• Title/Summary/Keyword: Water Hammer

Search Result 165, Processing Time 0.023 seconds

Trouble and Measure Owing to Water-hammer in Small Hydropower Turbine System Of Waterpipe (수도관로 소수력발전설비에 수격작용으로 인한 고장대책)

  • Lee, Hyoung-Mook;Kim, Ki-Won;Byun, Il-Hwan;Hong, Jeong-Jo;Lee, Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.671-672
    • /
    • 2006
  • Recently the development of small hydropower generation with using water pipes is revitalized by the water works facilities. However, when the tubine generator is in case of emergency stop by the internal and external accidents, it causes water hammer in water pipes and suspension of water supply. To prevent these problems of small hydropower generator, we has analyzed water supply patterns, installation position and water pipe systems.

  • PDF

Study on a Multi-pipe Water Hammer Phenomenon by using CFD of Rapid Valve Closing (전산유체해석(CFD)을 이용한 밸브의 급폐쇄에 따른 다중 배관 수격 현상에 관한 연구)

  • Park, No-Suk;Kim, Seong-Su;Kang, Moon-Sun;Choi, Jong-Woong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.4
    • /
    • pp.479-487
    • /
    • 2013
  • This study was to investigate characteristics for the pressure wave propagation and the maximum pressure near a rapid closure valve which was installed the end of multi piping network. The multi piping network consists of one inlet and three outlet with straight pipes. The diameter of the pipes including the valve was 100 mm, 80 mm, 80 mm respectively. The valve was rapidly closed with the instantaneous time which was 0.023s in the level for the water hammer. For the simulation, the influence of the pipe thickness and deformation due to pressure-wave-propagation was not considered. CFD was conducted under the following condition : the initial pressure was 1bar in the inlet and the mass flow rate was 7.83 kg/s in the outlet(the velocity in the pipe with 100 mm diameter was 1 m/s). As the valve have conditions that were status with and without fluid flow in the pipe after valve closing, the maximum pressure change and the frequency analysis were examined. As the results, the case that was status with fluid flow appeared the higher maximum pressure than another's, the maximum frequency band was about 10 ~ 11 Hz.

Trouble and Measure Owing to Water-hammer In Small Hydropower Turbine System Of Waterpipe (수도관로 소수력발전설비에서의 수격작용으로 인한 고장대책)

  • Lee, Hyoung-Mook;Hong, Jeong-Jo;Lee, Eun-Woong;Kim, Kyung-Yup
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.61-64
    • /
    • 2006
  • Recently the development of small hydropower generation with using water pipes is revitalized by the water works facilities. However, when the tubine generator is in case of emergency stop by the internal and external accidents, it causes water hammer in water pipes and suspension of water supply. To prevent these problems of small hydropower generator, we has analyzed water supply patterns, installation position and water pipe systems.

  • PDF

A Prediction of Engineering Properties of Ulsan Sedimentary Rocks with Schmidt Hammer Rebound Number (Schmidt hammer 반발지수로 울산지역 퇴적암의 공학적 특성을 추정하기 위한 연구)

  • Min, Tuk-Ki;Moon, Jong-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.10
    • /
    • pp.139-150
    • /
    • 2006
  • A study has been made of the Schmidt hammer rebound test for the estimation of engineering and physical characteristics of sedimentary rocks. As there is no universal formular for the estimation of rock strength due to geological conditions, in this study only sedimentary rocks are adopted to testing. The aim of study is to make the information more meaningful and useful for engineers and contractors by providing rapid, cheap and easy method. The obtained parameters were correlated and regression equations were established among Schmidt hammer rebound number, uniaxial compressive strength, tangent Young's modulus, indirect tensile stress, water absorption and porosity of rocks with high coefficients of correlation with each other.

A Safety Plan for the Pumping Station by Hydraulic Transient Analysis and Demonstration (과도수리현상 해석과 실증을 통한 펌프장 안정성 확보방안)

  • Ra, Beyong-pil;Kim, Jin-min;Lee, Dong-keun;Park, Jong-ho;Kim, Kyung-yup
    • The KSFM Journal of Fluid Machinery
    • /
    • v.8 no.5 s.32
    • /
    • pp.22-28
    • /
    • 2005
  • As the water supply facilities are recently getting larger, the domestic waterworks become multi-regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment plant and water supply/distribution facilities. Although the pumping stations and the pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. In this paper, the intake pumping station is guaranteed by both the computer simulation and the field test analysis. This study is contributed to the safe operation program for the pumping station in which results of the adjustment on the safety plan of the pumping station, the air valve and the valve closing time.

