• Title/Summary/Keyword: Variable bogie

Search Result 12, Processing Time 0.022 seconds

Static Fatigue Analysis of Welding Bogie Frame Under Variable Amplitude Loading (변동하중하에 용접대차프레임의 정적 피로해석)

  • Kim, Chul-Su;Kang, Ju-Seok;Ahn, Seung-Ho;Chung, Kwang-Woo;Cheon, Young-Suk;Park, Choon-Soo;Kim, Sang-Soo
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.421-426
    • /
    • 2009
  • Recently, the design process for a railway bogie frame in Europe has been carried out according to the norm EN 13749. The activities in the norm EN shall demonstrate that the design of the bogie frame fulfills the acceptances of 4 steps of the program such as structural calculation, static tests, fatigue test and on-tracks tests. At the end of the acceptance program, the on-tracks tests have the aim to measure the real stress history generated in operation and to verify that they are reasonably next to those calculated and measured on the test rig. Therefore, in order to assure the safety of the railway vehicle, it is important to examined the durability of that under load histories measured from on-tracks tests. In this study, under variable amplitude loading based on the actual acceleration history, fatigue analysis of the welding bogie frame is investigated by using durability software. Moreover, the fatigue life of the frame under the loading in the norm EN fatigue test condition is evaluated and compared with the life under variable amplitude loading.

  • PDF

A Study on the Fatigue Crack Evaluation Method of Railway Bogie Frame (철도차량 대차를 피로균열 평가법 연구)

  • Jun, Hyun-Kyu;Seo, Jung-Won;Lee, Dong-Hyong;Kim, Hyeong-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.16-24
    • /
    • 2009
  • In this study, fatigue crack growth rate of a cracked railway bogie frame under variable amplitude loading is predicted by applying linear elastic fracture mechanics. For this purpose, we find the critical points by reference surveying on cracked railway bogie frames. And we make an effective load history by synthesizing the dynamic load measured from the critical points of railway bogie frame during commercial line operation and the static load calculated from structural analysis. Crack growth analyses are performed at the 3 critical points under the commercial operation loading condition by assuming an initial crack size as 40 mm. and the results are compared with the experimental results from Japanese railway bogie frame crack growth case. From the analysis results, we find that around 500,000 km operating distance is necessary to bring crack growth from the initial crack to unstable crack. And it takes around 3.8 normal operating years. We conclude that it is enough time to detect the crack between normal maintenance period.

The influence of transom pipe gap on the resonance response in motorized bogie and traction motor system (트랜섬 파이프 간격이 동력대차-견인전동기간 강체 모드 공진응답에 미치는 영향에 관한 연구)

  • Kim, Jaehwan;Song, Seeyeop;Lim, Hyosuk
    • The Journal of the Acoustical Society of Korea
    • /
    • v.38 no.3
    • /
    • pp.340-343
    • /
    • 2019
  • In this paper, a problem of mechanical resonance between traction motor's rigid body mode and traction motor's excitation force is introduced, and a bogie design variable affecting the control of resonance response is reviewed numerically. To solve the resonance problem in rotating machinery with variable rotational speeds, resonance frequency should be out of rotational machine's operation range or dynamic stiffness of structures should be increased for resonance response enough to be low. In general, operation range of a traction motor is from 0 r/min to 4800 r/min. It is not possible that all bogie modes are more than 80 Hz. Therefore, it is very important to find design factor affecting resonance response of traction motor's rigid body modes. It is found that key design variable is the gab between transom pipes from finite element analysis. The larger gab is, the higher resonance response when resonance between traction motor's excitation force and traction motor's rigid body mode is happened.

Patent-map analysis of variable-gauge systems (궤간가변 시스템의 특허맵 분석 연구)

  • Jang Seung-Ho;Han Jun-Seok;Na Hee Seung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.638-644
    • /
    • 2004
  • Variable-gauge systems can be used for the fast and safe transportation in the railways with different gauges instead of transshipment or bogie-changing. The system will be necessary to connect the trans-Korean railway with the transcontinental railway effectively. In this paper, searches of patent information about variable-gauge system are conducted and the patent maps are analyzed to seize the overall image and trend of the technology field. The results can be a reference for determining the development direction of the variable-gauge system suitable in the north-east asian railway networks.

