• Title/Summary/Keyword: Water Projects

Search Result 666, Processing Time 0.03 seconds

Guidelines by World Commission on Dams as seen from Japanese Dam Projects in the Past

  • Nakayama, Mikiyasu;Fujikura, Ryo;Mori, Katsuhiko
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2003.05a
    • /
    • pp.219-225
    • /
    • 2003
  • The World Commission on Dams (WCD) in November 2000 published "Dams and Development" as its only and final report. The report proposed "internationally acceptable criteria and standards" Despite the (act that the WCD itself did not regard the report as a blue print, many NGO's strongly support the report and the guidelines, and demand that they be adopted in their current form by funding organizations. The WCD recommendations and guidelines were found to have several "generic" problems, and the proposed guidelines appear unable to be applied as they stand. The authors assume that only several of these guidelines are operational and many of these are either too experimental or theoretical to be put into use. Furthermore, some seemingly "ready for operation" guidelines still need to be enhanced to be really operational in the real world. About 2,000 large dams were constructed in Japan after the Second World War. Various principles and mechanisms were then developed to better address the issues related to involuntary resettlement. The knowledge accumulated through large dam construction projects in Japan may be applied to other countries. The aim of this paper is to identify the lessons, out of the experiences gained in Japan through large dam construction projects in the past, which could be applicable for future large dam construction projects in other nations. The socio-economic settings as well as legal frameworks in Japan may differ other nation. Nevertheless, the following aspects of the experiences gained in Japan are found to be both applicable and useful for future large dam construction projects abroad: (a) Integrity of community in the negotiation process, (b) Provision of alternative occupations, (c) Funding mechanism in the post-project period, (d) Measures needed during planning process, and (e) Making resettlers "shareholders". These lessons may prove useful to enhance the WCD guidelines.

  • PDF

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

Water Quality Management Planning for the Lake Sapgyo by Stream Grading Method (하천등급화 모델을 이용한 삽교호 수질관리 방안에 관한 연구)

  • Choi, Jeongho;Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.3
    • /
    • pp.245-254
    • /
    • 2020
  • Water quality improvement projects are being implemented without predicting the effect of water quality improvement on Lake Sapgyo. As the method of selecting the target stream for the effective conduct of water quality improvement projects the method of rating the streams were studied. To build a stream grading method, 60 major streams in the Lake Sapgyo system were monitored. The selection method of rivers subject to priority management for water quality improvement was applied to the stream grading method using the Analytic Hierarchy Process (AHP). The analysis of importance by site by stream grading method revealed the following: water quality (36.0%), flow (26.1%), travel load (13.4%), TMDL density (12.0%), TMDL (8.9%), and area (3.7%). The pollution level of the river was scored by using the stream grading method, and the ranking of 51 streams was calculated. Based on this, the group was classified into six grades (A-F). Among the groups, the F and E groups were selected as the priority management streams. Cheonan-Cheon (Cheonan City) was selected as the first stream to establish water quality improvement measures in the Lake Sapgyo system, and Seowoo-Cheon (Dangjin City) was selected as the second site, and Oncheon-Cheon (Asan City) was selected as the third site. Each local government is expected to improve the water quality improvement effect with limited resources when establishing and implementing water quality improvement measures for the streams (F group, E group) to be managed in this study.

Waterscape and Water Transportation in Nihombashi River

  • Ito, Kazumasa;Wada, Akira;Imanishi, Yumi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.19-25
    • /
    • 2008
  • Nihombashi district, which is located in a heart of Tokyo Metropolitan area, has been flourished as a Japanese economic and cultural center since Tokyo was developed as a capital. Nihombashi district has still remained the Edo idea of stylishness since the government of Edo was established in 1603. During Edo period, population of Edo (former name of Tokyo) reached one million. Edo became one of big city around the world. Nihombashi district has been transformed as economical, financial and cultural center, along with modern transformation of Tokyo. During high economic growth (1955-1975), Nihombashi Bridge and River, which used to a symbol of Tokyo, have been covered with elevated highways. The river was polluted whereas the river does not have any relationship with people's daily activities. Since Japan has focused on environment concern in 80's, people and companies in Nihombashi district and Nihombashi River also requested to restore Nihombashi district and Nihombashi River. There are a lot of projects going on related to regenerate the river and the community, such as to remove highways covered with the river, restore river environment and run water navigation. This article mentioned to introduce the project of Nihombashi River and Nihombashi district that regenerate the community to capitalize history and geographic characteristics in Nihombashi district, to run water navigation through the river, and to review outcomes through various projects.

  • PDF

The evaluation of BASINS/HSPF and WASP5 model in Hwaong watershed and reservoir (BASINS/HSPF 및 WASP5를 이용한 화옹유역과 담수호의 적용성 검토)

  • Jung, Kwang-Wook;Yoon, Chun-Gyeong;Jang, Jae-Ho;Han, Jung-Yoon
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.540-545
    • /
    • 2005
  • Large scale projects of sea-land reclamation have been practiced mainly to enlarge farmland in Korea. Most projects produced estuarine reservoir with dike construction, which might result in water quality problems due to block of natural flowing of stream water to the sea. Applicability of a widely accepted watershed-based water quality assessment tool (BASINS) and its associated watershed model was evaluated on the Hwaong watershed in Korea. BASINS was found to be a convenient and powerful tool for assessment of watershed characteristics, and provided various tools to delineate the watershed into land segments and river reaches, reclassify land use, and parameterize for HSPF simulation. WASP5 is a general purpose modeling system for assessing the fate and transport of conventional and toxic pollutants in surface water bodies. This study involved selection and linkage of available models to be used as a tool in evaluating the effects of BMPs for control on reservoir water quality. Overall,.Linkage of BASINS/HSPF and WASP5 was applicable and found to be a powerful tool in pollutant loading estimation from the watershed and reservoir, and its use is recommended.

