• Title/Summary/Keyword: W project

Search Result 412, Processing Time 0.024 seconds

A Study on Feasibility Analysis of Sewer Rehabilitation (하수관거 정비사업의 타당성 분석에 관한 연구)

  • Han, Ihnsup;Chang, Daehwan;Woo, Byungha;Lim, Chulhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.1
    • /
    • pp.89-96
    • /
    • 2009
  • Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.

Performance of a Prototype Sector Chamber of the PLS Storage Ring (포항 가속기 저장링 초도품 진공챔버에 대한 실험 결과)

  • Park, C.D.;Han, Y.J.;Kim, H.J.;Youn, H.S.;Choi, W.C.
    • Journal of the Korean Vacuum Society
    • /
    • v.1 no.3
    • /
    • pp.336-340
    • /
    • 1992
  • 포항가속기 저장링 진공시스템의 성능을 예견하기 위하여, 초도품 진공 챔버를 제 작, 조립 및 테스트를 하였다. 비휘발성 흡착펌프와 이온펌프로 구성되어 있는 다섯대의 혼 합펌프와 한 대의 터보펌프를 사용하였다. 그 결과 낮은 10-10Torr을 얻음으로서 설계된 진 공도를 성취하였다.

  • PDF

The Effect of Ambiguity and User Participation on S/W Project Performance (모호성과 사용자 참여가 S/W 프로젝트 성과에 미치는 영향)

  • Hong Myung-Hon
    • Proceedings of the KAIS Fall Conference
    • /
    • 2004.11a
    • /
    • pp.240-242
    • /
    • 2004
  • S/W 개발 프로젝트는 실패 위험이 매우 높다. 중요한 실패 원인 중의 하나는 업무 모호성이며, 이를 해결하기 위해 사용자를 지속적으로 참여시키고 있다. 이 연구의 목적은 업무의 모호성과 사용자참여가 프로젝트 성과에 미치는 영향을 파악하는 것이다. 기존 문헌들로부터 업무 모호성, 사용자 참여, 프로젝트 성과에 관한 변수들의 관계를 찾아내어 연구 모델과 가설을 제시한다.

  • PDF

A Revitalize Rural Hub Project in Hwayang-eup by Introducing the Concept of Place Marketing (장소마케팅 개념을 도입한 화양읍 농촌중심지 활성화 사업 계획)

  • Park, ji-Hwan;Kim, Tae-Gu;Oh, Chang-Song
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.119-130
    • /
    • 2019
  • In a situation in which rural areas are declining, local governments are seeking to revitalize areas by place marketing. Place marketing, defined by various efforts to promote the image of a place, has been used as an economic tool. As a result, the image has been over-promoted and marketing has been driven in a perfunctory manner, so individual residents' lives and experiences have been ignored. Thus, in addition to the traditional types of cultural place marketing and economic place marketing, this study established a 'project for rural revitalization of Hwayang-eup' so that it could be applied to political place marketing aimed at inducing internal investment and improving the welfare of local residents. To implement this project, the concept was set up as building network organization, sustainable development and symbiotic relationship, and various H/W and S/W plans were developed. First of all, in terms of political place marketing, the Hwaeyang Oulim Center was constructed to strengthen the capacity of local autonomous organizations. In terms of cultural place marketing, we explored cultural resources at the village level and created a small community space. In terms of economic place marketing, the landscape around the main street and the township was reorganized to create a cultural business space for urban and rural exchanges. The reinterpretation of place marketing seen through this project was first, it was more process-oriented than results, second, it was important to induce the community-participating village-making project, and finally, the role of experts was important to expand the community movement.

Clinical Observation of Western Medical Treatment and Acupuncture Treatment on Frozen Shoulder Patients (유착성 관절낭염 치료에 있어서 한방 치료와 양방 치료의 임상적 고찰 - 동서협진 모델 개발을 위한 기초 연구를 중심으로 -)

