• Title/Summary/Keyword: Water Projects

Search Result 663, Processing Time 0.031 seconds

Study on the Layout of Water Diversion Projects Influenced by China's Macro Developing Strategies

  • Peng, Xiang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.59-66
    • /
    • 2008
  • A country's macro developing strategies will greatly impose upon its water resources allocation. Based upon the relationship between national macro developing strategies and water diversion projects layout, the paper discusses the vital influence of water diversion projects caused by China's food security and sustainable development strategy implemented in recent years, and points out that it is an inevitable choice of constructing inter-basin water diversion projects in north China in view of local water resources can't meet the demand of socio-economic development and eco-environment protection, and then recommends China's water diversion projects layout in the current and future, which attaching most importance to the South-to-North Water Diversion Project.

  • PDF

Water projects and technologies in Asia: Historical perspective

  • Hyoseop Woo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.24-24
    • /
    • 2023
  • This presentation highlights the IAHR book, recently published last April, of which the author is the editor-in-chief, on the historical water projects and traditional water technologies of international interest in the Asian region, addressing information on past water projects (mostly before the 20th century) in the regions that are technically and culturally of interest and educationally valuable. The book explores historical water projects in these regions, presenting technologies used at the time, including calculation and forecasting methods, measurement, material, labor, methodologies, and even water culture. Through this book, it is expected that the old Asian wisdom of "reviewing the old and learning the new" would be realized to a certain extent in modern planning and practice of water projects. The book comprises a lead article that the presenter authored and five Parts representing China, Japan, Korea, South Asia, and Southeast Asia, respectively, followed by an invited one from Uzbekistan. Throughout the book, it is found that historically the Asian monsoon, affecting the Indian subcontinent and Southeast and East Asian regions, induced rice cultivation. It fundamentally needs proper irrigation systems, including reservoirs (dams) and canals, water wheels, and even rain gauges. Flood risks have been more common in Asia than Europe under this climate condition, as recognized in history. To utilize and sometimes overcome these climate conditions, people built and managed many historical and grandiose water projects and invented and used localized but sophisticated water-related technologies in the Asian region.

  • PDF

A Study on the Rational Planning of Water Supply and Sewage System for Rural Village Development Projects (농촌마을종합개발사업에서 상하수도시설의 합리적 계획방향에 관한 기초적 연구)

  • Kim, Hwan-Yong
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.2
    • /
    • pp.62-71
    • /
    • 2006
  • This study on the rational planning of water supply and sewage system for rural village development projects. Present, when establishment and standard about maintenance of water supply and sewage system were not presented in rural village synthesis development projects, it is real condition that service industry is depending on presenting simple plan in basis planning phase and business enforcement step. This study wishes to present basic data so that can be planned more rationally and enforce and contribute in rural village synthesis development projects water supply and sewage system that is enforced as part of rural village synthesis development projects.

  • PDF

Optimal Sequencing of Water Supply Proiects by Dynamic Programming (동적계량법에 의한 용수공급시설의 최적화에 관한 연구)

  • 배상근;이순택
    • Water for future
    • /
    • v.14 no.2
    • /
    • pp.63-69
    • /
    • 1981
  • This Study is aimed at optimal sequencing of water supply projects for water demand from the application in water resources field of dynamic programming because a minimum present cost strategy for investment in water supply projects plays an important part of installation of some projects. In analysis, the relationships of the future water demand and numerous possible independent projects that are expected to meet water requirements up to some future data in Daegu city were used and future water demand were estimated from the exponential function method, the method used by the Water Works Bureau of Daegu City government which is a kind of geometric progression method and the mean value of these two methods. The results showed that the optimal sequencing of water supply projects using Dynamic Programming was reasonable and the changing of the estimation method of future water demand made a difference among optimal sequence of projects while the changing of annual rate of interest had influenced on present value cost only. In general, the best sequence for constructing the seven projects was the order of D-E-G-F-C-B-A, with the corresponding period for 33-38 years.

