• Title/Summary/Keyword: Vertical Inner Anchor

Search Result 2, Processing Time 0.017 seconds

An Experimental Study on Structural Performance of Welded Built-up Square CFT Stub Columns (용접조립 각형 CFT 단주의 구조특성에 관한 실험적 연구)

  • Lee, Seong Hui;Choi, Young Hwan;Yom, Kyong Soo;Kim, Jin Ho;Choi, Sung Mo
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.5
    • /
    • pp.645-653
    • /
    • 2008
  • Welded built-up square tubes are manufactured by flare welding at the center of the column width for cold-formed L-shaped four-piece plates and improved composite effect of concrete and steel by vertical inner anchor. Also, the axial resistance of concrete is increased by the thinness of the steel column, and the composite effect of concrete and steel prevents the steel column from local buckling. In this study, we introduced a manufacturing method of built-up square column steel square concrete-filled tubular column with vertical inner anchor and superior structural performance of the square stub column verified by the structural test for 15 specimens with parameters of shape of tube (built-up square tube, general steel tube), width over thickness of the steel tube (B/t=50, 58, 67) and the strength of concrete (f'c=10MPa, 50MPa).

A study on structural performance of steel brackets in vertical shaft connected to double-deck tunnel (복층터널 연결 수직구용 철재브래킷 구조성능 연구)

  • Shin, Young-Wan;Min, Byeong-Heon;Nam, Jung-Bong;Lee, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.363-375
    • /
    • 2019
  • Since the double-deck tunnel is deeply constructed in the city, it is necessary to secure the installation space of air supply and exhaust, escape passage stairs, elevator, distribution facilities and connection tunnels in the vertical shaft for the double-deck tunnel. Also, in order to minimize the effect of construction on adjacent area, it is necessary to construct the concrete structures at high speed in vertical shaft after tunnel excavation. Therefore, the slabs and the stairs in vertical shaft are needed to be constructed using precast concrete, and the rapid construction techniques of bracket for supporting the inner precast structure are needed. The bracket installation methods include cast-in-place concrete, precast concrete and steel. In this study, the improvement of the steel brackets with good economical efficiency and good workability was carried out in consideration of the improvement of the construction speed. We have developed a new bracket that is optimized through bracket shape improvement, anchor bolt position adjustment and quantity optimization. As a result of the structural performance test, it was confirmed that the required load supporting capacity was secured. As a result of structural performance test for bar type anchor bolt and bent anchor anchor bolt, it was confirmed that the required load carrying capacity was secured and that the load bearing capacity of bent anchor bolt was large.