• 제목/요약/키워드: Water Quality Improvement

검색결과 1,135건 처리시간 0.037초

하천등급화 모델을 이용한 삽교호 수질관리 방안에 관한 연구 (Water Quality Management Planning for the Lake Sapgyo by Stream Grading Method)

  • 최정호;김홍수;조병욱;박상현;이무규
    • 한국물환경학회지
    • /
    • 제36권3호
    • /
    • pp.245-254
    • /
    • 2020
  • Water quality improvement projects are being implemented without predicting the effect of water quality improvement on Lake Sapgyo. As the method of selecting the target stream for the effective conduct of water quality improvement projects the method of rating the streams were studied. To build a stream grading method, 60 major streams in the Lake Sapgyo system were monitored. The selection method of rivers subject to priority management for water quality improvement was applied to the stream grading method using the Analytic Hierarchy Process (AHP). The analysis of importance by site by stream grading method revealed the following: water quality (36.0%), flow (26.1%), travel load (13.4%), TMDL density (12.0%), TMDL (8.9%), and area (3.7%). The pollution level of the river was scored by using the stream grading method, and the ranking of 51 streams was calculated. Based on this, the group was classified into six grades (A-F). Among the groups, the F and E groups were selected as the priority management streams. Cheonan-Cheon (Cheonan City) was selected as the first stream to establish water quality improvement measures in the Lake Sapgyo system, and Seowoo-Cheon (Dangjin City) was selected as the second site, and Oncheon-Cheon (Asan City) was selected as the third site. Each local government is expected to improve the water quality improvement effect with limited resources when establishing and implementing water quality improvement measures for the streams (F group, E group) to be managed in this study.

유역-호소 통합수질예측 기법을 이용한 물왕저수지 수질개선효과 분석 (A Study on Mulwang Reservoir Water Quality Improvement Effect Using Watershed-Reservoir Integrated Prediction)

  • 오희상;이한필
    • 한국농공학회논문집
    • /
    • 제59권3호
    • /
    • pp.51-62
    • /
    • 2017
  • Since living environment has improved, waterfront space using and clear water demand have increased. Ministry of Environment (ME) designated polluted reservoir (worse than 4th grade) as a priority management reservoir to improve water quality (better than 3rd grade) accordingly. Minstry of Agriculture, Food and Rural Affairs (MAFRA) aims reservoir water quality 4th not 3rd grade. And water quality of agricultural reservoirs was not a great interest. For this reason, there are very few water quality monitoring data. However after designating as a priority management reservoir, reservoir manager should start water quality and flow monitoring of reservoirs and inflow streams. This process makes it possible setting complex model to accurate prediction of reservoir water quality and volume. Mulwang reservoir designated as a priority management reservoir in September 2014. In this study, BASINS/WinHSPF and EFDC-WASP were used to predict effect of water quality improvement countermeasures in Mulwang reservoir. To improve water quality of Mulwang reservoir, Siheung-si and Korea Rural Community Corporation (KRCC) established water quality improvement countermeasures. However result of simulation adapting these countermeasures cannot achieve 3rd grade. So 4 additional scenarios were adapted and the result satisfied 3rd grade. This study could help to establish water quality improvement countermeasure by using complex modeling.

자가 발전 시스템을 갖춘 고전압 전기장 수질개선 장치 개발 (Water Quality Improvement System Using High Voltage Electric Field with Self-Generation System)

  • 강래윤;강철웅
    • 동력기계공학회지
    • /
    • 제19권2호
    • /
    • pp.84-89
    • /
    • 2015
  • The occurrence of algae caused by eutrophication of fresh water is a pollution source to destroy the aquatic environment. When the high voltage electric field is applied in the water, When a high voltage is applied to the electric field in the water, the algae can be broken the balance of cell membranes, and is dead. In this paper, we develop a water quality improvement system for generating an electric field having a higher energy than the zeta potential when a high voltage is applied to 4,000V. To ensure the mobility of the water quality improvement system, we designed the PV generation system using the optimal size technique that is based on the model of power lack ratio. By evaluating the output characteristics of the water quality improvement system, power generation characteristics of the PV generation system, and battery charging characteristics, we can show that the proposed system can be applicable to the water quality improvement system inhibiting the growth rate of the algae in the fresh water.

