• Title/Summary/Keyword: VDL Load

Search Result 2, Processing Time 0.255 seconds

A Study on Real-time Message Analysis for AIS VDL Load Management (AIS 통신부하 관리를 위한 실시간 메시지 분석에 관한 연구)

  • Lee, Sang-Jae;Jeong, Jung-Sik;Kim, Min-Yeop;Park, Gyei-Kark
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.23 no.3
    • /
    • pp.256-261
    • /
    • 2013
  • The AIS(Automatic Identification System) has been widely used for ship safety at sea over the last 10 years. The AIS traffic load at VDL(VHF Data Link) has been continuously increased. As the traffic load at VDL increases, the quality of AIS service may be deteriorated. In the previous research, the AIS traffic has been analyzed in the major ports of Korea, and its problem due to traffic overload has been suggested. However, no solutions has been given so far. In this paper, the method of autimatically controlling the VDL traffic at AIS base station is represented.

Preliminary Researches for the Deployment of New AIS-ASM Services (AIS-ASM 기반 신규 서비스 도입을 위한 선행 연구)

  • Kim, Geonung;Park, Gyei-Kark
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.7
    • /
    • pp.1515-1521
    • /
    • 2013
  • AIS is a core service in the maritime safety domain. AIS Message type #6 and #8(for binary date) can be used for carrying any kind of MSI(Maritime Safety Information). The MSC(Maritime Safety Committee) approved SN/Circ. 289 on Guidance on the use of AIS Application-Specific Messages in 2010. The MSI that carried by AIS-ASM can support to reduce the maritime accidents. Since a new AIS-ASM service places an additional load on the VDL(VHF Data Link), there should be a deployment process for new AIS-ASM services. In this paper we analyze the AIS-ASM services and survey the extended functions and systems for each AIS-ASM service. We also present the survey of the statistical analysis of local AIS messages. and suggest preliminary research topics for the deployment of new AIS-ASM services. VDL monitoring system, system for detection and removal of malfunctioning AIS equipments, and value analysis process of the MSI services are required.