  • PDF

Case Study of Investment Adequacy Analysis After Implementing Master Plan on Sewerage Rehabilitation (하수도정비기본계획 시행 후의 투자적정성 분석에 관한 사례 연구)

  • Park, Kyoo-Hong;Kang, Byong-Jun;Lym, Byeong-In;Knag, Man-Ok;Park, Joo-Yang;Kim, Sung-Tae;Park, Wan-Kyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.4
    • /
    • pp.503-510
    • /
    • 2015
  • The objective of this study is to analyze the investment adequacy of the projects implemented according to the master plan on sewerage rehabilitation at Seoul. The planned and actually implemented ratio of invested money on sewage treatment plants (STPs) to sewers were compared in two temporal periods. Though the planned ratio of investment on STPs to sewers was 50:50 (in 2009-2020), the actual implemented ratio in 2009-2013 was 34:66. Until 2020, the greater investment ratio on STPs to sewers should be made considering the necessity of coping with stricter legal compliance on advanced treatment, stormwater treatment and so on. The priority of the planned and partially implemented projects among four STPs and at each STP was evaluated. Considering only the performance indicator of reduced load of BOD, T-N, T-P per the capacity of each STP facility, the performance among four STPs was shown as Jung-Rang>Tan-Cheon>Seo-Nam>Nan-Ji. The reverse order of the performance results in the past may be considered for future investment priority, but the efficiency of operation implemented at each STP, deteriorated status of each STP, investment in the past and so forth should also be considered. As for the priority of projects conducted within each STP, projects related to legal compliance (such as advanced tertiary treatment, stormwater treatment, etc.) have highest priority. Odor-related project and inhabitant-friendly facility related projects (such as building park on STPs, etc.) has lower priority than water quality related projects but interactivity with end-users of sewerage should also be important.

The Study on the Satisfaction Factors of the Support Projects for the Adjacent Residents to Multipurpose Dams (다목적 댐주변지역지원사업 고객만족에 미치는 영향 요인 연구)

  • Kim, Shang Moon;Lee, Byungchul
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.4
    • /
    • pp.335-343
    • /
    • 2013
  • Multi-purpose dams are regarded to contribute to the Korean society not only positive affects but also negative ones. Especially, negative considerations are usually prevailed around multi-purpose dam sites and their vicinities even though the Government adopted "act on dam construction and assistance, etc. to neighborhood area" in 1989 and has supported many various projects since 1990. Nevertheless, many arguments and controversies about effects of multi-purpose dams and support projects to vicinities" have happened so frequently and sometimes brought a suit against government. These situations imply that support projects are not so sufficient to fulfil peoples' expectations. Therefore, this research figured out the key factors that affected residents' satisfaction about multi-purpose dams and support projects. The results of the research are as follows: 1) 'social necessity of dams', 'rationality of the process in supporting project' and 'appropriateness of supporting project', were statistically significant to 'customer satisfaction'; 2) among these factors, 'rationality of the process in supporting project' was the most related to 'customer satisfaction': 3) 'appropriateness of supporting project', 'social necessity of dams' were also revealed as second third factors that relate to the satisfaction.

Key Risks and Success Factors on the China's Public-Private Partnerships Water Project (중국 수처리 민관협력사업 사례분석을 통한 시사점 도출: 위험 및 성공 요인 도출)

  • Choi, Jae-Ho;Lee, Seung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.134-144
    • /
    • 2010
  • In China, the enhancement of water services has become the most crucial issue confronted with the rapid urbanization and industrialization process. A huge financial gap to meet the demand for water infrastructure and need for adopting advanced operation technology precipitated the rapid growth of PPP over the last 10 years. Diverse schemes of PPP such as TOT, Divestiture, and Management Contract and Lease have been practiced. Local governments and private investors/operator have adjusted their objectives and strategies to avoid potential pitfalls behind BOT projects in China. However, current academic research outcomes do not properly reflect important issues of BOT projects or related case studies in China. This limitation has brought in the lack of assessment of important risks and success factors required for the improvement of the body of risk management. In this regard, this study uses the market analysis method to identify major schemes of PPP water projects and conducts case studies on five PPP projects to identify key risk and success factors in association with each different scheme. It is expected that the risk and success factors identified from the cases will be used as reference to Korean companies which plan to enter the Chinese water market.

Storm Water Logging Analysis and Pre-warning System Construction in Beijing City

  • Yuan, Ximin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.2200-2204
    • /
    • 2009
  • In this paper the analysis of natural cause of Beijing Storm inundation and the effect of the human activities has been taken. Flood risk can hardly be eliminated solely by projects. Pre-warning system established is an efficient measure to minimize the influence of flood. Several main functions of this system and their examples are described in the paper, such as: monitoring, forecast, scheme, warning, dynamic decision-making and information publication.

  • PDF