관개용수 공급체계 변경을 통한 하천의 수질개선 (Water Quality Improvement in the River through Reformation of Irrigation Water Supply Systems)

  • 이광야;김해도;이종남;박종훈
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.540-545
    • /
    • 2006
  • The objective of the study is to assess the water quality improvement resulted from the rearrangement of the irrigation water supply systems at Mankyeong River and Ansung Chun basin. There is a mixed type of watershed composed of urban and rural areas in the region. The water intake facilities for agricultural use such as reservoir, weir and pumping station are generally located at upstream river where the water quality maintains relatively clean. However, this study focuses on moving the water intake to downstream and rearranging the irrigation water supply system, then investigating how effective they are for water quality improvement in the river. When the water intake is moved downstream, the stream flow is increased as much as the amount of irrigation water that is to be taken upstream. The augmented flow which is frequently referred to as environmental flow can function as dilution water for improving the quality of polluted water that is originated from the wastewater in tributaries.

  • PDF

NPS-WET 모형을 이용한 인공습지의 수질정화효과 분석 (Analysis of Water-quality Improvement Efficiency of Constructed Wetland Using NPS-WET Model)

  • 이한필;정광욱;이복수;함종화;손영권
    • 한국물환경학회지
    • /
    • 제28권2호
    • /
    • pp.320-331
    • /
    • 2012
  • A combination system of catch canal and constructed wetland was designed and suggested to improve water quality in gagricultural region of lower Dong-jin river basin. In order to evaluate an water quality improvement efficiency of the designed combination system, the NPS-WET model was applied in this study. Simulation result of the NPS-WET shown that the nutrient load removal rate of constructed wetland was BOD, T-N, T-P and SS was 30.7~39.0%, 46~60%, 40.7~57.0% and 68.2~74.7%, respectively. Nutrients reduction of constructed wetland was higher in growing season than winter season because vital activity of microorganism, macrophyte and algae was augmented with high air and water temperature. Effluents from constructed wetland can affect water-quality of catch canal drains, especially, water-quality on junction point to Dong-jin river. Water-quality improvement in low-flowed catch canal (Un-san) was more significant than in high-flowed catch canal (Won-pyeong). In conclusion, a feasible design of constructed wetland is necessary to treat large quantity of receiving water. The NPS-WET is useful tool for assessing water-quality improvement efficiency using constructed wetland.

부산시 수돗물 수질개선 편익의 추정 (Valuing the Economic Benefits of the Water Quality Improvement in Busan)

  • 곽소윤;유승훈
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2010년도 학술발표회
    • /
    • pp.452-456
    • /
    • 2010
  • Water is an indispensable input to human's existence and industrial production. In these days, people are getting more concerned about their health and the interest in the safety of drinking water has increased. In this situation, this paper attempts to measure the economic benefits of the tap water quality improvement. The study area was restricted to Busan, the second largest city in Korea, where local government is planning to implement a tap water quality improvement program. We apply a one-and-one-half bounded dichotomous choice contingent valuation (CV) method to obtain at least a preliminary evaluation of the benefits. CV is developed for valuing goods or services that cannot be valued either directly or indirectly from market observations and has been applied to several environmental goods. The CV survey was rigorously designed to comply with the guidelines for best-practiced CV studies. We surveyed a randomly selected sample of 400 households in Busan and asked respondents questions in person-to-person interviews about how they would be willing to pay for the water quality improvement. Respondents overall accepted the contingent market and were willing to contribute a significant amount (US$1.66), on average, per household per month. We can also calculate the aggregate value of the program which improves the water quality in Busan. This study is expected to provide policy-makers with useful information for evaluating and planning environmental policies relating specifically to water.

