• Title/Summary/Keyword: VE Process

Search Result 185, Processing Time 0.032 seconds

A Basic Study for Establishing of Numerical Range Criteria for Classification of Value Improvement Types (VE 가치향상 유형별 수치적 범위기준 설정을 위한 기초연구)

  • Nam, Keong Woo;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.74-75
    • /
    • 2018
  • VE, rather than just cost reduction tool, have established as a value enhancement tool of the construction industry. Value improvement types of VE proposal can show the effect of VE activities, also acts as an important element in which the owner adopts a proposal and confirms the results of the VE activities. However, problems in the process of quantification for VE proposal and ambiguous standards in classification of value improvement types is need to be supplemented. Accordingly, This study suggests the plan for establishing of numerical range criteria for classification of value improvement types of VE proposal. Implementing this plan will be able to improve the reliability and availability for VE activities.

  • PDF

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

A Study on the Collaboration of the Function Analysis and Idea Creation Phase with Function Integration FAST(FI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) (통합 기능계통도와 계층적 컨셉모듈을 활용한 기능분석단계와 창조단계의 연계성에 관한 고찰)

  • In, Chi-Sung;NamKung, In-Il;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.355-360
    • /
    • 2006
  • Function analysis and idea creation phase in Value Engineering(VE) Process is applied to manufacturing Industry for developing functions for elements of products, and in construction come to use various components like process, size of project, spaces as well as function itself due to multi-functional aspect. For this reason, VE applications to the construction industry are considered to be less frequent and efficient than to the manufacturing. To resolve this problem, a new technique of Function Integration Fast(HI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) was made for practical integration and sequence of VE job Plan. Two types of function would be defined In this method, first and second function, during the job Plan process, and two function champions be selected for next creation phase process. For verification of consecutiveness of function analysis and idea creation phase for successful VE project implementation, this methodology was tested under design phase in office and IT Multi-functional building project. Make sure the successful application of this process with this method, need to develop the talent of VE experts and team members for process of function analysis and creation phase.

  • PDF

A Process Model for Effective Idea Creation and Administration of Value Engineering at Design Phase Activity (설계VE활동의 효과적인 아이디어 창출 및 관리를 위한 프로세스 모델)

  • Kim, Hong-Hyun;Min, Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.13-21
    • /
    • 2009
  • The ideas created by the execution of Value Engineering(VE) during design phase are usually proposed in a scattered way due to the characteristic of brainstorming. Because of this process, it is likely that similar ideas are proposed duplicatedly, and the created similar overlapping ideas may lead to different analyses and evaluations respectively. The efficient analysis/evaluation of the such similarly created ideas are not easy and the verification of the adequacy and objectivity of the ideas becomes harder and the objective evaluation gets more difficult as well as consumes much time. In spite of the perfect executions of preparatory step for idea creation, the difficulties in managing the similarly created ideas in quantity systematically result in the reduced reliability of the VE activities during design phase. Thus, this study proposes a process model for the efficient idea creation and management of the VE activities during design phase.

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.

  • PDF

Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage (기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용)

  • Park, In-Ji;Son, Myung-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

An investigation of Function Analysis patterns for the Effective VE at the Design Phase (효과적인 설계VE 활동을 위한 기능분석 유형조사)

  • Min Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.63-71
    • /
    • 2004
  • This study is an analysis the function Analysis Patterns for the effective application of VE(Value Engineering) and a presentation of the function analysis methods. 1. The function analysis of VE activities can be summarized 6 patterns as follows ; a generated ideas without function analysis process, a function analysis make use of inspection tools for generated idea, an illogical jump as a using of subjective terms, a using of duplication terms for same functions, a subjective ranking as function definitions for function analysis, and a large classification for a for approaching function definition. 2. In order for the effective function analysis, the process requires as follows; a check level by project advanced, a reclassified main nouns in the order of frequency of use, a main check objects by concepts of importance and satisfaction degree. It is not only good for the effective function analysis, it also induces effective turn out of the FAST Diagram for function arrangement.

A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase in Construction Projects (설계VE 제안평가 절차 및 방법에 관한 연구)

  • Choi, In-Su;Hyun, Chang-Taek;Hong, Tae-Hoon;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.129-138
    • /
    • 2009
  • The role and importance of VE have been enlarged since VE application was mandatory by law in public sector in March, 2000. Public organizations have widened the technological horizon through VE competitions and applied VE technique to private investment projects. Many studies have been carried out on function analysis and VE procedure. In practice it is common that clients make a decision one-sidedly on whether or not VE proposals are selected. The VE procedure itself is not smooth. This study gives some suggestions on VE appraisal procedure and criteria at the last phase on VE process in order to smooth the progress of VE. The results of this study can be used as a tool to improve efficiency in the management of VE.

A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway (효율적 고속도로 설계VE 수행을 위한 Hi-Value 프로세스 정립)

  • Heo, In;Lee, Yong-Gu;Jeong, Byeong-Cheon;Yang, Jae-Gyeong
    • Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.36-48
    • /
    • 2011
  • 도로건설프로젝트에서의 VE는 도로시설물의 기능을 향상시키고 비용을 절감하기 위한 방법으로 지금까지 널리 활용되고 있다. 그러나, 실제 건설VE 실무에서는 VE Job Plan 중 일부 단계가 생략되거나 형식적으로 수행되는 문제점이 발생되어 VE 수행결과에 대한 신뢰성에 의문이 제기되고 있다. 이는 제조업과 달리 대규모이며 복합공종을 갖는 건설프로젝트의 특성을 반영하지 못하고 있기 때문이다. 건설프로젝트는 대규모 복합공종으로 구성되어 복잡하고 다양한 기능 및 요구성능이 있으며, 시설물이 갖는 기능(Function)과 요구성능(Required Performance)의 일부는 반복적으로 발생하는 특징을 가지고 있다. 이에 본 연구에서는 VE Process의 실효성을 높이기 위하여 품질모델(Quality Model)과 기능분석(Function Analysis)단계에서 이러한 특징을 반영한 개선방향을 제시하고, 수차례 실무 검증을 통하여 적용성 및 효율성을 확인하였다. 이와 더불어 고속도로 VE Job Plan은 고속도로 설계 업무절차에 부합하도록 개선하여 VE 수행효과가 극대화 되도록 제안하였으며, 또한 한국도로공사에서 시행하는 고속도로 대한 VE절차를 "Hi-Value"라 명명하고 실무활용성, 효율성을 확대하고 지속적으로 발전시켜 나아갈 계획이다.

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF