Journal of the Korean Institute of Landscape Architecture
/
v.32
no.4
/
pp.39-48
/
2004
In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.
The purpose of this paper is to highlight the main policies of the last half century that have shaped the urban architectural fabric of Seoul today, and explore whether a modified approach might better address the current socioeconomic conditions in Korea. The paper defines and examines urban planning in Korea through an overview of the four main urban project policies implemented in Seoul from the 1960s to the present: Land Readjustment (LR), Housing Site Development (HSD), Urban Redevelopment (UR), and Housing Reconstruction (HR). While the fundamental ideology behind these policies served well during a prolonged period of high economic growth, evidence is growing that these policies are losing steam under today's conditions. A growing legacy of stalled and incomplete urban projects from the mid-2000s-the New Town Project is an example-begs the fundamental question as to whether an alternative urban planning paradigm is needed for Korea in an age of low economic growth, low birth rates and a fossil fuel energy crisis. Through the urban morphologies of the three residential areas in Seoul developed by LR projects, this paper looks at the possibility of urban regeneration through the sustainment of urban architecture in those residential areas that have not been affected by HSD, UR, and HR.
Kim, Jae-Wook;Ryu, Han-Kuk;Son, Bo-Sik;Choi, Yoon-Ki
Korean Journal of Construction Engineering and Management
/
v.11
no.4
/
pp.41-50
/
2010
From 2000s, the development to improve space use of urban area has been requested because of unorganized urban development in 1960~70s. For this reason Urban Redevelopment projects have been changed to urban regeneration project based on the renewed law. Recent urban regeneration Projects are bigger and more complex than ever. These kinds of projects need good communication between projects stakeholders, however there are problems in processing project for the lack of standardized business process. The purpose of this study is to provide common business process of urban regeneration projects for stakeholders to improve understanding project business process through analyzing association way of urban regeneration project and modeling business process by BPMN (Business Process Modeling Notation) method. And also it is expected to improve communication between stakeholders and to shorten project time through prompting project participation with the proposed business process.
Korean Journal of Construction Engineering and Management
/
v.21
no.6
/
pp.56-65
/
2020
Urban renovation projects (reconstruction and redevelopment) have a longer licensing period than general housing projects, and many consultations with the licensing authorities require expertise. Most of the members of the union do not have basic knowledge of the maintenance business, so they have a lot of authority to promote smooth business Is entrusted to the union leader. However, contrary to the original purpose entrusted by the members, it is easy to find a case where the business is suspended because the union leader is exposed to corruption for the private interests of the union, and the members' disputes could not be resolved. In order to overcome this risk, the problem of the maintenance project was found through a questionnaire survey composed of practical experts, and a solution was presented through the KCSI evaluation model. This study mentioned the necessity of a responsible CM that can make independent business decisions without interference from the union, rather than a management-type CM limited to the cooperative's work assistance. In order to promote the construction industry's national role, it was necessary to revitalize responsible CM, so six practical alternatives were proposed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.1
/
pp.125-132
/
2012
Busan metropolitan city faced with very low completion rate of residential environment improvement projects. Main reason is to designate proposed residential environment improvement areas without careful analysis of the possibilities of the improvement project completion. This study aims to clarify and analyze the phase characteristics of residential environment improvement process by using 12 variables representing 5 locational characteristics such as place factors, topological factors, size factors, location condition factors and regulation factors. From results of the analysis, this study finds that business floor area ratio, improvement type and site size affect significantly the completion rate of residential redevelopment projects. However, business floor ratio, improvement type, width of frontage road and slope are significant variables to affect the completion rate of residential rebuilding projects.
International conference on construction engineering and project management
/
2009.05a
/
pp.856-863
/
2009
The problem of urban decay in Hong Kong has drawn much attention of both practitioners and academics. Poorly managed buildings not just give a negative image to the Pearl of the Orient in the region, but also pose potential risk hazards to the health and safety of the general public. While it is necessary to devise a comprehensive plan on redevelopment and urban planning, preserving the existing buildings to maintain their conditions for habitation can be a short-term option to safeguard quality standard. With the increasing number of ageing buildings in Hong Kong, a lot of research efforts have been devoted to managing repair and maintenance projects properly (for example those initiated and funded by the Construction Industry Institute, Hong Kong; and the current study financially supported by The Hong Kong Polytechnic University). Given the short duration and more diversified nature of work, building repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. This paper aims to provide a comprehensive analysis on the problems of running building maintenance projects. An extensive review of contemporary literature was firstly conducted, which forms a solid basis for developing an empirical study on the problems and difficulties of running building maintenance projects from the viewpoints of industrial practitioners with a view to formulating effective strategies for managing maintenance projects successfully.
