The expansion of indications for lung transplantation, the growth of the waiting list, and donor shortages are increasing the waiting list mortality rate in Korea. The current lung allocation system in Korea is based mainly on urgency, but outcomes should also be considered to avoid futile transplantation. This review describes the current status of, and issues with, the lung allocation system in Korea including donors, the waiting list, and transplant outcomes in the context of an aging society, in which the frequency of end-stage pulmonary disease is increasing.
Purpose: The purpose of this study was to explore the experience of patients on the waiting list for kidney retransplantation. Methods: The data were collected by individual in-depth interviews of nine patients who were dialyzed after primary kidney graft dysfunction and were waiting for deceased donor kidney retransplantation. All interviews were audio-taped and transcribed, and were analyzed using a phenomenological method. Results: The findings included 5 theme clusters and 13 sub-themes. The 5 clusters were 'Diagnosed with chronic renal failure and dialysis: Broken daily life and crisis', 'Kidney transplantation: The only way to escape from dialysis', 'Kidney graft failure: Inevitable moving backward to hemodialysis', 'Self-management of re-dialysis patients: Growth through pain', and 'The waiting for kidney retransplantation: To try again in the hope of getting a new life'. Conclusion: This study provides a deep understanding of patients with dialysis who are waiting for deceased donor kidney retransplantation. On the basis of the findings of this study, health professionals can provide customized information and develop effective nursing interventions to improve the self-management of these patients.
This study aimed to evaluate how universal design principles are embodied in the Public Service Center. It will be used for planning the basic materials of the interior environmental design for Public Service Center facilities and for developing ways to improve interior environments in order for them to be conveniently used. In studying a method, we conducted an Universal Design check list to evaluate interior environment, targeting five Public Service Center facilities located in Gwangju Metropolitan city. This study investigated the Universal Design suitability of center interior Public Service Center on the basis of the tools for Universal Design check list which was composed of supportive design, adaptable design, communicability, safety-oriented design, and accessible design. Through theoretically considering the services of Gwangju's old city hall public service center, which got divided into common space, public service space, waiting space and informative material space. Evaluation on universal design application level showed that those with best universal design application are supportiveness and safety in public service space, communication efficacy and safety in waiting space and safety and accessibility in informative material space and acceptability in waiting space had the lowest application level.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.10a
/
pp.681-683
/
2016
Recently, sharing economy is getting the attention of the public. So this phenomenon to share their goods, home, gifts, etc. in various fields has been increased. Typically when traveling away from home to host as "Airbnb", the share house to share their homes are traded most actively. Through a share house host can make money using house empty, customers can take advantage of the hostel while traveling at low prices. The existing share house system must ensure that every time they empty the house Customers, host had the inconvenience of having to wait for the application of the tenant customers. To solve this problem and to implement a service platform based on the waiting list. Through this platform, customers will be able to eliminate the inconvenience of having to find the house every time you want to apply for a tenant waiting to get home, give the order to wait.
Recently a number of large discount store and those of its users was increasing. The purpose of this study is to investigate the tendency of impulse buying and analyzes factors which influence impulse buying. The data had been collected from questionaries with 474 consumers who visit large discount store. The major statistical methods used for data analysis are frequency, percentile, mean, t-test, multiple regression analysis, one-way ANOVA, and Duncans multiple range test utilizing SPSS Win pc+program. The results of this study are as follows : 1. The four different kind of impulse buying is measured. The overall level of impulse buying is 2.76. Suggestion impulse buying(M=3.19) is the highest, and the lowest is pure impulse buying(M=2.66). 2. In the area of demographic variables is significantly different in the age of twenties and thirties(p<.05). A visit frequency and membership. In the area of in-store variables is significantly different by all factors at impulse buying except waiting time. Especially, point-of-purchase(POP) advertisement and discount sale are very important variables. A visit frequency and membership are significantly different in the area of consumer-related variables. 3. Waiting time, a visit frequency, a POP advertisement, and a discount sale have the positive effects on overall impulse buying. Pure impulse buying is influenced by shopping list, POP advertisement and a stores atmospher. Buying companion, membership, kind of store and waiting time have the effect on reminder impulse buying. Suggestion impulse buying is influenced by school career, shopping list and POP advertisement. Planned impulse buying is influenced by sex, POP advertisement, buying companion and discount sale.
