Journal of the Architectural Institute of Korea Planning & Design
/
v.34
no.12
/
pp.13-20
/
2018
This research is to analyze the public cases of information facilities in terms of central circulations in multi level volumes such as atrium or court which provide visual intervention between different spaces and physical connections such as bridges. Hunt Library design balances the understood pre-existing needs with the University's emerging needs to create a forward-thinking learning environment. While clearly a contemporary structure within a traditional context of the NCSU campus, the Hunt Library provides a positive platform for influencing its surroundings. Both technical and programmatic innovations are celebrated as part of the learning experience and provide a versatile and stimulating environment for students. Public library as open spaces connecting to an interactive social domain over communities can provide variety of learning environments, or technology based labs. There are many cases of the public information spaces with dynamic networks where participants can play their roles in physical space as well as in the intellectual stimulation. In the research, new public projects provide typologies of information spaces with user oriented media. The research is to address a creative transition between the reading space and the experimental links of the integration of state-of-the-art technology is highly visible in the building's design. The user-friendly browsing system that replaces the traditional browsing with the virtual shelves classified and archived by their form, is to reduce the storage space of the public library and it is to allow more space for collaborative learning. In addition to the intelligent robot of information storages, innovative features is the large-scale visualization space that supports team experiments to carry out collaborative online works and therefore the public library's various programs is to provide visitors with more efficient participatory environment.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.8
/
pp.5627-5635
/
2015
The goal of this study is to identify the main strategies through the evaluation on sustainability of urban regeneration projects in Shanghai. To achieve these goals the following specific objectives was carried out; First, 4 main sectors of Sustainability are categorized by literature review; Physical Environment, Social Economy, History Culture and Execution Management. Second, 4 cases are evaluated in terms of main sectors and main strategies are derived. Lastly, the implication and its conclusion are estimated. In conclusion. 'Mixed & high-density land use', 'Improvement in green environment', 'Induction of specific Industry and facility', 'Preservation of Regional Cultural heritage', 'Strengthen cultural identity in the Central area' and etc. are main strategies to improve sustainability of urban regeneration.
Using geospatial information in the early design phase is crucial because it requires considerable time, money, and effort. We use VWorld, part of the National Spatial Information Distribution system provided by the Korean Ministry of Land, Infrastructure and Transportation, for providing geospatial information to building designers. We provide methods to adopt VWorld geospatial information to building design and develop plugins for a BIM authoring tool to transform and construct necessary BIM data in a user-friendly format. BIM users are benefitted from extra design information supplied from sibling disciplines such as urban design. GIS users are benefited by feedback building information continuously supplied from building projects based upon standard GIS coordinates. It is clear that an architectural designer with BIM tool can save time and efforts to obtain the geospatial information related a project using the developed system as result of this research.
Journal of the Korean Recycled Construction Resources Institute
/
v.12
no.1
/
pp.63-71
/
2024
Through the development of construction technology, various construction projects such as redevelopment projects, undergrounding of roads, expansion of subways, and metro railways are being carried out. However, this has led to an increase in the number of construction projects in existing urban centers and neighborhoods, resulting in an increase in the number of damages and disputes between neighboring buildings and residents, as well as an increase in safety accidents due to the aging of existing buildings. In this study, digital data was applied to a graphics program to objectify the progress of cracks by comparing the creation of cracks and the increase in length and width through photographic images and presenting the degree of cracks numerically. Through the application of the program, the error caused by the subjective judgment of crack change, which was mentioned as a shortcoming of the existing field survey, was solved. It is expected that the program can be used universally in the building diagnosis process by improving its reliability if supplemented and improved in the process of use. As a follow-up study, it is necessary to apply the extraction algorithm of the digital graphic data program to calculate the length and width of the crack by itself without human intervention in the preprocessing work and to check the overall change of the building.
Korean Journal of Construction Engineering and Management
/
v.23
no.5
/
pp.108-116
/
2022
Started in 1989 as Public Permanent Rental Housing scheme, public rental housing lease policy is increasing target residents and supply in each government by introducing new supply types. However, public housing business entities have difficulties in expanding the supply due to cumulated deficit. The research suggested long-term public rental housing reconstruction business as a method to preserve the cumulated deficit from the previous. Minimum floor area ratio mathematical model was suggested by defining the floor area ratio of reconstruction business as minimum, since housing sales profit after reconstruction could preserve aggregated deficit, and mathematically approached by considering the traits of long-term public rental housing reconstruction. The determinant for minimum floor area ratio mathematical model comprise cumulated deficit of the existing long-term public rental housing, land size of reconstructed sale housing, housing sales price per unit area, and business cost per unit area. Minimum floor area ratio mathematical model is expected to be the milestone for supporting decision making regarding the economic part of old long-term public lease housings' reconstruction scale, and expanding housing supply within urban area.