  • Nam, Dong-Woo;Jung, In-Tae;Kim, Joo-Hee;Park, You-Seon;Lim, Sabina;Lee, Doo-Ik;Lee, Jae-Dong;Lee, Yun-Ho;Choi, Do-Young
    • Journal of Acupuncture Research
    • /
    • v.23 no.5
    • /
    • pp.177-185
    • /
    • 2006
  • Objectives : To observe the effect of acupuncture treatment and western medical treatment on frozen shoulder patients. Methods : 39 voluntary patients were randomly assigned to the Eastern treatment group(E group, n=22) and the Western treatment group(W group, n=17). The E group received acupuncture treatment on LI15, TE14, GB21 and Master Dong's acupuncture points, Shin-gwan and Gyun-joong, twice a week for 4 weeks. The W group received suprascapular nerve block, subacromial injection and trigger point injection, twice a week for 4 weeks. Both groups were instructed to practice self exercise during their daily lives. Evaluations were made before treatment and after treatment using Constant Shoulder Assessment(CSA), Shoulder Pain and Disability Index(SPADI) and the patient's satisfaction concerning the treatment was measured by Visual Analogue Scale(VAS). The obtained data were analyzed and compared. Results : The E group showed significant improvement(p<0.05) according to the CSA and SPADI. The patient's satisfaction scored 5.67 on a scale of 10. The W group showed significant improvement(p<0.05) according to the CSA and SPADI. The patient's satisfaction scored 7.73. But the difference between the two groups were insignificant according to CSA and SPADI. Conclusion : Both acupuncture and nerve block treatment significantly improved frozen shoulder. But the difference of the two treatments was insignificant.

  • PDF

A study on improvement Plan of the Rural village Remodelling -Focused on Korean and German Rural Villages - (농촌마을 리모델링 개선방안에 관한 연구 -한국과 독일의 농촌마을 사례연구를 통해서-)

  • Do, Hyun-Hak
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.1
    • /
    • pp.35-44
    • /
    • 2015
  • This study is regarding Rural village renovation project that improve the poor residential environment of backward rural district in Korea and the quality of life of the rural area residents. Especially, by comparing the Kyungbuk, Yeungju, Juchi village's case which was progressed by MAFRA (Ministry of Agriculture, Food and Rural Affairs) in 2014 for the demonstration project with the successful case MELAP(Model project on the Effective Utilization of Rural Land through the activation of internal potential element) which is one of the Rural area Development Program in German Federal Ministry of Baden-$W{\ddot{u}}rttemberg$, this essay attempts to suggest the improvement Plan of Rural village renovation project which will be developed forward.

A Study on PMO for Betterment of Project Success (프로젝트 성공 촉진을 위한 프로젝트관리조직(PMO)에 관한 연구)

  • Kim, TaeWoo;Lee, SeoukJoo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1425-1428
    • /
    • 2012
  • PMO(Project Management Office)는 프로젝트 수행을 일관성 있게 관리하는 조직으로 프로젝트의 효율성 극대화를 위하여 프로젝트의 성공적 수행을 도모한다. 이미 해외에서는 PMO 도입으로 인한 프로젝트 성과 향상에 관한 연구가 보고되었으며, PMO운영을 통해 프로젝트가 성공적으로 관리되고 있는 것으로 나타났다. 최근 정부에서는 공공기관 PMO제도 의무화를 발표하였고, 국내 IT 기업들은 PMO도입을 고려하는 등 PMO제도 정착에 노력하고 있다. 그러나 PMO 초기화 단계로 어떤 기능이 필수적으로 수행되어야 하며, 조직에서 PMO가 어떤 가치를 줄수 있는지는 정의되지 않았다. 본 논문은 전문가 집단 인터뷰를 바탕으로 국내 PMO에 대한 인식과 더불어 PMO 조직이 국내 소프트웨어 산업에서 프로젝트의 범위, 일정, 통합 관리 부분의 영향에 대하여 연구하였다.

THE FUNDAMENTAL PRINCIPLES OF BOT CONTRACT DESIGN

  • Eva C. W. Sung;S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.469-473
    • /
    • 2005
  • Contract design plays a key role in the life cycle of BOT project. All project management activities and operation processes are arranged in consistence with the document of BOT contract which the public sector ensures that the respective roles and responsibilities set out in the contract are fully understood and fulfilled to the contracted performance criteria. With limited theories to deal with some fundamental issues of BOT contract design, we try to collect data from case studies and formulate several practical principles. The conclusions presented in this paper are analyzed from two cases, one is based on an early case in the United Kingdom, and the other based on the Taiwan High Speed Railway case. The purpose of this paper is not about covering all legal issues about BOT contract design, but rather, our work provides common considerations applicable to the contract parties of a broad range of BOT contracts. The results in this paper shall propose some fundamental principles of the BOT contract design.

  • PDF