• 제목/요약/키워드: Voltage constraints

검색결과 146건 처리시간 0.027초

직병렬 임피던스 보상을 통한 계통 연계 분산전원 인버터의 PCC 무효전력 제어 알고리즘 (Reactive Power Control Algorithm of Grid-Connected Inverter at the Point of Common Coupling With Compensation of Series and Parallel Impedances)

  • 허철영;송승호;김용래
    • 전력전자학회논문지
    • /
    • 제27권2호
    • /
    • pp.92-99
    • /
    • 2022
  • Due to space and geographical constraints, the power source may be located outside the island area, resulting in the considerable length of transmission line. In these cases, when an active power is transmitted, unexpected reactive power is generated at a point of common coupling (PCC). Unlike the power transmitted from the power generation source, the reactive power adversely affects the system. This study proposes a new algorithm that controls reactive power at PCC. Causes of reactive power errors are separated into parallel and series components, which allows the algorithm to compensate the reactive current of the inverter output and control reactive power at the PCC through calculations from the impedance, voltage, and current. The proposed algorithm has economic advantages by controlling the reactive power with the inverter of the power source itself, and can flexibly control power against voltage and output variations. Through the simulation, the algorithm was verified by implementing a power source of 3 [kVA] capacity connected to the low voltage system and of 5 [MVA] capacity connected to the extra-high voltage system. Furthermore, a power source of 3 [kVA] capacity inverter is configured and connected to a mock grid, then confirmed through experiments.

선형계획법을 이용한 총송전용량 평가 (Assessment of Total Transfer Capability using Linear Programming)

  • 김규호;송경빈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.262-263
    • /
    • 2006
  • This paper presents a scheme to solve the congestion problem with phase-shifting transformer(PST) and power generation using linear programming method. A good design of PST and power generation control can improve total transfer capability(TTC) in interconnected systems. This paper deals with an application of optimization technique for TTC calculation. linear programming method is used to maximize power flow of tie line subject to security constraints such as voltage magnitude and real power flow. The proposed method is applied to 10 machines 39 buses model systems to show its effectiveness.

  • PDF

부하의 불확실성을 고려한 최적 Var배분 앨고리즘에 관한 연구 (A Study on the Optimal Var Planning Considering Uncertainties of Loads)

  • 송길영;이희영
    • 대한전기학회논문지
    • /
    • 제41권4호
    • /
    • pp.346-354
    • /
    • 1992
  • In the power-system, the active and reactive power levels of load bus randomly vary over days, months, and years which are stochastic in nature. This paper presents an algorithm for optimal Var planning considering the uncertainties of loads. The optimization problem is solved by a stochastic linear programming technique which can handle stochastic constraints to evaluate optimal Var requirement at load bus to maintain the voltage profile which results in probabilistic density function by stochastic Load Flow analysis within admissible range. The effectiveness of the proposed algorithm has been verified by the test on the IEEE-30 bus system.

전압 및 무효전력 계획의 최적화에 관한 연구 (A Study on Optimization of Voltage and Reactive Power Planning)

  • 김준현;김태균
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1988년도 전기.전자공학 학술대회 논문집
    • /
    • pp.859-862
    • /
    • 1988
  • This paper discusses one overall reactive power installation pattern that will satisfy system performance constraints for base case. The cost of installation is minimized, Existing controllers are fully utilized prior to any addition of new installation. Installation pattern for the required new shunt compensation is comprised of discrete, standard size components.

  • PDF

무효전력 최적제어에 의한 전력손실의 최소화

  • 이형관
    • ETRI Journal
    • /
    • 제6권4호
    • /
    • pp.31-36
    • /
    • 1984
  • This paper presents an efficient method for real power loss minimization and for improvements in voltage profiles. This method is accomplished by optimal control of reactive power in the system. The problem is formulated as an optimization problem, suitable for solution by linear programming technique. After establishing the objective function for minimizing the system losses with the help of linearised sensitivity relationships of control variables, i. e., the transformer tap position, generator terminal voltages and switchable reactive power sources. The linear programming technique is used to determine the optimal adjustments to the above variables, simultaneously satisfying the constraints. The proposed algorithm has been tested on a sample system and the result is presented and discussed.

