• Title/Summary/Keyword: Urban plan

Search Result 1,794, Processing Time 0.023 seconds

A Study on the Type classification of Urban Architectural Assets - Focused on the Modern Architecture in Daegu Seosungro - (도시건축자산의 유형분류에 대한 연구 -대구시 서성로의 근대건축물을 중심으로-)

  • Do, Hyun-Hak
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.1
    • /
    • pp.45-54
    • /
    • 2015
  • This study is about the Type classification of architectural assets in Seosungro (one of the 4 Roads of Rampart in Junggu, Daegu), the main stronghold of Urban Regeneration projects according to the recent Urban Regeneration law. The purpose of this study is to suggest the basic data about Operation management method of Original Downtown modern buildings and valuable hanok, and Conservational Regeneration of Architectural property of Urban Environmental Improvement and Architectural assets. By researching, analysing the feature and classifying the type of the buildings in Seosungro, The type classified Conservation plan can be suggested. The Types of the Architectural assets will be the basic data of the application plan of modern buildings which is for the urban regeneration, and this can predict the quantity and the demand of the building for effective urban regeneration, and also can be an effective Urban regeneration policy data.

A Study on the Activation Plan of Village Maintenance for Public Housing Project of Local Small and Medium-Sized Cities (지방 중소도시 마을정비형 공공주택사업 활성화 방안 연구)

  • Kang, Dong-Ryeol;Ahn, Jung-Geun;Bae, Min-Cheul
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.21-32
    • /
    • 2022
  • Since the village maintenance type public housing project was introduced in 2015, the resident needs for regional revitalization and pleasant living conditions are not being met due to the poor performance of the public housing complexes that reflect the surrounding area maintenance plan (village plan) and regional characteristics. The purpose of this study is to suggest a plan to revitalize the village maintenance type public housing project in consideration of regional characteristics as a result of analyzing the needs of local residents through the problems of the village maintenance type public housing project being promoted so far and resident satisfaction. As a result of the analysis based on the public housing project implementation status analysis and resident satisfaction, the plans to activate the village maintenance type public housing project are as follows. First, in order to secure the effectiveness of the village plan, it is desirable to promote the public housing project and the village plan at the same time. It is necessary to secure a budget according to the selection of public offering projects in the village plan, such as promoting public housing projects without setbacks by prioritizing land purchases for public housing sites and establishing specialized strategies considering regional characteristics. Second, a public housing project that responds to local demand is required. The evaluation factors such as continuous promotion of the urban architecture integration plan and strengthening of regional linkage plans such as specialization of regionally tailored designs should be supplemented so that regional resources and village plans are linked with the public housing specialization plan. Third, surrounding area maintenance plan (village plan) should be secured by the strengthen of the legal status or establishing related provisions. It is also necessary to promote system improvement for area maintenance plan (village plan) when selecting a publicly funded public project.

Diagnosis of the Policy Tasks for the Execution of an Urban Regeneration Project Plan in Gangwon-do (강원도 도시재생사업계획 수립을 위한 정책 과제 진단)

  • Ham, Kwang-Min
    • Journal of Environmental Science International
    • /
    • v.30 no.5
    • /
    • pp.391-397
    • /
    • 2021
  • This study aims to establish the measures required for strengthening the internal stability of and executing the systematic plan for Gangwon-do in relation to the "urban regeneration preliminary project" launched by the Ministry of Land, Infrastructure, and Transport. The results of this study are as follows. The unit project carried out via the Gangwon-do urban regeneration preliminary project presented the tendency for the standardization of the H/W and S/W projects such as the establishment of the community anchor space and the resident competency reinforcement project. Further, rather than focusing on the contents that could objectively measure the effects of the project, it concentrated more on the performance indicators that are required for verifying the execution of unit projects like the establishment of buildings and operating programs. It was found to be insufficient with regard to the practicality of the project, the correlation with the New Deal Project, and the validity of the project contents. To improve these aspects, Gangwon-do would be required to highlight its distinguishability from the other regions and increase its practicality by operating the field-centered urban regeneration educational program, inducing the participation of experts in each of the areas in case there is a need to execute a project plan and discover a project with placeness. It also needs to focus on strengthening its connection with the urban regeneration new deal project by discovering the resident leaders and professional manpower, and establishing the performance indicators needed for systematically monitoring the regional changes in accordance to the urban regeneration preliminary project.

