• Title/Summary/Keyword: WATERSHED

Search Result 3,666, Processing Time 0.03 seconds

An Analysis of the Rainfall-Runoff of Natural Watershed Using the Hydraulic Routing Method (수리학적 추적 방법을 이용한 자연하천의 강우유출 해석)

  • Kwon, Hyun-Han;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.7 s.156
    • /
    • pp.555-564
    • /
    • 2005
  • In this study, a simple rainfall-runoff model was proposed by using the hydraulic routing model that requires relatively few parameters. The parameters of this model were estimated by the watershed characteristics data, and were applied to the Soyang watershed and Ui stream watershed by using the kinematic wave for overland flow and dynamic wave routing for channel routing. In order to demonstrate validity, the proposed approach was compared to the HEC-1 model for the Soyang watershed. As the results of modeling have shown, the hydraulic model shows reasonable results similar to that of the HEC-1 model. This model also represents good results for the Ui stream watershed. Hence, even if this model is a simple rainfall-runoff model using general methodology, it is competitive to the natural watershed. However, it is still difficult to estimate the roughness coefficient and the catchment width, and therefore this model is in need of such supplements.

Pollutant Load Characteristics of a Rural Watershed of Juam Lake (주암호 농촌 소유역 오염부하특성)

  • Han, Kuk-Heon;Yoon, Kwang-Sik;Jung, Jae-Woon;Yoon, Suk-Gun;Kim, Young-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.3
    • /
    • pp.77-86
    • /
    • 2005
  • A monitoring study has been conducted to identify hydrologic conditions, water quality and nutrient loading characteristics of small watershed in Juam Lake. Climate data of the watershed were collected; flow rate was measured and water quality sampling was conducted at the watershed outlet for this study. Water quality data revealed that T-P concentrations meet I grade of lake water quality standard during non-storm period, but degraded up to II-III grade of lake water quality standard during storm period. The observed T-N concentrations always exceeded lake water quality standard. Therefore, T-P was identified as limiting chemical constituent for eutrophication of Juam Lake. T-P concentration of non-storm period also revealed that point source pollution is not serious in the watershed. Three year monitoring results showed that the observed T-N losses were $10.85\~18.88$ kg/ha and T-P losses were $0.028\~0.323$ kg/ha during six month (Mar. - Oct.), respectively. Major portion of runoff amount discharged by a few storm events a year and nutrient load showed apparent seasonal variation. Huge runoff amounts were generated by intense storms, which make application of water treatment or detention facilities ineffective. Monitoring results confirmed that water quality improvement by abating nonpoint source pollution in rural watershed of monsoon climate should be focused on source control. T-P losses from paddy field seemed to consist of significant amount of total load from study watershed. Therefore, management of drainage from paddy field is considered to be important for preventing algal blooming problem in Juam Lake.

GIS-Based Design Flood Estimation of Ungauged Watershed (논문 - GIS기반의 미계측 유역 설계홍수량 산정)

  • Hong, Seong-Min;Jung, In-Kyun;Park, Jong-Yoon;Lee, Mi-Seon;Kim, Seong-Joon
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.87-100
    • /
    • 2011
  • This study is to delineate the watershed hydrological parameters such as area, slope, rain gauge weight, NRCS-CN and time of concentration (Tc) by using the Geographic Information Sytem (GIS) technique, and estimation of design flood for an ungauged watershed. Especially, we attempted to determine the Tc of ungauged watershed and develop simple program using the cell-based algorithm to calculates upstream or downstream flow time along a flow path for each cell. For a $19km^2$ watershed of tributary of Nakdong river (Seupmoon), the parameters including flow direction, flow accumulation, watershed boundary, stream network and Tc map were extracted from 30m Agreeburn DEM (Digital Elevation Model) and landcover map. And NRCS-CN was extracted from 30m landcover map and soil map. Design rainfall estimation for two rainfall gauge which are Sunsan and Jangcheon using FARD2006 that developed by National Institute for Disaster Prevention (NIDP). Using the parameters as input data of HEC-l model, the design flood was estimated by applying Clark unit hydrograph method. The results showed that the design flood of 50 year frequency of this study was $8m^3/sec$ less than that of the previous fundamental plan in 1994. The value difference came from the different application of watershed parameter, different rainfall distribution (Huff quartile vs. Mononobe) and critical durations. We could infer that the GIS-based parameter preparation is more reasonable than the previous hand-made extraction of watershed parameters.