  • PDF

충청남도 4대수계 주요 지류하천 수질 모니터링을 통한 유역 관리 방안 (Watershed Management Plan through Water Quality Monitoring for Main Branches of 4 Water Systems in Chungcheongnamdo)

  • 박상현;김홍수;조병욱;문은호;최진하
    • 한국물환경학회지
    • /
    • 제32권2호
    • /
    • pp.163-172
    • /
    • 2016
  • This study aimed to develop a plan for effective performance of a watershed through correct identification of a river watershed by using the flowrate of the river and water quality data, which is the basis for the establishment of the water environment policy. The target river for water quality improvement was selected based on the monitoring result for 4 water systems in Chungcheongnamdo province in the recent 3 years. The result of analysis for the distribution of discharge capacity by a pollution source group for the water quality improvement target river showed that most of the target river has a high discharge capacity in the water system for living and livestock. Analysis for the density of the total discharge capacity of the whole watershed of Chungcheongnamdo indicated that the river that needs water quality improvement has high BOD concentration and high discharge load density at the point that this river is located. Thus, for efficient watershed management through selection and concentration, Chungcheongnamdo needs to improve the target river in priority. Stepwise planning is also required to establish and execute the water quality improvement in order to satisfy said target water quality, and establish the index for the water improvement rate for its evaluation.

방사보가 도시하천수질에 미치는 영향에 관한 연구 (A study of the Effect of groin on the Water Quality in the Urban River)

  • 조홍제;김일권
    • 상하수도학회지
    • /
    • 제12권3호
    • /
    • pp.81-90
    • /
    • 1998
  • The purpose of this study was to analyze the effect of the groin which was constructed in the down stream of urban river for the prevention of sedimentation on the improvement of the water quality. We studied on the groin in the downstream of Taehwa River constructed to keep the navigation depth of Ulsan day, and used the measured data of the water quality and river discharge. In order to analyze the charge of the water quality due to the groin Que12E model was applied, and BOD and DO was examined. The analysis showed that removal of the groin would not have significant effect on the improvement of the water quality, rather, interception of the pollution source coming into the upstream of the groin would be more influential on the improvement of the water quality. Therefore, It was concluded that to improve the water quality in mild bottom slop of tidal river, interception of the pollution source and river maintenance discharge should precede.

  • PDF

도시하천의 하상퇴적토 준설에 따른 수질변화 예측 (Prediction of Water Quality Variation Caused by Dredging Urban River-bed)

  • 조홍제;이병호;김정식;이근배
    • 한국수자원학회논문집
    • /
    • 제35권2호
    • /
    • pp.137-148
    • /
    • 2002
  • 도시하천 하류부에서의 하상퇴적토 준설에 따른 수직개선효과를 검토하기 위해 유한차분법을 사용하여 목표년도 하수의 차집율에 따라 목표수질 달성에 대한 기여정도를 분석하였다. 도시를 관류하고 있는 11.2km의 하천구간내에 21개 지점을 선정하여 시추를 실시하였으며, 용출시험을 통한 하상퇴적토의 오염정도을 조사하였다. 하상퇴적토 준석에 따른 주요지점별 COD 변화를 갈수량, 저수량 및 평수량에 대해서 검토하였고, 그 결과 오염된 하상퇴적토의 준설이 수질개선에 미치는 효과가 비교적 큰 것으로 나타났다.

원주천 수질개선 방안 및 개선효과 평가 (An Analysis of the Water Quality Improvement Measures and Evaluation of Wonju Stream)

  • 금동혁;신민환;유나영;이서로;김동진;성윤수;이상수
    • 한국농공학회논문집
    • /
    • 제63권1호
    • /
    • pp.61-73
    • /
    • 2021
  • Recently, the deterioration of water quality in Wonju stream has been reported due to the increase in diverse pollution sources along with community development and urbanization. Various types of attempts with a huge budget were made for better water quality so far, but its effectiveness is still doubted. In order to establish site-oriented measures for water quality improvement, the topographic and hydrologic factors were evaluated based on site inspection and survey. As the major streams merged into the Wonju stream, the Hwa and Heungyang streams were found to have higher pollution loads and contributions compared to other streams due to the scattered livestock farms and industries, and vulnerable land use. Notably, the discharge water from the Wonju Public Sewage Treatment Plant had the highest level of pollution load, impacting on the water quality of Wonju Stream. According to the SWAT model as water quality measures, the improvement effect of water quality in this treatment plant can be reached to the reductions in BOD 11.06%, T-N 23.56%, T-P 10.60% when the proper managements applied, whereas the improvement of water quality would be 3.89%, 1.23%, and 3.32% for BOD, T-N, T-P, respectively, for the industries. The reduction of the livestock industry was generally very high as a pollution source, but it was not much higher at the end of Wonju Stream than other measures. These results recommended that the water q uality improvement measures should be designated for each upper-middle-lower section in Wonju stream.