1 |
Kim, Y.-O., Eum, H.-I., Lee, E.G., and Ko., I.H. (2007b). “Optimizing operational policies of a Korean multi-reservoir system using sampling stochastic dynamic programming with ensemble streamflow prediction.” Journal of Water Resources Planning and Management, Vol. 131, No. 1, pp. 4-14.
DOI
|
2 |
Kim, Y.-O., and Palmer, R.N. (1997). “Value of seasonal flow forecasts in Beyesian stochastic programming.” Journal of Water Resource Planning and Management, ASCE, Vol. 123, No. 6, pp. 327-335.
DOI
|
3 |
Klemes, V. (1977). “Value of information in reservoir optimization.” Water Resources Research, Vol. 13, No. 5, pp. 857-850.
DOI
|
4 |
고석구, 이광만, 이한구 (1997). “양해 추계학적 동적계획법에 의한 저수지 운영률 개발.” 한국수자원학회논문집, 제30권, 제3호, pp. 269-278.
과학기술학회마을
|
5 |
건설교통부 (2001). 수자원장기종합계획․Water vision 2020, 건설교통부, 연구보고서
|
6 |
권오익, 김승, 심명필 (1999). “한강 홍수예경보시스템의 저수지 운영모듈 개선.” 한국수자원학회논문집, 제32권, 제6호, pp. 685-695.
과학기술학회마을
|
7 |
한국수자원공사 (2001). 낙동강 수계 댐군 최적연계운영 시스템 개선 연구, 건설교통부, 연구보고서
|
8 |
김양수 (1994). “홍수시 저수지 운영 방법의 고찰(Technical ROM을 중심으로).” 한국수자원지, 제27권, 제4호, pp. 14-18.
과학기술학회마을
|
9 |
심명필, 선우중호, 박인보, 이재형, 정동국 (1990). “홍수기중의 실시간 저수지운영 모형(I): 이론과 모형화.” 한국수자원학회지, 제23권, 제3호, pp. 373-384.
과학기술학회마을
|
10 |
정한우, 최승안, 김형수, 심명필 (2005). “타부탐색기법에 의한 홍수시 저수지운영에 관한 연구.” 한국수자원학회논문집, 제38권, 제9호, pp. 761-770.
과학기술학회마을
DOI
|
11 |
한국수자원공사 (2004a). 실시간 물관리 운영시스템 구축기술 개발, 과학기술부, 연구보고서
|
12 |
한국수자원공사 (2004b). 유역통합물관리를 위한 하천 유출량 예측방안 연구 , 건설교통부, 연구보고서
|
13 |
Karamouz, M., and Houck, M.H. (1987). “Comparison of stochastic and deterministic dynamic programming for reservoir operating rule generation.” Water Resources Bulletin, Vol. 23, No. 1, pp. 1-9.
DOI
|
14 |
Labadie, J.W. (2004). “Optimal operation of multireservoir systems: State-of-the-art review.” Journal of Water Resources Planning and Management, Vol. 130, No. 2, pp. 93-111.
DOI
|
15 |
Kelman, J., Stedinger, J.R., Cooper, L.A., Hsu, E., and Yuan S.Q. (1990). “Sampling stochastic dynamic programming applied to reservoir operation.” Water Resources Research, AGU, Vol. 26, No. 2, pp. 447-454.
DOI
|
16 |
Kim, Y.-O., Eum, H.-I., Kim, S.-U., and Lee, K.S. (2007a). “Monthly joint operations for the Nakdong multi-reservoir system in Korea.” Water International, Vol. 32, No. 3, pp. 416-427
DOI
|
17 |
Stedinger, J.R., Sule, B.F., Loucks, D.P. (1984). “Stochastic dynamic programming models for reservoir operation optimization.” Water Resources Research, AGU, Vol. 20, No. 11, pp. 1499-1505.
DOI
|
18 |
Lee, Y., Kim , S.-K., Ko, I.H. (2008). “Multistage stochastic linear programming model for daily coordinated multi-reservoir operation.” Hydroinformatics, Vol. 20, No. 11, pp. 1499-1505.
|
19 |
Rao, S.S. (1996). Engineering Optimization, John Wiley & Sons, NY.
|
20 |
Young, G.K. (1967). “Finding reservoir operation rules.” Journal of Hydraulics Division, Vol. 93(HY6), pp. 297-321.
|
21 |
음형일, 김영오, 윤지현, 고익환 (2005). “국내 다목적댐 운영계획에 적합한 목적함수에 관한 연구.” 한국수자원학회논문집, 제38권, 제9호, pp. 737-746.
과학기술학회마을
DOI
|
22 |
이재응 (2004). “다목적댐의 연계운영을 위한 최적운영률 개발.” 한국수자원학회논문집, 제37권, 제6호, pp.487-497.
과학기술학회마을
DOI
|
23 |
이재응, 위희상 (2001). “선형결정규칙과 추계학적 동적계획법을 이용한 저수지 규모결정 및 운영에 관한 연구.” 대한토목학회논문집, 제21권, 제2-B호, pp.93-100.
|
24 |
이한구, 이상호 (1998). “복합 모델링 기법을 이용한 홍수시 저수지 최적 운영 (사례 연구 : 충주 다목적 저수지).” 한국수자원학회논문집, 제31권, 제6호, pp. 727-739.
과학기술학회마을
|