  • PDF

Current Status of Water Electrolysis Technology and Large-scale Demonstration Projects in Korea and Overseas (국내외 수전해 기술 및 대규모 실증 프로젝트 진행 현황)

  • JONGMIN BAEK;SU HYUN KIM
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.35 no.1
    • /
    • pp.14-26
    • /
    • 2024
  • Global efforts continue with the goal of transition to a "carbon neutral (net zero)" society with zero carbon emissions by 2050. For this purpose, the technology of water electrolysis is being developed, which can store electricity generated from renewable energies in large quantities and over a long period of time as hydrogen. Recently, various research and large-scale projects on 'green hydrogen', which has no carbon emissions, are being conducted. In this paper, a comparison of water electrolysis technologies was carried out and, based on data provided by the International Energy Agency (IEA), large-scale water electrolysis demonstration projects were analyzed by classifying them by technology, power supply, country and end user. It is expected that through the analysis of large-scale water electrolysis demonstration projects, research directions and road maps can be provided for the development/implementation of commercial projects in the future.

A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

New Paradigm and its Policy Framework in Decision-making on Large Dams

  • Park, Sungje
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.97-106
    • /
    • 2006
  • This study discusses two canceled dam projects, Youngwol Dam in South Korea and Two Forks Dam in Colorado of the United States. Both of them illustrate how the new paradigm applies to regional water projects because they became victims of environmental opposition in the new paradigm. While the cases have no apparent close relationships and they occurred in different decades, they offer interesting comparisons. They were basically struggles between water development coalitions and environmental protection coalitions on regional water conflicts. The two proposed projects brought about fierce debates on large dam as they embraced a wide-range of environmental, social, and political issues rather than construction of dams themselves. Huge anti-dam oppositions scrapped them at the cost of nearly ten years for decision-makings and enormous financial resources for feasibility studies respectively. It identifies who the policy actors were, what the policy strategies were, and how the water policies evolved in both countries. The decision-makings on the two projects appeared at first glance to be made under formal institutional frameworks, but in actuality, they relied significantly on decisions of the two important political actors. The Korean society began to learn negotiation and cooperation approaches to solve the water conflict by establishing the Joint Task Force Team on Youngwol project in 1999. The team is recognized as a new conflict resolution method in South Korea because a diverse of stakeholder interests voluntarily participated in the decision-making process and discussed water issues directly. Even though the projects resulted in futile fruits in each country, they illustrate the images of the new paradigm that significantly affected in formulating regional water policies in South Korea and the United States.

  • PDF

Study on the Evaluation Criteria of Environment Assessment for the Various Type of Small-Scale Development Projects in the Riparian Areas (수변지역 소규모 개발사업의 유형별 환경평가 기준에 관한 연구)

  • Joo, Yong-Joon;Sagong, Hee
    • Journal of Wetlands Research
    • /
    • v.18 no.3
    • /
    • pp.218-225
    • /
    • 2016
  • Various strategies and management plans have been established in order to conserve water quality as well as ecosystem, prevent deterioration of scenic area, and more importantly, retain drinking water securely. However, due to the introduction of numerous small-scale development projects on the waterside area outside protection area of source water and reparian area, river water quality and landscape are severely deteriorated. In this study, We analyzed the expected environmental impacts on the ecosystem, topograph, geology, landscape, water quality according to development type, and assigned different environmental points to each development type depend on environmental impacts, which is able to divide small-scale development project into three categories such as projects with rigorous review, projects with general review and projects with simple review. Finally, we suggested the appraisal basement is to avoid or minimize the expected environment impacts of the small-scale development projects in riparian areas so that make them sustainable development by reasonable restriction.

Critical Success Factors on PPP Water Project in a Developing Country: Evidence from Indonesia

  • SURACHMAN, Eko Nur;HANDAYANI, Dian;SUHENDRA, Maman;PRABOWO, Sakti
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.10
    • /
    • pp.1071-1080
    • /
    • 2020
  • This study aims to explore the critical success factors of the Water Public-Private Partnership (PPP) Projects in developing country with evidence from Indonesia. We all know that water is a basic need and therefore it becomes very important for the governments especially in the developing countries to develop and formulate a comprehensive water policy to deliver and manage the water services in the most appropriate manner as well tackle several challenges such as budget and project efficiency. In this context, PPP is a promising scheme to address the water problems, hence it becomes important to reveal the success factors of water PPP projects. An Analytic Hierarchy Process (AHP) questionnaire built from delphi methods is used to capture the perception of the relevant stakeholders in relation to the success factors. The results of this study show the most critical success factors in PPP water projects is the support and acceptance of the stakeholders from the community, whereas the private and public entities are the the second and third important factors. These findings contribute to the success of the PPP stakeholders by enhancing the policy-making decision process and by executing the water policies to support the development of PPP in the Water Sector.