• 제목/요약/키워드: Variable Duty Cycle

검색결과 43건 처리시간 0.03초

신경회로망을 이용한 에어컨의 가변주기제어 방법론 개발 (Development of Variable Duty Cycle Control Method for Air Conditioner using Artificial Neural Networks)

  • 김형중;두석배;신중린;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권10호
    • /
    • pp.399-409
    • /
    • 2006
  • This paper presents a novel method for satisfying the thermal comfort of indoor environment and reducing the summer peak demand power by minimizing the power consumption for an Air-conditioner within a space. Korea Electric Power Corporation (KEPCO) use the fixed duty cycle control method regardless of the indoor thermal environment. However, this method has disadvantages that energy saving depends on the set-point value of the Air-Conditioner and direct load control (DLC) has no net effects on Air-conditioners if the appliance has a lower operating cycle than the fixed duty cycle. In this paper, the variable duty cycle control method is proposed in order to compensate the weakness of conventional fixed duty cycle control method and improve the satisfaction of residents and the reduction of peak demand. The proposed method estimates the predict mean vote (PMV) at the next step with predicted temperature and humidity using the back propagation neural network model. It is possible to reduce the energy consumption by maintaining the Air-conditioner's OFF state when the PMV lies in the thermal comfort range. To verify the effectiveness of the proposed variable duty cycle control method, the case study is performed using the historical data on Sep. 7th, 2001 acquired at a classroom in Seoul and the obtained results are compared with the fixed duty cycle control method.

직접부하제어자원으로서 에어컨 주기제어 방법론 개발 (Development of Control Method for Air-Conditioner as the Resources of DLC)

  • 두석배;김정욱;김형중;김회철;박종배;신중린
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.145-147
    • /
    • 2005
  • This paper presents a methodology for satisfying the thermal comfort of Indoor environment and reducing the summer peak demand power by minimizing the power consumption for an Air-conditioner within a space. KEPCO(Korea Electric Power Corporation) use the fixed duty cycle control method regardless of the indoor thermal environment. This method has disadvantages that energy saying depends on the set-point value of the Air-Conditioner and DLC has no net effects on Air-conditioners if the appliance has a lower operating cycle than the fixed duty cycle. A variable duty cycle estimates the PMV(Predict Mean Vote) at the next step with a predicted temperature and humidity coming from the back propagation neural network model. It is possible to reduce the energy consumption by maintaining the Air-conditioner's OFF state when the PMV lies in the thermal comfort range. The proposed methodology uses the historical real data of Sep. 7th, 2001 from a classroom in seoul to verify the effectiveness of the variable duty cycle method comparing with fixed duty cycle. The result shows that the variable duty cycle reduces the peak demand to 2.6times more than fixed duty cycle and increases the load control ratio by 8% more. Based on the variable duty cycle control algorithm, the effectiveness of DLC is much more improved as compared with the fixed duty cycle.

  • PDF

Duty Cycle 기반의 WSN MAC을 위한 트래픽 환경에 따른 가변 Wakeup Period 기법 제안 (A Study of Variable Wakeup Period for Duty Cycled MAC protocol in WSN)

  • 이재호;엄두섭
    • 전자공학회논문지
    • /
    • 제49권12호
    • /
    • pp.45-55
    • /
    • 2012
  • 센서 네트워크는 센서가 설치된 지역에서 감지된 데이터를 무선으로 전달하는 기술로서, 기존 방식과 달리 에너지 효율이 매우 중요한 성능요소이다. 이러한 특성에 따라 많은 WSN MAC 프로토콜에서는 Wakeup과 Sleep을 반복하여 수행하는 Duty Cycle 기법을 활용하고 있지만, 고정적인 Wakeup 구간의 설정에 따라 획일화된 에너지 성능과 수신 성공률로 인하여 성능이 제한적이다. 본 논문에서는 이러한 Duty Cycle 기반의 MAC 프로토콜을 개선하기 위하여, 채널 환경에 따라 동적으로 Wakeup 구간을 가변화시키는 기법을 제안한다. 제안하는 방식은 트래픽이 높은 환경에서 Wakeup 구간을 증가시켜 수신 성공률을 높이고, 트래픽이 낮은 환경에서 Wakeup 구간을 줄여 에너지 성능을 향상시켰다. 또한 본 논문에서는 제안하는 방식의 성능에 대한 효율적인 평가를 위하여 기존 동기식 및 비동기식 MAC의 결과와 제안방식을 적용한 MAC의 결과를 비교하고 이를 분석하였다.

인버터 구동 원심펌프의 급수 사용율에 따른 에너지 절감 평가 (Evaluation of Energy Savings for Inverter Driving Centrifugal Pump with Duty Cycles)

  • 김경욱;서상호;라키부자만
    • 한국유체기계학회 논문집
    • /
    • 제18권6호
    • /
    • pp.81-85
    • /
    • 2015
  • The purpose of this study is to evaluate energy savings for inverter driving multi-stage centrifugal pump. Variable speed driving pump system has high efficiency compared with constant speed driving pump system. Because of difficulty to estimate operating efficiency of variable speed driving pump system, energy saving rates are used to replace operating efficiency. energy saving rates are calculated from pump input power and pump duty cycle. But another researches have used pump duty cycles of each season for energy saving rate. In this study, for estimating energy saving rate more high accuracy, pump duty cycles are measured for 1 year. pump duty cycles, depending on the season and be classified according to the weekday/weekend or during the week day. By this pump duty cycles, Energy saving rate is calculated appropriately.

