost option in producing drinkable water among the alternatives, followed by riverbank filtration and underground dam. It is expected that economics related to the finding plays a critical role in supporting water resources planning and budget allocation for central and local water authority in Korea.

A Mathematical Model for Coordinated Multiple Reservoir Operation (댐군의 연계운영을 위한 수학적 모형)

  • Kim, Seung-Gwon
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.6
    • /
    • pp.779-793
    • /
    • 1998
  • In this study, for the purpose of water supply planning, we propose a sophisticated multi-period mixed integer programming model that can coordinate the behavior of multi-reservoir operation, minimizing unnecessary spill. It can simulate the system with operating rules which are self- generated by the optimization engine in the algorithm. It is an optimization model in structure, but it indeed simulates the coordinating behavior of multi-reservoir operation. It minimizes the water shortfalls in demand requirements, maintaining flood reserve volume, minimizing unnecessary spill, maximizing hydropower generation release, keeping water storage levels high for efficient hydroelectric turbine operation. This optimization model is a large scale mixed integer programming problem that consists of 3.920 integer variables and 68.658 by 132.384 node-arc incidence matrix for 28 years of data. In order to handle the enormous amount of data generated by a big mathematical model, the utilization of DBMS (data base management system)seems to be inevitable. It has been tested with the Han River multi-reservoir system in Korea, which consists of 2 large multipurpose dams and 3 hydroelectric dams. We demonstrated successfully that there is a good chance of saving substantial amount of water should it be put to use in real time with a good inflow forecasting system.

  • PDF

Development of Distributed Rainfall-Runoff Modelling System Integrated with GIS (지리정보시스템과 통합된 분포형 강우-유출 모의 시스템 개발)

  • Choi, Yun-Seok;Kim, Kyung-Tak;Shim, Myung-Pil
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.3
    • /
    • pp.76-87
    • /
    • 2009
  • Most distributed models have been developed for data interchange between model for hydrological analysis and GIS(Geographic Information System). And some interface systems between them have been developed to operate the model conveniently. This study is about developing integrated system between model and GIS not coupled system based on file interchange or interface system. In this study, HyGIS-GRM which is integrated system between GRM(Grid based Rainfall-runoff Model) which is physically based distributed rainfall-runoff model and HyGIS(Hydro Geographic Information System) have been developed. HyGIS-GRM can carry out all the processes from preparing input data to appling them to model in the same system, and this operation environment can improve the efficiency of running the model and analyzing modeling results. HyGIS-GRM can provide objective modeling environment through establishing the process of integrated operation of GIS and distributed model, and we can obtain fundamental technologies for developing integrated system between GIS and water resources model.

  • PDF

A Study of Design factors for Increasing Energy Production in Small Hydro power with Using Long Pipe (장대관로를 이용한 소수력 발전량 향상을 위한 설계요소에 관한 연구)

  • Kim, Hyun-Han;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.8
    • /
    • pp.1134-1139
    • /
    • 2014
  • Recently the need for renewable energy development is expanding due to the global climate change, the environmental issues and the limited fossil energy resources. Dependence of energy on overseas is high in Korea. To resolve the environmental problems and to improve the energy independence rate, the development of renewable energy is more required. The small hydro power, one of the renewable energy resources, has been developing and operating from a long time ago. If we are new developing a small hydro power with the use existing dams and reservoirs, we will design the length of inlet pipe and the diameter suitable for it. However, in case of using the existing water supply pipe which had been designed suitable for water service, the designer has to review and check that the pipe is suitable for operating a generator. In this paper, the design of small hydro power using the existing long pipe of water supply, we suggest the optimum way to reduce the water hammer in pipe which causes the unsteady flow during the load-shutdown of generator, the generator operation plan for the stable supply of water and the design factor of determining the generator capacity through the analysis between discharge and head-loss.

Desalination of Seawater by Reverse Osmosis (역삼투법에 의한 해수의 담수화에 관한 연구)

  • Lee, Sun Ju
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.2
    • /
    • pp.155-164
    • /
    • 2004
  • Many countries, including Korea, suffer from a shortage of freshwater. With increases in population and the quality of life, along with large-scale expansion in industrial and agricultural activities, more freshwater is needed. Available resources, Including ground water, are limited, and desalination presents the opportunity for a new unlimited source of freshwater from the sea. The objectives of this study were to test membrane performance in seawater desalination and to examine the quality of water produced. bath well and sea water were used as water sources. Typically used membrane for seawater desalination and high rejection seawater desalination membrane are maintained at almost same recovery rate and permeate flux, while the conductivity was lower in the operation of typically used seawater membrane. The treated water quality using two types of membranes is satisfied with the Korea drinking water quality standards.