Jean Renaudie was an French architect who designed many urban social housing in France, especially in the city of Ivry-sur-Seine, near Paris, with Renee Gailhoustet, co-responsible as the architect of this city, communist city from long time. He was formed as an architect by the influence of Auguste Perret and Marcel Lods, two french architects, great specialist of the structure of concrete. He formed the Atelier Montrouge with Pierre Riboulet, Gerard Thurnauer, Jean-Louis Verret, and proposed many innovative projects, based on geometrically pure forms and masses. After he joined Renee Gailhoustet, the architect of the City of Ivry-sur-Seine, as a co-responsible for the redevelopment of this ideologically communist city. His urban housing concept approached to take the function as a space to welcome the urban life of the resident, not to offer the physical provision of housing repeating the simple housing unity. He accentuated the social role of Housing project not only as the level of a personal home but also as that of an urbanism. He offered divers choice opportunity to the citizen by the urban functional complex through his efforts to make characteristic complex of urban housing, and by the consequence, the innovative result was done which ameliorated the quality of life for resident. This is an exceptional example, not only in France but even in whole over the world. But the maintenance of building against the oldness and the closing shop of inside commercial zone of Jeanne Hachette became a problem, not only that of physical amelioration but also that of spiritual conservation of the works of Jean Renaudie.
This study aims to investigate Marseille's Euromméditerranée project and provide policy implications for revitalizing domestic urban regeneration projects. First, we identify Euroméditerranée as a pivotal urban regeneration effort, executed by EPAEM-an organization fostering governance-driven project advancement through collaboration and investment from both central and local governments. This endeavor has significantly contributed to revitalizing Marseille, enriching the quality of life for its residents. Second, this urban regeneration project has the following notable features: consolidated approach with combination of full redevelopment and rehabilitation, integrated regeneration covering hardware-like physical regeneration and software-like economic, cultural, and environmental regeneration; government-type urban regeneration project structure. Finally, we suggest that policymakers should consider the economic scale in urban regeneration projects, national-level government organizations, and efficient public-private partnerships.
Proceedings of the Korean Geotechical Society Conference
/
2009.09a
/
pp.172-185
/
2009
This paper presents case histories and research projects related to geotechnical challenges at waste landfill sites in Japan. Due to the limitation of inland space available to waste disposal, coastal landfills and the associated containment systems are important considerations, particularly for metropolitan areas. Experimental works on heavy metals mobility using a large column to simulate the redox potential at the coastal landfill sites are introduced. After the closure of landfill sites, they are expected to be utilized as new land space, since new space is difficult to find in urban area. In the redevelopment of such closed landfill sites, there are possibilities of environmental risks, such as generation of toxic gas and leachate, differential settlement of the waste layer, damage to the lining system. Whether the pile installation through the clay layer acting as a landfill bottom barrier is environmentally acceptable or not has been a great concern in the redevelopment of closed waste landfill sites in particular coastal landfill sites. An analytical study to evaluate the cost-effective remedial option for a dumped waste site located along a landslide area, where cut-off wall keyed into the aquitard might elevate groundwater level and thus may not be employed, is presented.
The surroundings around subway are becoming more lively for project of CBD (an redevelopment project), however vibrations which are made through passing train cold spread buildings around. The structure-borne noise could be generated at the same time that makes people including developers and th citizens have negative viewpoint on railway. Especially, Seoul Metro 1-4 lines ar built alongside the road nearby houses and business district. That could make plenty of public resentments because of the structure-borne noise. Seoul Metro should make active alternative plans for their future urban environment projects which will be conducted. The case was Railway Facility which were conducted to minimize structure-borne noise from sharp curved track section (4 line, Sinyongsan~Ichon, R 250m). The section is adjacent to house district as near as 6.6m related with pusing international city project, the 4th urban environment project around international building, near Yongsan station. The interval of sleepers would be downsized in half with breaking existing case, and pad stiffness is reduced 4 ton from 10 ton. That makes structure-borne noise minimized because of vibrations are lowered about 19.1-23.0db. The structure above has remained for a year and a half from October, 2008, and had not any trouble to perform excellence with 80million ton rail accumulated tonnage.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.