The Plan of Safety for Pump Station through Hydraulic Transient Analysis & Demonstration (과도수리현상 해석과 실증을 통한 펌프장 안정성 확보방안)

  • Ra, Beyong-pil;Kim, Jin-man;Park, Jong-ho;Kim, Kyung-yup
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.199-207
    • /
    • 2004
  • Water supply facilities are recently getting larger according as domestic waterworks become multi regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment station and water supply & distribution facilities. Although pumping stations and pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. As a result of this study, a pumping station is guaranteed by the computer simulation and field test analysis. Therefore these are contributed safety operation in pumping station through adjustment of the pumping station safety plan, air valve and valve closing time.

  • PDF

Experimental Study on Performance Characteristics of High Speed Air Valve for Water Works (급수용 급속공기밸브의 성능특성에 관한 실험적 연구)

  • Lee, Sun Kon;Kaong, Sae Ho;Yang, Cheol Soo;Woo, Chang Ki
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.1-6
    • /
    • 2014
  • When the fluid energy convert into kinetic energy due to water hammer, the propagation velocity of pressure wave appear. The propagation velocity of pressure wave(1050 m/s) of very fast could be damage to the pipeline system. If the occurrence of water hammer is due to down-pressure, the faster the air exhaust or supply device is needed. it is high Speed Air Valve. In this paper, Each 3.12, 3.13, 3.72, $3.74kg/cm^2$ pipeline pressure were setting, and then executed pressure rapid drop for obtaining a high Speed Air Valve Operating time and pressure change data. the result was that pipe line pressure stabilization time were each 0.98, 1, 1.22, 1.25 sec. In other words, that pressure drop experimental results pipe line pressure was equal to atmospheric pressure without negative pressure After about one second. The study result would be useful to pipe line system stability design because this data could be foresee pressure stabilization time.

Examination of Cavitation-Induced Surface Erosion Pitting of a Mechanical Heart Valve Using a Solenoid-Actuated Apparatus

  • Lee, Hwan-Sung;Hwang, Sung-Won;Katsuyuki Yamamoto
    • Journal of Mechanical Science and Technology
    • /
    • v.17 no.9
    • /
    • pp.1339-1348
    • /
    • 2003
  • Several factors, including peak dp/dt of the ventricular pressure and maximum closing velocity of leaflet have been studied as indices of the cavitation threshold. In the present study, just before closing velocity of the leaflet has been studied as indices of the cavitation threshold, and cavitation erosion on the surface of a mechanical valve was examined by focusing on squeeze flow and the water hammer phenomenon during the closing period of the valve. A simple solenoid-actuated test device that can directly control the valve closing velocity was developed, and opening-closing tests of 3,000 and 40,000 cycles were performed at various closing velocities. There was a closing velocity threshold to occur erosion pitting of valve surface, and its value was about 0.4 m/s in this study. Cavitation-induced erosion pits were observed only in regions where squeeze flow occurred immediately before valve closure On the other hand, the number of the pits was found to be closely related to an area of water hammer-induced pressure wave below the critical pressure defined by water vapor pressure. Therefore, it was concluded that cavitation is initiated and augmented by the two pressure drops due to squeeze flow and water hammer phenomenon, respectively.

Numerical Analysis of Water Hammer in Condenser Cooling Water Systems (콘덴서 냉각수 계통내의 수격현상 에 관한 수치해석)

  • 장효환;정회범
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.9 no.5
    • /
    • pp.638-646
    • /
    • 1985
  • Water hammering in nuclear or thermal power plant condenser cooling water systems in mathematically modeled and numerically analyzed based on the method of characteristics. Effects of variations of the discharge valve operating condition and the system geometry on the hydraulic transients are investigated for the cases when all or one of four pumps are tripped accidently due to loss of offisite power. Effects of ocean waves and tides on the steady-state and the transient operations are also studied. Water column separation in taken into account whenever necessary by means of a simplified physical model.