Journal of the Korean Institute of Landscape Architecture
/
v.33
no.1
s.108
/
pp.93-108
/
2005
Fresh Kills is the largest landfill in the world located in the west side of Staten Island, New York. The landfill served as a storage area for New York City's trash for more than 50 years. After years of civilian and political pressure, state and local legislation decided its closure of landfill operation in Fresh Kills in March 2001. Soon after, Department of City Planning announced a Fresh Kills international design com-petition: 'Landfill to Landscape'. The winning entry was promised to be outline for the redevelopment of the 2,200 acre site which the size of three times Central Park. Forty-eight teams representing more than 200 offices from around world submitted proposals, from which six finalists that mostly led by landscape architects were selected. In December 2001, a jury of architects, landscape architects and city officials unanimously selected Field Operations as the winner. The plan, named Lifescape, visualizes the gradual 20-year transformation of the whole Staten Island into a 'natural lifestyle island' recognizing that Staten Island is home to coastal wetlands that shelter one of the most diverse ecosystems in the New York metropolitan area. It suggested that an ecologically reconstituted Fresh Kills could become the center of integrated parks and greenways system on the island otherwise fragmented. The project will be one of the largest and most ambitious undertakings in the metropolis in years developing a complex web of habitats and parklands on top of mountain of trash. This study tries to achieve two goals: One is to provide general explanations on the project, Lifescape, breaking down to its background, geographical context, design concepts and phased development plan. Another is to introduce the unique and innovative design approaches by Field Operations that are different from a conventional landscape architectural attitude. Since this project was well published through many magazines and newspapers, main focus will be upon aspects that differentiate this project from usual landscape projects. Conceptually Lifescape brought provocative notions on nature/culture relationship and the role of urban park as an active agency rather than just a green rest area. Also this project introduced pioneering graphics like plan collage, diagrammatic plan, phasing diagram and photo montage as vehicles conveying information, imagination and provocation. Witnessing the influence of the project gradually in the field of academic and practice in the States, this study is intended to become a constructive reference to similar landscape projects dealing with large and complex urban context in conjunction with restructure of contemporary city.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.53-62
/
2021
PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.
Choi, Hyeyoung;Lee, Sang Min;Gil, Jihye;Kim, Jung-Hwa;Park, Hee-Soung;Seo, Young-Ai
Journal of the Korean Institute of Landscape Architecture
/
v.51
no.1
/
pp.1-12
/
2023
The ongoing Yongsan Park development project began in 1988 with the development of a utilization plan for the US Army base in Yongsan after the Army relocation. This study aimed to draw implications for the Yongsan Park project by focusing on Yongsan Family Park. Among the public records of Yongsan Park and Yongsan Family Park transferred to the Seoul Metropolitan Archives, 53 major records were analyzed. The results are as follows. First, Yongsan Family Park, built on the site of the US Army golf course in 1992, was considered a part of the Yongsan Park plan and holds status as the first phase of the Yongsan Park project. Second, despite its status, Yongsan Family Park opened as a temporary park occupied by urban facilities. A design and detailed roadmap of the development process is necessary to make Yongsan Park more resilient. Third, organizing and systematizing public records is necessary because lessons learned through past park development processes can be applied to the current project. This study is meaningful since it uncovered important issues of urban planning discussed in the process of Yongsan Family Park development through a complete analysis of public records, examined the linkage between Yongsan Family Park, which was not known until now, and the ongoing Yongsan Park project, and reaffirmed the importance of park archiving for long-term development projects.
This study analyze the architectural space in the aspect of the 'Raumplan' and 'Plan Libre'. These concepts based on the 'Raumplan versus Plan Libre' exhibition in Delft University, Netherlands. It is generally agreed that the concept of 'Plan Libre' in connection with Le Corbusie architecture and 'Raumplan' related to Adolf Loos's works. that exhibition contents was focused an extent of modem architecture. But, These concepts continually influence contemporary architecture and offer diverse vision in architecture. Therefore, this study focused on the analysis that look for common element in the space through the case study and space element connection in change of the values, technical growth. This Paper reveals that Adolf Loos's Raumplan is similar to Louis I. Kahn's 'Room' concept and Ando Tadao's centrifugal space composition method In the dwelling architecture. And the concept 'Plan Libre': non-definitive formal system and the elements : column, free form screening wall is revived as formal application of 3 dimension composition in architecture. and transfer lots, void, and linear space in Rem Koolhaas's urban design projects. These aspects is so called topology. This topological concept is an attempt in view of the space connection state rather than formative viewpoint.
Early 20th century Singapore was faced with the problem of overcrowding. The attendant problems of a rapid increase in population density, namely the lack of proper housing and sanitation, resulted in the issue of an appropriate residential environment emerging as an important task in urban planning. It was necessary to construct housing estates in order to solve this issue. At that time, the British colonial government attempted to transplant modern technology into the construction process of a residential complex system. However, Singapore's climate and traditional lifestyle made it impossible to apply the British modern system in a straightforward manner, and in the process, a number of transformations emerged. With a specific focus on the Tiong Bahru estate, one of Singapore's representative public housing projects, from the 1930s through the 1950s, this study intends to look at the way in which such residential estates were assimilated into local surroundings, and the effect of the transplantation of British concepts of modern housing theory. Therefore, the study is divided into an examination of the estate both before and after the turning point of World War II. This study confirms that the difference between the pre-war and post-war planning strategies for the Tiong Bahru estate were made according to the concept of 'open space.'
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.