Optimisation of Infrastructure within the Melbourne Urban plan

  • Koorosh Gharehbaghi;Vincent Raso
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.299-303
    • /
    • 2011
  • Congestion is a growing concern of many global cities and the demands on Infrastructure services within a locale coupled by the rising expectations from the growing population places stress on these cities. This entails the ability to build a sustainable community that requires an understanding and recognition of Population growth, changing demographics and the ever changing urban development on both a macro and micro level. Infrastructure is an integral part of Australian economy, particularly the 'Infrastructure Assets Management' which highlights the importance towards the development of sustainable communities for Melbourne's future. Melbourne 2030 is a comprehensive representation of government's response to a wide-ranging population growth within Melbourne metropolitan and surrounding areas. Urban plan and specific Infrastructure Assets Planning needs not only to provide sufficient Infrastructure to a community, but it must also be efficient and innovative so that it produces an optimised management system. A system that incorporates engineering techniques that will be sustainable for decades to come by maintaining an acceptable level of services to its intended community in an effective manner, which also strengthens service delivery. The fundamental challenges for optimization of Infrastructure with the Melbourne urban plan is, the ability to manage and sustain maintenance of Infrastructure to provide the acceptable level of service required by the community in a most effective manner which also strengthens service delivery to contribute towards Melbourne 2030. This paper particularly investigates some of the fundamental issues within the Melbourne urban plan such as Infrastructure Asset Management, AusLink and the Australian Road Management Act 2004, which the Governments at all levels must deal with to provide an economically viable solution to the changing Infrastructure so it may suits the needs and services the strategies of a metropolis.

  • PDF

Analysis on the Differences of Point of View between Architect and Urban Planner on the Evaluation of International Urban Design Competition (국제설계경기 평가에서 건축가와 도시계획가의 관점차이 분석)

  • Lee, Sangho;Leem, Yountaik;Jeon, Jong Nyoung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.7
    • /
    • pp.417-431
    • /
    • 2013
  • During the development process of mega-project, individual buildings including skyscrapers are built following the master plan. It is not a difficult thing to see the gap of standpoint between the urban planners and architects on the project. This study aims to analyze the difference between architect and urban planner's point of view in evaluating international design competition works which the internationally distinguished honorable design companies(SOM, Jerde Partnership, Studio Daniel Libeskind, Foster+Partners and Asymptote Architecture) submitted as the ideas of Yongsan International Business District Design. Furthermore, we made an attempt to quantify the weight of each factors of urban design by each group. Architect and urban planner's viewpoint were revealed with seven architects and seven urban planners evaluating the international design competition works through AHP(Analytical Hierarchy Process). AHP structure was made of two step hierarchy in terms of Master Plan and Landmark Tower. Eight evaluation criteria were set up such as the concept, land use, transportation, feasibility of Master Plan and the concept, location, functional efficiency and aesthetic beauty of Landmark Tower. Results show that Architect have different point of view from that of urban planner. While the architect's weight of evaluation criteria is on the Landmark Tower(0.505), urban planner's weight is on Master Plan(0.642). Feasibility, the location of Landmark Tower and land-use are very important evaluation criteria to architect and urban planner in common. Functional efficiency of Landmark Tower is in architect's favour and transportation is in urban planner.