  • PDF

Dynamic Analysis of Variable-Gauge Wheelset (궤간가변대차용 윤축시스템의 동역학적 해석)

  • Lee Dong-Won;Bae Dae-Sung;Han Joon-Suk;Jang Seung-Ho;Na Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.773-777
    • /
    • 2004
  • The variable-gauge wheelset drives on the variable railways. It doesn't need to replace or move the carriages to another bogie parts. This paper is for dynamic analysis of the variable-gauge wheel set. 3D-Virtual Mock-up. program was developed to verify the operating mechanism and understand dynamic characteristics for German RAFIL- V variable-gauge wheel set. When the system is going through the width-variable railway, its safety depends on the stiffness and velocity. So the numerical and contact model of this system were developed. This solution is useful to analyze dynamic characteristics for variable-gauge wheelset.

  • PDF

Development and Effectiveness Evaluation of Acupressure Bed with Variable Type Bogie (변동형 대차 구동방식의 지압 침대 개발 및 유효성 평가)

  • Heo, Sung-Phil;Park, Se-Jin;Ahn, Do-Hyun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.25 no.6
    • /
    • pp.47-54
    • /
    • 2020
  • The acupressure is a treatment that applies pressure to certain parts of the body and has been mainly used for pain relief in the field of oriental medicine. However, the treatment effect is often different depending on the practitioner's ability, experience, and physical strength, so standardized acupressure is needed. In this regard, the equipment is being released, but this is mainly a rolling massage method, which reduces energy concentration and poses a risk of injury. Therefore, in this study, a device that provides vertical acupressure based on variable bogie (wheel truck) was implemented. As a result of experimenting with load and body pressure distribution and desirability to validate the device's bearing pressure, the acupressure rod held up to 150kg, the body pressure ratio was measured lower than the body pressure ratio of the comparison item in section 0%

A Study on the Rail Pone of Transition Curve Track to Speed Up of Tilting train (틸팅차량 완화곡선 증속 주행시 궤도작용력 검토)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.529-538
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.

  • PDF

Effectiveness Evaluation of the Bogie Exchange and the Automatic Variable Gauge System using LCC Analysis (LCC 분석을 이용한 대차교환과 자동궤간가변 시스템의 효율성 평가)

  • Chung, Kwang-Woo;An, Joon-Yong;Kim, Chul-Su;Na, Hee-Seung
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.334-342
    • /
    • 2012
  • It is connected with various gauges existing in Euro-Asian continents. Such differences impedes the operation seriously as on the contact of railway tracks of different gauge the cargo must be either transshipped or the running assemblies of rail vehicles must be exchanged. Those operations are costly, time-consuming and require extended infrastructure together with very expensive storage and transshipment facilities at border-crossing point. Moreover, those operations extend transportation time considerably. Therefore, effectiveness of railway transportation systems significantly depends on track gauge change 1435/1520mm, which connects with complicated handling-shifting operations. The paper concerns assessment of effectiveness in strategical rail systems with gauge changing. The paper presents short description of transport system with gauge changing and initial assessment of shifting technologies. Method of system assessment comparison based on Life Cycle Cost model is described here as well.

Economic Analysis on Transshipment and the Gauge-Adjustable System for Trans-Continental Container Transportation (대륙연계 컨테이너 수송을 위한 환적방식과 궤간가변방식의 경제성 비교)

  • Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.5
    • /
    • pp.373-380
    • /
    • 2014
  • With a view to the commercialization of the Korean automatic variable-gauge bogie in the Eurasia railway system, the aim of this research was to perform an economic analysis concerning the possible introduction and operation of this bogie at the present time. For this purpose, we compared the possible types of freight connection service for container transportation, transshipment and the gauge-adjustable system, estimating the total life-cycle cost (LCC) incurred by each system, depending on type and quantity, over the whole process of acquisition, operation, maintenance and disposal. Based on this, we presented a case-by case analysis. Furthermore, in estimating economic feasibility, we analyzed the cost-benefit ratio taking into account not only the objective LCC, but also the reduced time required for the gauge-change and customer convenience. After estimating the LCC and analyzing the cost-benefit ratio of the respective systems, we demonstrated the economic superiority of view of the gauge adjustable system.

Analysis of Occurrence Tendency of Rail Force According to Running the Hanvit 200 Train on Transition Curve Track (한국형 틸팅차량 완화곡선 주행시 궤도작용력 발생경향 분석)

  • Park, Yong-Gul;Choi, Sung-Yong;Kim, Youn-Tae;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.678-686
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured rail force data in transition curve track, and then evaluated probability the range of load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of rail force by occurred a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation. Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation by changed of cant.