  • PDF

A Study on an Extraction of the Geometric Characteristics of the Pyongchang River basin by Using Geographic Information System (GIS를 활용한 유역의 하천 형태학적 특성 추출에 관한 연구)

  • Hahm, Chang-Hahk
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.4 no.1 s.6
    • /
    • pp.115-119
    • /
    • 1996
  • odel). One of important tasks for hydrological analysis is the division of watershed. It can be an essential factor amThe main objective of this study is to extract of the geometric characteristics of the Pyongchang River basin, headwaters of the South Ran River. A GIS is capable of extracting various hydrological factors from DEM(digital elevation mong various geometric characteristics of watershed. In this study, watershed itself and other geometric factors of watershed are extracted from DEM by using a GIS technique. The manual process of tasks to obtain geometric characteristics of watershed is automated. by using the function of ARC/INFO software as a GIS package. Scanned data is used for this study and it is converted to DEM data Various forms of representation of spatial data are handled in main modules and a GRID module of ARC/INFO. A GRID module is used on a stream in order to define watershed boundary, so it would be possible to obtain the watersheds. Also, a flowdirection, stream networks and others are generated. The results show that GIS can aid watershed management and research and surveillance. Also the geometric characteristics as parameters of watershed can be quantified by a using GIS technique. Resonable results can be obtained as compared with conventional graphic methods.

  • PDF

A Study on Estimated Pollutant Delivery Load for the Basic Plan of TPLC (수질오염총량관리계획 수립을 위한 유달부하량 추정방법 연구)

  • Hwang, Ha Sun;Rhee, Han Pil;Ahn, Ki Hong;Park, Ji Hyung;Kim, Yong Seok;Lee, Sung Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.375-383
    • /
    • 2016
  • Total Pollution Load Control (TPLC) calculates and manages the allowable pollutant load that is discharged from the watershed, which can meet the water quality target. Delivery Ratio (DR) is generally used for predicting the variation of pollutant mass balance between the pollutants discharged from the watershed and a certain point in the stream, and it is very important for estimation of accurate allowable pollutant load. The concept of DR in TPLC is different from prevalent DR, because DR in TPLC includes both the discharge of pollutants from the watershed and the delivery mechanism. Therefore, DR in TPLC should be estimated by using a proper and unified methodology. The appropriate method and equation for estimation of DR in TPLC was developed through the review of various methodologies, and the applicability of the equation was evaluated in a study area (Geumho A). Determination coefficients (R2) of regression were shown to be relatively high (BOD 0.71~0.87, T-N 0.86~0.90, T-P 0.62~0.69). Applicability of the developed methodology and equations was evaluated as appropriate for TPLC, and it is suggested.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds (부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Kim, Eunkyoung;Ryu, Jichul;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

Developing Suspended Sediment Delivery Ratio in the Lake Imha Watershed (임하호유역 유사유달공식 개발)

  • Jeon, Ji-Hong;Choi, Donghyuk;Kim, Jae-Kwon;Kim, Taedong
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.6
    • /
    • pp.744-753
    • /
    • 2017
  • The sediment delivery ratio (SDR) is widely used to estimate sediment loads by multiplying soil loss through the Revised Universal Equation (RUSLE). In this study, the SDR equation was developed for the Lake Imha watershed using soil loss calculated by RUSLE and sediment loads by the calibrated Hydrological Simulation. Program Fortran (HSPF). The ratio of watershed relief and channel length ($R_f/L_{ch}$), the ratio of watershed relief and watershed length ($R_f/L_b$), curve number (CN), area (A), and channel slope ($SLP_{ch}$) demonstrated strong correlations with SDR. SDR equations were developed by a combination of subwatershed parameters by referring to the correlation analysis. The area based power functional SDR developed in this study showed significant errors at the point right after entering major tributaries, because SDR was unrealistically reduced when the watershed area increased significantly. The $SLP_{ch}$-based power functional SDR also showed extraordinary values when the channel slope was gradual. The SDR equation that showed the highest value of the coefficient of determination also presented unrealistic changes in the sediment loads within a relatively short river distance. The SDR equation $SDR=0.0003A^{0.198}R_f/L{_w}^{1.167}$ was recommended for application to the Lake Imha watershed. Using this equation, sediment loads at the outlet of the Lake Imha watershed were calculated, and the HSPF parameters related to sediment in the uncalibrated subwatersheds were determined by referring to the sediment loads calculated with the SDR equation.