The Study on University Campus Master Plans In Urban Area - Focusing on D & K University Case Study - (도심에 위치하는 대학캠퍼스 마스터플랜에 관한연구 - D/K대학의 사례를 중심으로 -)

  • Kim, Jin-Mo;Cho, Sung-Yong;Choi, Jin-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.1
    • /
    • pp.3-10
    • /
    • 2011
  • Recently, an active relation between the University and city has become an issue of increasing importance in the field of campus planning. Campus master plan is known as long range development plan, and is not simply an abstract drawing work but definite scaling work procedure. The purpose of this paper is to examine the planning process and relation between university and the region through master plan of master plan of D University and K University which located in Seoul city. From the research which sees master plan of D universities which are presented in existing an instance and K universities master plan did the service blueprint with base and investigated. And both university currently analyzed the situation which is being placed and grasps a problem point, presented that alternative with what kind of method.

  • PDF

Daegu Urban Railroad Line No.3 Vehicle System Selecting (대구도시철도 3호선 차량시스템 선정)

  • Jeon, Bae-Un;Yoo, Je-Nam;Lee, Ung-Hee
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1105-1114
    • /
    • 2007
  • Recently the urban railroad which is under plan and construction in domestic is under consideration Light Rail Transit mostly with the alternative against excess of working expenses of Midium Rail Transit(subway), inefficient transportation problem etc. It come to a conclusion that the application of the light rail transit is proper from reserve feasibility study and approval process of Master plan in Daegu urban railroad Line No.3 Based on hereupon, carried out the detail investigation for optimum system selection which suitable for Daegu urban circumstance in process of master plan can satisfy the working expenses decided in national expenditure support project.

  • PDF

Eco-corridor Master Plan Connecting Urban Forests via the Urban Stream (도시하천(都市河川)을 이용(利用)한 도시림간(都市林間) 생태통로(生態通路) 조성(造成) 기본계획(基本計劃))

  • Kahng, Byung-Seon;Lee, Kyoo-Seock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.4 no.4
    • /
    • pp.36-45
    • /
    • 2001
  • Natural disturbances and human development can cause habitat fragmentation. Plant and wildlife can become isolated, and habitat fragmentation and shrinkage have been recognized as a key issue facing the conservation of biological diversity. However, eco-corridors can alleviate the problem by providing linkages between isolated patches. The purpose of this study is to plan the eco-corridor for connecting urban forest via the urban stream with low cost and to restore the ecosystem. The results were as follows (1) Falco subbuteo, and Dryocopus martius inhabit in the study site. They are protected species designated by Korean Ministry of Environment. Thus the study site should be preserved as urban wildlife habitat species biodiversity (2) If the biodiversity of the study site is maintained properly, the eco-corridor can be constructed with low cost.

  • PDF

Environmental Conservation and Sustainable Pusan Development Strategy (환경보전과 지속가능한 부산의 도시개발방안)

  • Hwang, Young-Woo;Song, Kyo-Ook;Yhang, Wii-Joo
    • Journal of Environmental Science International
    • /
    • v.6 no.3
    • /
    • pp.195-203
    • /
    • 1997
  • Pusan has experienced some different paths of urbanization and industrialization compared to other cities. and has faced the problem of over-saturation In enoronmental capacity. Pusan needs to fond out sustainable development strategies based on Agenda 21 by UNCED In 1992 to secure urban renewal. Therefore. Pusan's sustainable development strategies focus on the 1)research on envlronmental capacity and reasonable population accommodation 2)supp1y of basic enoronmental facilities for the human settlement 3)protection and efficient management of environmental pollution 4)saving and control of energy and other resources S)independent and stable euecution of plan based on biological relation 6)harmony between nature and urban spatial organization. In addition. these policies can be suggested along with the conclusions; First, ostablishment of green plan-muddle and long term environmental goals Included In the urban planning to reduce enoronmental deterioration and pollution. Second, computation of sustalnability Indeu the Index Is necessary to sustainable urban development, which is related with green GNP of the national level. Third, capacity estimation of nature and social environment-estimation of enoronmental capacity to the civilized area is required become an ecopolis, and is required to focus on the western area of Pusan which has high decree of potentiality.

  • PDF

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.