International conference on construction engineering and project management
/
2011.02a
/
pp.504-509
/
2011
Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.233-234
/
2016
Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.797-800
/
2007
Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.
Korean Journal of Construction Engineering and Management
/
v.9
no.4
/
pp.154-162
/
2008
Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.151-156
/
2007
2006년부터 VE 대상프로젝트가 확대되고, 기본설계와 실시설계단계에 각 1회씩 설계VE를 적용토록 규정되어 설계단계별로 VE가 각각 적용되는 프로젝트가 늘어나고 있다. 그리고 원가절감과 성능향상으로 프로젝트 가치를 높인 설계VE 사례도 많아지고 있다. 하지만 기본설계와 실시설계단계의 조건에 적합한 VE 수행방안에 대한 연구가 미진하고 참여자들의 경험과 이해가 부족하여 단계별 설계VE를 효율적으로 수행하는데 많은 어려움이 있다. 본 연구에서는 기본설계단계와 실시설계단계로 나누어 VE를 수행한 실무사례를 분석하여 기능정의와 아이디어 창출간의 연관관계 및 각 설계단계에서 기능정의를 수행할 때 발생하는 문제점을 도출하였다. 문제점을 해결하고 효과적인 설계VE를 수행하기 위하여 다음과 같은 개선방안을 제시하였다. 첫째, 설계프로세스의 흐름에 맞추어 기본설계에는 공간기능에 대하여하고 실시설계에는 부위에 대하여 기능정의를 수행한다. 이때 상위의 레벨에는 하위의 레벨의 기능정의가 연계되는 기능분류체계 (FBS : Function Breakdown Structure)를 제안하였다. 둘째, 기본설계와 실시설계단계의 기능정의를 수행하는 프로세스 (FDP : Function Definition Process)를 제안하였다. 셋째, 실시설계단계에서는 부위별 요구 성능 평가 매트릭스 (EFM : Element Function Matrix)를 적용하여 기능정의와 아이디어 창출이 연계되도록 하였다. 설계VE의 주요 부분인 기능정의 과정에 대한 문제점을 도출하여 해결방안을 제시함으로써, 보다 효과적인 설계VE의 수행을 기대할 수 있다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.1023-1028
/
2007
It is the most important thing of the overall VE that we create inventive ideas from idea phase in the design VE. However, it is hard that it take a long time and create a superior idea using Brainstorming. And, it was real to lodge an alternative plan proposed on the idea thinking phase, it is true that an alternative plan of existing simply costdown apply to a change and insert isn't different from an inventive idea deduction. Also creating alternative idea, many expert hold on to only his field and it was exposed a limit depend on a team's experience or intuition than technical solution. In this study, we analyzed the problem of the present design VE processing and analyzed the problem through a survey to an expert, and then we'll suggest a possibility for an efficient design VE.
The study investigated the effects of dietary Vitamin E (VE) on nitric oxide (NO) metabolism, immune function and analyzed the correlation between NO free radical and cytokines (IL-2 and IL-6) in broilers. One hundred and fifty 2-week-old broilers were randomly divided into three groups. Control group and lower VE ($VE^-$) group were provided with a basic diet supplemented with 12.55 mg/kg VE and 2.55 mg/kg VE for 30 days, respectively. Higher VE ($VE^{-}-VE^+$) group was supplemented with 2.55 mg/kg VE in the first 15 days and then 32.55 mg/kg VE in the next 15 days. Five broilers in each group were then sacrificed on the 5th, 10th, 15th, 20th, 25th and 30th days, respectively, and the content of NO free radical, superoxide dismutase (SOD), glutathione peroxidase (GSHPx), malondialdehyde (MDA) and cytokines, IL-2 and IL-6, were measured. The results showed that lower VE could decrease growth performance of broilers while higher VE could increase growth performance and eliminate differences resulted from feeding lower VE dietary in early stages (p<0.05). Compared with the control group, lower VE could increase significantly NO and MDA concentration, and increase IL-2 concentration in serum (p<0.05). Higher VE could significantly increase activities of SOD and glutathione GSH-Px (p<0.05). IL-2 is positively correlated with NO in heart (p<0.05) and IL-6 is negatively correlated with NO in liver (p<0.05) and heart (p<0.01). These results indicate that dietary VE could regulate antioxidant capacity and NO metabolism of broilers and higher VE-supplemented diet could directly decrease production of IL-2.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.80-87
/
2021
Shortage of SOC budget and inappropriate initial construction cost planning have worsened the economic sentiment of the construction firm. Construction VE can be one of the solutions for improving the profitability of construction projects. This study identifies the strong and weak points of construction firms for establishing the strategy of effective construction VE by using importance-performance analysis. As a result, construction firms have strong points on support, cooperation, and knowledge about construction VE, but have weak points on 'VE experience of VE leader', 'Detailed cost estimation', and 'Idea generation and evaluation'. This paper contributes to establishing the strategy of effective construction VE from the perspective of the construction firm, which is differentiated from previous studies that have focused on the institutional approach for construction VE.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.11a
/
pp.129-132
/
2012
Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.
Kim, Mi-Ryang;Lee, Chang Won;Dunham, Michael M.;Evans, Neal J II;Kim, Gwanjeong;Allen, Lori E
The Bulletin of The Korean Astronomical Society
/
v.41
no.2
/
pp.38.3-39
/
2016
We present the results of a search for Very Low-Luminosity Objects (VeLLOs) in the Gould Belt (GB) clouds using infrared and sub-millimeter (sub-mm) data from 1.25 to $850{\mu}m$ and our N2H+ (J = 1-0) observations. We modified the criteria by Dunham et al. to select the VeLLOs in the GB clouds, finding 95 VeLLO candidates, 79 of which are newly identified in this study. Out of 95 sources, 44 were detected in both sub-mm continuum and N2H+ emission and were classified as Group A (the VeLLOs), and 51 sources detected in either sub-mm emission or N2H+ emission were classified with Group B as candidate VeLLOs. We find that these VeLLOs and the candidates are forming in environments different from those of the likely VeLLOs. Seventy-eight sources are embedded within their molecular clouds, and thus are likely VeLLOs forming in a dense environment. The remaining 17 sources are located in low-level extinction regions (Av < 1) connected to the clouds, and can be either background sources or candidate substellar objects forming in an isolated mode. The VeLLOs and the candidates are likely more luminous and their envelopes tend to be more massive in denser environments. The VeLLOs and the candidates are more populous in the clouds where more YSOs form, indicating that they form in a manner similar to that of normal YSOs. The bolometric luminosities and temperatures of the VeLLOs are compared to predictions of episodic accretion models, showing that the low luminosities for most VeLLOs can be well explained by their status in the quiescent phases of a cycle of episodic mass accretion.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.