A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

Problem Analysis and Improvement Scheme Based on Questionnaire Survey to Design VE Status for Apartment Buildings (공동주택 설계VE 현황 설문조사를 통한 문제점 분석 및 개선방안)

  • Kim, Young-Hoon;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.51-58
    • /
    • 2010
  • The purpose of this study is to analyze problems and suggest improvement scheme based on questionnaire survey to design VE status for apartment buildings. For this study, the adapted research methods are case studies of design VE to construction companies and questionnaire survay to design staffs. The results of this study are as follows: 1) In the system aspect, the problems of design VE for apartment buildings are insufficiency of regulation and difficulty of performing design VE actively. In the performance aspect, the problems is absence of design VE procedure suited to apartment buildings. 2) In the system side, the improvements of design VE for apartment buildings include regulatory enlargement of design VE application for apartment buildings and rearrangement of VE incentive system for design staffs. In the performance side, a VE procedure suited to apartment buildings is developed and suggested.

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.

A Study on the Hindrance Factors of the Productivity in Design VE Phase (설계 VE단계에서 발생하는 생산성 저해요소 분석 - '00공사 사옥 신축공사' 사례를 중심으로 -)

  • Choi, Ji-Hye;Sang, Jun;Kim, Ban-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.178-179
    • /
    • 2013
  • After the introduction of the design VE system in 1990s, based on the legal system has made a rapid growth. Also It is evaluated as qualitative growth. Despite this growth, VE effort can cause the occurrence of the risk. In this paper carried out to hindrance factor that decrease the productivity in VE phase for strategy to improve the utilization of basic data.

  • PDF

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

Application of Partnering to Design VE to Public Design-Build Projects (공공부문 일괄입찰사업의 설계VE 파트너링 활용방안)

  • Kim, Hae-Gon;Um, Ik-Jun;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.110-118
    • /
    • 2006
  • Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.

Process Development and Verification for Construction VE Object Selection of Performance-Oriented (성능중심의 건설VE 대상 선정 프로세스 개발 및 검증)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2012
  • The current VE activity is recognizing the VE object selection in job-plan simply as formal procedure. Therefore, many problems are happening in the process of selecting VE object during the preparatory stage. As a result of trying to analysis problems through literature review and expert interview, the problems were surveyed such as the lack of connectivity between preparatory stage and analytical stage, the temporal cost-based restrictions, and lack of recognition in VE team members in the existing method of selecting subjects centering on the high-cost field. Accordingly, this study suggested the improved method of selecting VE objects in order to solve this problem in the stage of selecting VE objects. An improvement method of selecting VE objects is what selects the secondary VE subjects by applying again Fish-Bone diagram and Worth technique based on the primary VE objects, which were selected by the conventional technique of selecting objects in the high-cost field. To verify effectiveness in the proposed improvement method, it tried to apply it to the actual case of the road construction VE project. As result of, the improvement method was analyzed to be considerably effective in comparison with the existing selection method of VE objects. Therefore, the Improvement method will contribute to increasing the VE performance.

Vitamin E Modulates Radiation-induced Oxidative Damage in Mice Fed a High-Lipid Diet

  • Shin, Sung-Jae
    • BMB Reports
    • /
    • v.36 no.2
    • /
    • pp.190-195
    • /
    • 2003
  • The Vitamin E (VE) effect was examined on oxidative damage to DNA, lipids, and protein in mice that were fed various levels of lipid diets after total body irradiation (TBI) with X-rays at 2 Gy. No increase of 8-hydroxydeoxyguanosine (8OHdG) by TBI was observed in the +VE group; however, in the case of the -VE group, a significantly higher 8OHdG level was observed in the high-lipid group than in the low- or basal-lipid group. In the groups with TBI, the concentration of thiobarbituric reactive substances (TBARS) only significantly increased in the high-lipid (-VE) group. These changes in TBARS, due to TBI, were not detected in other groups. The contents of protein carbonyls only increased in the (-VE) group. The contents of protein carbonyls was significantly different between the (+VE) and the (-VE) groups, regardless of the lipid levels. The concentrations of GSH, vitamins C and E in the liver were lower, and the concentration of non-heme iron in the liver was higher in the high-lipid group than in the low- and basal-lipid groups. These concentrations in the high-lipid group were significantly different between the (+VE) and the (-VE) groups. These results strongly suggest that mice that are fed a high-lipid diet are susceptible to TBI-induced oxidative damage. Also, decreases in the GSH levels and an increase in the iron level are involved in the mechanism of this susceptibility.

Analysis of Main Control Factors for Design Value Engineering Work in Construction Projects (건설 프로젝트 설계VE 업무의 중점 관리 요인 분석)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.128-137
    • /
    • 2006
  • Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effective accomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient in act of research. Therefore in this research we have suggest the standard for the effective accomplishment of design value engineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professional instruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering work through research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineering work and the following scheme and process of work efficiency optimization.

FUNCTION ORIENTED VE ALTERNATIVES EVALUATION PROCEDURE USING FUNCTION CLASSIFICATION

  • Jong-Hyeob Kim;Chang-Taek Hyun;Taehoon Hong
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1195-1200
    • /
    • 2009
  • Two important concepts in VE are "function" and "cost." Cost can be expressed quantitatively. Unlike cost, the function can only be expressed qualitatively. Thus, to accurately evaluate the performance in VE analysis, it is required that the functional aspect should be considered a qualitative one. This study suggests a procedure of function oriented evaluation which can evaluate function enhancement of a VE proposal more logically and objectively. To conduct this study, problems were induced via case analysis, and solutions were found. In addition, the existing simple evaluation procedures were corrected, and a function enhancement evaluation procedure via function classification was suggested. For function classification, the use of the concepts, which were "intended function" and "additionally obtained function," was suggested. Function oriented evaluation procedure to VE proposals which is suggested in this study is expected to be a great help in treating valuable functions through VE job plan.

  • PDF