  • PDF

보호기기를 고려한 배전계통 복구방안 (SERVICE RESTORATION OF POWER DRSTRIBUTION SYSTEM IN CONSIDERATION OF PROTECTIVE DEVICES)

  • 이승재;김태형;윤진영;김국헌;김학무
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.48-50
    • /
    • 1993
  • One of the most important functions in the distribution automation is the service restoration. This paper proposes the new method which considers not only constraints of voltage, line current and bank capacity but also the operating characteristics of protective devices such as OCR and reclosers.

  • PDF

LabView를 이용한 Switched Reluctance Motor 설계기술 개발 (Switched Reluctance Motor Design and Analysis with LabView Program)

  • 신판석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.21-23
    • /
    • 2001
  • A design and analysis program is proposed for switched reluctance motor using an analytical method and a CAD program LabVIEW. The algorithm uses conventional permeance method, in which flux linkages, inductances and torques are calculated numerically. In order to analyze a dynamic characteristics of the motor, voltage control scheme is fallen and a single pulse operation is applied. 2 SRM models are analyzed under the given specifications and constraints. The results compared with measured data.

  • PDF

초기 운전점 선정을 통한 배전계통 최적 재구성에 관한 연구 (A study of Optimal Reconfiguration in Distribution Power System using Initial Operating Point)

  • 서규석;김정년;백영식
    • 전기학회논문지
    • /
    • 제56권3호
    • /
    • pp.451-456
    • /
    • 2007
  • This paper presents a problem that reconfigure distribution power system using branch exchange method. Optimal reconfiguration problem calculates line loss, voltage condition about system states of all situations that become different according to line On/off status, and search for optimum composition of these. However, result is difficult to be calculated fast. Because radiated operation condition of system is satisfied using many connection and sectionalize switches in the distribution power system. Therefore, in this paper, optimization method for reducing system total loss and satisfying operating condition of radial and constraints condition of voltage is proposed using the fastest branch exchange. And optimal solution at branch exchange algorithm can be wrong estimated to local optimal solution according to initial operating state. Considering this particular, an initial operating point algorithm is added and this paper showed that optimal solution arrives at global optimal solution.

Comparison and Study of Active and Hybrid Power Filters for Compensation of Grid Harmonics

  • Gutierrez, Bryan;Kwak, Sang-Shin
    • Journal of Power Electronics
    • /
    • 제16권4호
    • /
    • pp.1541-1550
    • /
    • 2016
  • This paper presents a theoretical analysis and comparisons of active power filter (APF) and hybrid power filter (HPF) systems, given terminal constraints of harmonic compensations in nonlinear loads. Despite numerous publications for the two types of filters, the features and differences between them have not been clearly explained. This paper presents a detailed analysis of the operations of a HPF inverter along with those of passive power filters (PPFs). It also includes their effects on the power factor at the grid. In addition, a theoretical analysis and a systematic comparison between the APF and HPF systems are addressed based on system parameters such as the source voltage, output power, reactive component size, and power factor at the grid terminals. The converter kVA ratings and dc-link voltage requirements for both topologies are considered in the presented comparisons

정적 전압의존형 부하모델을 적용한 B계수 산정법 (A Computation Method of B-coefficient With Static Voltage Dependent Load Model)

  • 이명환;채명석;신중린
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 추계학술대회 논문집 학회본부
    • /
    • pp.218-220
    • /
    • 1997
  • In power system, economic dispatch problem is to minimize fuel cost with inequality constraints of generator output. To solve this problem it is very important to express power loss equation that have Quadratic function of generator power included B-coefficient. This paper presents a method in determining B-coefficient by use A-matrix that is calculated by power flow considering voltage dependent static load model. The proposed algorithm is tested with IEEE 6 bus sample system, which shows the result in each cases by the change of load component factor.

  • PDF