Integrated Watershed Modeling Under Uncertainty (불확실성을 고려한 통합유역모델링)

  • Ham, Jong-Hwa;Yoon, Chun-Gyoung;Loucks, Daniel P.
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.4
    • /
    • pp.13-22
    • /
    • 2007
  • The uncertainty in water quality model predictions is inevitably high due to natural stochasticity, model uncertainty, and parameter uncertainty. An integrated modeling system under uncertainty was described and demonstrated for use in watershed management and receiving-water quality prediction. A watershed model (HSPF), a receiving water quality model (WASP), and a wetland model (NPS-WET) were incorporated into an integrated modeling system (modified-BASINS) and applied to the Hwaseong Reservoir watershed. Reservoir water quality was predicted using the calibrated integrated modeling system, and the deterministic integrated modeling output was useful for estimating mean water quality given future watershed conditions and assessing the spatial distribution of pollutant loads. A Monte Carlo simulation was used to investigate the effect of various uncertainties on output prediction. Without pollution control measures in the watershed, the concentrations of total nitrogen (T-N) and total phosphorous (T-P) in the Hwaseong Reservoir, considering uncertainty, would be less than about 4.8 and 0.26 mg 4.8 and 0.26 mg $L^{-1}$, respectively, with 95% confidence. The effects of two watershed management practices, a wastewater treatment plant (WWTP) and a constructed wetland (WETLAND), were evaluated. The combined scenario (WWTP + WETLAND) was the most effective at improving reservoir water quality, bringing concentrations of T-N and T-P in the Hwaseong Reservoir to less than 3.54 and 0.15 mg ${L^{-1}$, 26.7 and 42.9% improvements, respectively, with 95% confidence. Overall, the Monte Carlo simulation in the integrated modeling system was practical for estimating uncertainty and reliable in water quality prediction. The approach described here may allow decisions to be made based on probability and level of risk, and its application is recommended.

A Method for the Increasing Efficiency of the Watershed Based Image Segmentation using Haar Wavelet Transform (Haar 웨이블릿 변환을 사용한 Watershed 기반 영상 분할의 효율성 증대를 위한 기법)

  • 김종배;김항준
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.40 no.2
    • /
    • pp.1-10
    • /
    • 2003
  • This paper presents an efficient method for image segmentation based on a multiresolution application of a wavelet transform and watershed segmentation algorithm. The procedure toward complete segmentation consists of four steps: pyramid representation, image segmentation, region merging and region projection. First, pyramid representation creates multiresolution images using a wavelet transform. Second, image segmentation segments the lowest-resolution image of the pyramid using a watershed segmentation algorithm. Third, region merging merges the segmented regions using the third-order moment values of the wavelet coefficients. Finally, the segmented low-resolution image with label is projected into a full-resolution image (original image) by inverse wavelet transform. Experimental results of the presented method can be applied to the segmentation of noise or degraded images as well as reduce over-segmentation.

A study on the Watershed Auto-Delineation of Low Topographic Relief Landscape Using Topogrid (Topogrid를 이용한 준평야지의 유역자동추출에 관한 연구)

  • 김동인;이근상;이환주;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.17 no.3
    • /
    • pp.245-256
    • /
    • 1999
  • Watershed delineation is the process of tracing surface water flow across a landscape to identify hydrologic basins. Manual and automated techniques have been developed to trace surface waters and locate watersheds on a variety of landscape. Low topographic relief landscapes, however, are particulary problematic for automated watershed delineation techniques. Therefore, this study aims at focusing the watershed delineation algorithm of low topographic relief landscape. By using topogrid, which manages enforcement drainage algorithms and incorporates topographic data into stream data, this study delineates watershed boundary in low relief landscape. Based on this research, in a low topographic relief landscape, enforcement drainage algorithms using topogrid generate better source grid to delineate watershed boundary than using only TIN. Also, comparing automated watershed delineation which incorporates contours and elevations into stream data with manual watershed delineation, we can know that the incorporation of both elevation and stream data generate more effective results.

  • PDF