Lung transplantation is considered a viable treatment option for patients with end-stage lung disease. Recent decades have seen a gradual increase in the number of lung transplantation patients worldwide, and in South Korea, the case number has increased at least 3-fold during the last decade. Furthermore, the waiting list time is becoming longer, and more elderly patients (>65 years) are undergoing lung transplantation; that is, the patients placed on the waiting list are older and sicker than in the past. Hence, proper management during the pre-transplantation period, as well as careful selection of candidates, is a key factor for transplant success and patient survival. Although referring and transplant centers should address many issues, the main areas of focus should be the timing of referral, nutrition, pulmonary rehabilitation, critical care (including mechanical ventilation and extracorporeal membrane oxygenation), psychological support, and the management of preexisting comorbid conditions (coronary artery disease, diabetes mellitus, gastroesophageal reflux disease, osteoporosis, malignancy, viral infections, and chronic infections). In this context, the present article reviews and summarizes the pre-transplantation management strategies for adult patients listed for lung transplantation.
Delayed access to surgery may lead to deterioration in the patient condition, poor clinical outcomes, increase in the probability of emergency admission, or even death. The purpose of this work is to decide the number of patients selected from a waiting list and to schedule them in accordance with the operating room capacity in the next period. We formulate the problem as an infinite horizon Markov Decision Process (MDP), which attempts to strike a balance between the patient waiting times and overtime works. Structural properties of the proposed model are investigated to facilitate the solution procedure. The proposed procedure modifies the conventional value iteration method along with the binary search technique. An example of the optimal policy is provided, and computational results are given to show that the proposed procedure improves computational efficiency.
Korean Journal of Construction Engineering and Management
/
v.14
no.2
/
pp.87-95
/
2013
The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.
The aim of this study was to examine whether the guideline by the Ministry of Environment (ME) successfully and appropriately applied the IUCN Red List criteria at regional level and the rare and endangered national list considered eligible. A certain number of vascular plants, which are widely distributed in the world or in east Asia, deemed to be ineligible for assessment at a regional level as Not Applicable category (NA), because it occurs at very low numbers in South Korea. Among 377 vascular plant taxa evaluated by the ME, NA included 238 species, which represented 63.1%. The number of synonymized species or illegitimate name species were 13 species, which accounted for 3.4%. 21 species (9.3%) were threatened at global level and 103 species were possibly candidates species list for Red List assessments at regional level in the near future. The proportion of NA or waiting list was 66.6% among the list assessed by the ME. The most common errors involved incorrectly application of species extinction in case of population extinction in South Korea to the assessment and provided incorrect interpretation of the Red List criteria at regional level. The most assessments proposed by ME were not backed up without quantitative data quality, justifications, and sources. It is suggested that the risk of extinction should be reassessed at least in the Korean peninsula within the light of their overall distribution including far eastern Russia and North eastern China in north and for Japan and Taiwan in south for regional assessment. The results obtained here using the IUCN criteria at regional level showed that the list proposed by the ME produced an overestimation of the number of threatened vascular plants. Also, the misapplication of the term 'species extinction' for regional assessment was open to some degree of subjectivity and misinterpretation.
Journal of the Institute of Electronics Engineers of Korea CI
/
v.40
no.6
/
pp.9-21
/
2003
In this paper, we propose a new submesh allocation scheme which improves the performance of multicomputer systems. The key idea of this allocation scheme is to reduce waiting time of task by minimizing the submesh search time and the submesh a]location delay caused by external fragmentation. This scheme reduces the submesh search time by classifying independent free submeshes according to their types (square, horizontal rectangle, vertical rectangle) and searching a best-fit submesh from the classified free submesh list. If a submesh allocation delay occurs due to external fragmentation, the proposed scheme relocates tasks, executing In allocated submeshes, to another free submeshes and compacts processor fragmentation. This results in reducing the submesh allocation delay. Through simulation, we show that it is more effective to reduce the submesh allocation delay due to external fragmentation than reducing the submesh search time with respect to the waiting time of task. We also show that the proposed strategy improves the performance compared to previous strategies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.