무선 센서 네트워크에서 큐 관리 기반의 듀티 사이클 제어 (Queue Management-Based Duty Cycle Control in Wireless Sensor Networks)

  • 변희정;손수국
    • 제어로봇시스템학회논문지
    • /
    • 제17권12호
    • /
    • pp.1273-1277
    • /
    • 2011
  • This paper proposes a control-based approach for duty cycle adaptation in wireless sensor networks. The proposed method, QCon, controls duty cycle through queue management in order to achieve high performance under variable traffic rates. To minimize energy consumption while meeting delay requirement, we design a feedback controller, which adapts the sleeping time according to dynamically changing traffic by constraining the queue length at a predetermined value. Based on control theory, we analyze the adaptive behavior of QCon and derive conditions for system stability. Results from asymptotic analysis and simulations indicate that QCon outperforms existing scheduling protocol by achieving more energy savings while satisfying delay requirement.

Variable Step Size Maximum Power Point Tracker Using a Single Variable for Stand-alone Battery Storage PV Systems

  • Ahmed, Emad M.;Shoyama, Masahito
    • Journal of Power Electronics
    • /
    • 제11권2호
    • /
    • pp.218-227
    • /
    • 2011
  • The subject of variable step size maximum power point tracking (MPPT) algorithms has been addressed in the literature. However, most of the addressed algorithms tune the variable step size according to two variables: the photovoltaic (PV) array voltage ($V_{PV}$) and the PV array current ($I_{PV}$). Therefore, both the PV array current and voltage have to be measured. Recently, maximum power point trackers that arc based on a single variable ($I_{PV}$ or $V_{PV}$) have received a great deal of attention due to their simplicity and ease of implementation, when compared to other tracking techniques. In this paper, two methods have been proposed to design a variable step size MPPT algorithm using only a single current sensor for stand-alone battery storage PV systems. These methods utilize only the relationship between the PV array measured current and the converter duty cycle (D) to automatically adapt the step change in the duty cycle to reach the maximum power point (MPP) of the PV array. Detailed analyses and flowcharts of the proposed methods are included. Moreover, a comparison has been made between the proposed methods to investigate their performance in the transient and steady states. Finally, experimental results with field programmable gate arrays (FPGAs) are presented to verify the performance of the proposed methods.

듀티 제어가 적용된 3레벨 LLC 컨버터의 정상상태 및 소신호 모델링 (Steady State Analysis & Small Signal Modeling of Variable Duty Cycle Controlled Three Level LLC Converter)

  • 후세인 휴마라;김학원;조관열
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2019년도 전력전자학술대회
    • /
    • pp.317-319
    • /
    • 2019
  • In this paper, a three level duty cycle controlled half bridge LLC converter for EV charger application is presented. The topology and operating regions of the converter are discussed. The equations of the converter are derived in time domain. A small signal model of the converter is developed by perturbation and linearization of the steady state model about their operating point using Extended Describing function.

  • PDF

벡터 제어 인버터 구동 원심펌프시스템의 에너지 절감 평가 (Evaluation of Energy Saving with Vector Control Inverter Driving Centrifugal Pump System)

  • 서상호;김경욱;김형호;윤인식;조민태
    • 한국유체기계학회 논문집
    • /
    • 제18권2호
    • /
    • pp.67-72
    • /
    • 2015
  • The purpose of this study is to achieve energy saving effect of inverter driving multistage centrifugal pump. For determining the operation points in the pump system, the system curves should be obtained experimentally. To get the system curves, three pumps combined in parallel and one pump operated with different rotational speeds. But for variable speed pump system, energy saving rates can not be evaluated from operation efficiencies. That is why operation efficiencies, system curves, duty cycles, and input powers of the pump system were measured by the constructed experimental apparatus. The duty cycle segmented into different flow rates and weighting the average value for each segment by the interval time. The system was operated with two different periods. The mean duty cycles were collected from apartment and found that the system operated at 40% and at 50% or below capacity. Measured energy saving rate was 58.16%. Estimating method of energy saving rate could be more effective operation index than that of operation efficiency.

양단 공진과 듀티 컨트롤을 이용한 1-2cm 공극을 통한 에너지 전달 (Transcutaneous Energy Transmission with Double Tuned Duty Cycle Control)

  • 김창균;조보형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 A
    • /
    • pp.486-488
    • /
    • 1996
  • A dc-dc converter which transfers l2-48W of power(regulated output voltage 24V) across a large, variable air gap(1-2cm) has been designed. This converter employs double resonance to compensate the large leakage inductance of the primary and secondary of the transcutaneous transformer. To maximize the effect of resonance, a constant frequency, duty cycle control method is used. The duty cycle control presents advantages over a frequency control in terms of increase in dc voltage gain and reduction of the primary current. The analysis and design procedure for the proposed scheme is presented and the performance result is simulated and verified experimentally.

  • PDF

다상/다단 부스트 컨버터의 DC-Link 리플 전류 분석 (A Study on DC-Link Current Ripple of Multi-Phase/Multi-Stage Boost Converter)

  • 김승민;김동희
    • 전력전자학회논문지
    • /
    • 제28권1호
    • /
    • pp.59-67
    • /
    • 2023
  • This paper explores the variation of DC-Link current ripple analysis in terms of duty cycle and phase angle of Multi-phase/Multi-stage boost converter. A 2-Stage/1-Stage boost converter DC-Link current is used to determine the difference between the 1st stage diode current and the 2nd stage inductor current. Each stage boost converter diode and inductor current is subordinate to the phase angle and duty cycle. The magnitude of the ripple current is variable according to phase angle and duty cycle. The analysis results are verified by variation of DC-Link current ripple using a 1kW typical 2-stage/1-stage boost converter.