• Title/Summary/Keyword: VE Job Plan

Search Result 29, Processing Time 0.029 seconds

Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project (철도건설사업의 효율적인 VE수행을 위한 성능측정기법)

  • Lim, Jong-Kwon;Park, Mi-Yun;Park, Heung-Min;Kim, Sung-Hun;Lee, Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF

Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry (국내 건설VE 운영현황과 발전방향)

  • Seo, Yong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.137-144
    • /
    • 2007
  • In the year of 1980 and 2000, the Korean government institutionalized the Value Engineering methodology in the construction phase and the design phase respectively. While design-phase VE have been applied to construction industry actively, which was institutionalized 7 years ago, construction-phase VE have not been applied to industry frequently, although it was institutionalized 25 years ago. On the other hand, at the time of social demands for VE is increasing, it has been pointed out that VE should be compatible with the delivery system. And the time of VE study, the operational management of VE study, and the maintenance process of the result of the VE study also should be considered. In this study, a scheme to improve VE methodology in the construction industry is proposed based on the literature review and the data analysis of domestic and foreign state of VE.

  • PDF

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.

  • PDF

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

A Study on the Supply and Demand of Technical Manpower in Construction (건설기술인력의 수급효율화 방안 연구)

  • Park Hwan-Pyo;Ji Sang-Wuk;Lee Kyo-Sun;Park Sang-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.58-65
    • /
    • 2002
  • University graduates from construction-related departments are undergoing serious difficulties in getting a job as construction companies are reluctant to employ new personnel due to the depression in the construction industry which has been downscaled in both domestic and overseas markets. In the situation is like this, statistics show that the percentage of employment among the university graduates is less than $25\%$, the unemployment problem in the construction sector has started to demand urgent countermeasures. This report anticipated demand and supply for technical man power in the field of construction in between 2002-2008. For preparation of an effectiveness of supply and demand plan on over-supplied in construction technical man power, this suggested expansion of SOC investment, induced into IT field of unemployed construction manpower, enlargement of overseas construction manpower And this considered an elastic operation of curriculum related to construction, and arranged an excess supply and demand of construction technical manpower, which has been considered to education that will meet with demand of enterprise, etc. on both side of quantity and quality simultaneously.

Design Improvement VE Case for Expansion of a Roadway over a Soft Soil (연약지반 도로확장공사 설계 개선에 따른 가치 평가 사례)

  • Kim, Tae-Hyung;Kim, Kook-Han;Choi, Young-Chu;Lee, Sa-Ik;Ruy, Ji-Hoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • Expansion of a roadway on a soft ground can cause settlement of the existing road during embankment construction due to the consolidation characteristics of the soft soil. Many problems related to construction and maintenance, such as deterioration of the surface, decreased safety, and decreased structural stability, could affect the existing road. This scenario is especially true if the roadway foundation is a deep thick soft ground. Therefore, engineers should carefully select a proper design based on the characteristics of the soil layer. In this study, the expansion of the second branch of the Namhae Expressway was selected as the target site because this expressway has been constructing on a soft soil layer approximately 50 m thick. The original design was reviewed, problems were discussed and alternative was proposed through value engineering job plan phases: investigation, speculation, evaluation, development and presentation. In addition, the proposed alternative was evaluated on cost, function and value improvement. Compared to the original design, the proposed alternative saved cost and improved the function and overall value.

A Study on the Issues and Improvement of the Existing Environmental Impact Assessment System - Evaluation in an operator Viewpoint - (현행 환경영향평가 제도의 문제점과 개선방안 - 실무자적 관점에서 검토 -)

  • Lee, Seung-Won;Kim, Jung-gun;Seo, Jung-Kuk
    • Journal of Environmental Science International
    • /
    • v.27 no.5
    • /
    • pp.281-289
    • /
    • 2018
  • The Korean environmental impact assessment(EIA) system, and explored ways to improve it as a more efficient and viable institution relevant to the demand of our time and conditions in study. The first problem this study identified is found in the fact that the party to write up the assessment report is itself the business operator or the one who is planning to work out the business plan. This structure translates into placing an order with an agent for EIA report. The reporting job may br subcontracted to the agent at a cost far below the rate specified in the 'Standard for Estimate of Agency Fee for Environmental Impact Assessment.' This practice also causes the vicious circle of producing a report that is written to justify the project or business in question or it leads to rough-and ready and poor documentation to minimize the time required. Second, in order to achieve the goal of the plan or business, which is the target of EIA, the local residents tend to ve regarded as an obstacle. This means elimination of the local people from participating in the EIA or their opinion being frequently ignored. This is the seed of distrust and hostility that sometimes provoke disagreements or fierce conflicts. The first proposal to improve these problem is to improve the factors that cause poor documentation of the assessment report as well as improve the understanding of the EIA system. This study proposes the following measures for improvement. The agency cost for EIA should be paid by the business operator or a third party that can ensure faithful implementation of the payment. A system should be established to verify transparent estimation of the agency cost. In order to enhance the professional quality of EIA agents, there should be implementation of qualification test for industrial engineer of related engineers in addition to the current EIA Qualification Test. The second proposal for improvement is to improve the citizen participation process by instituting a legal framework to make clear the purpose of the briefing session for local residents, which is held as a procedure of EIA, and to ensure more positive publicity during the stage of listening to the opinion of the local community. For a smooth and rational communication process, a moderator and a communicator of opinion, as is the case in a public hearing, could be instituted to clearly get the purpose of the briefing session across to the residents and to help to carry out the explanation and Q & A sessions according to the categories of the opinion of the residents. At present, the notification of the public inspection of the draft of the assessment report and briefing session for the residents is made on the newspaper and internet network. But some people have difficulty with access to this method of announcement. A higher participation rate could be secured if a legal provision is added to specify putting up placards in specific places such as the entrance to the place for the briefing session for residents or the building of administrative agencies of the area concerned.