The Design manual for adjusting the capacity and LOS of facilities has been shared in urban railways and high-speed railway stations. However, the pattern of urban railways users and those of high-speed railway users are different from each other. For an example, the high-speed railway users tend to carry voluminous luggages and the transportation disadvantaged such as children and the elderlies. Accordingly, we see that the scale of facilities and the station itself should be constructed differently. The transfer facilities in the high-speed railway stations are classified widely into walking assisting facilities and convenient facilities. We invented the concept of PME(Pedestrian Moving Equivalent) and PWE(Pedestrian Waiting Equivalent)for the spatial calculation of those who are with wheeled luggages, back packs, and children to reflect the uniqueness of users in high-speed railway stations. These equivalents have been applied to the design of the facilities to asses the new Capacity and LOS that are users' favored.
International Journal of Internet, Broadcasting and Communication
/
제14권1호
/
pp.152-161
/
2022
Recently, it is recognized as a high-cost and inefficient logistics system that increases traffic congestion and environmental problems due to an increase in traffic volume due to the activation of the online market. In order to solve inefficient problems such as unavoidable traffic congestion and environmental problems caused by the increase in traffic volume, it is necessary to develop a freight transport system technology using the existing urban railway infrastructure and freight-only urban railway. The urban subway logistics system is a logistics system that requires a combination of various technologies to solve the nationwide demand for urban logistics and road traffic problems. This paper recognized the existing traffic congestion and environmental pollution of road traffic as problems, and supplemented the contact point requirements presented above by identifying the sub-systems constituting the target system and supplementary points for each part-level contact point. In this study, as a complex system operated for one purpose by grafting various technologies, a plan is required to secure the reliability and safety of operation from various viewpoints. The results of this study can contribute to the initial configuration and basic data to solve the interface bottleneck of the urban subway logistics system to be promoted in the future.
The 21th century is carried out a rearing activity of green industries as a part of friendly echo policy for preservation of earth environment. Korean government is spreaded on a whole country to setting up a goal to a sustainable growth power of national for low carbon green growth. The recently rolling stock is received the footlights as a best friendly echo transportation of transport system of automobile, airplane, ship etc., also that is playing a big role to reduction of $CO_2$ greenhouse gas and a discharge of air pollution. This study was carried out the investigation and analysis for technology trend of the system light-weighting of a recently urban railway vehicle on commercial operating in domestic and foreign countries. As the results are proposed a short-term development technology and a long-term development technology of the system light-weighting to be developed for reduction weight of urban railway vehicle.
This paper aims to suggest the feasibility of rapid operation scheme generated in preceding study, 'A study on development of operation planning for rapid service in urban railway(An introduction)' through application it to present subway lines in Seoul Metropolitan area. In case of line 3, without the Passing Track 'Turning train outstrip mode' is the best policy. In case of line 4, with the Passing Trank 'Passing track mode' may be the best way to realize the this scheme. Also, there is feasibility in the line 1, line 5, line 6, line 7 but there is no possibility it is applied to line 2 and line 8. In conclusion, this paper is intend to suggest the possibility of rapid operation in urban railway by presenting real operation scheme, time tables and amount of power usage and the number of composing trains and variety of demand,
Nowadays, becoming wide area is going on over Seoul Metropolitan area. But urban railway, very important traffic facilities, is operated in normal operating position and it gives cause to week the function of commuting long distance. This paper is focus on studying the feasibility of rapid operation system in Seoul Metropolitan area through comparing the present state of urban railway in Seoul Metropolitan area with a case of the advanced facilities in developed country. And we develop rapid operation system in general aspect through only consideration of operation planning without improvement of facilities. Also, we come up with new concept of rapid operation system through investigation of limits of the preceding researches
This paper introduces an comprehensive monitoring and management program for implementation of a real-time monitoring system that monitors condition of urban railway AC/DC transformers, disconnecting switches, circuit breakers, regulators, and GIS (Gas Insulated Switchgear). Especially, the system is applied to diagnose the overall condition of urban railway substations by sending acquired data through an OPC server to a database, effectively storing and monitoring conditions simultaneously. The above system is a management based system and is also applicable to small-scale systems.
Block system has been used to protect trains from occupying the same section of track at the same time so that only one train is permitted in each block at a time. Domestic driving regulations on the block system is divided into two classifications, such as regular block and substitute block. If it is impossible to use this regulation, the block applied method can be applied. However, domestic urban railway administrator has established his own operation rule within the regulation. Therefore, in order to assure continuous safety of train in operation, it is necessary to strengthen the regulation as can cope with the various block systems. In this study, domestic urban railway administration's own rules are examined and the appropriate driving regulation on the block system is proposed.
DC electricity feeder system operating in the urban railway is typically a feedback circuit consisted of the contact wire and electric railway vehicle via rail. But stray current is flowed on a structure that is not part of the intended electrical circuit with respect to a given structure. This paper presents comparison analysis of field test cases based on criteria of electrolytic corrosion protection of buried metallic structures adjacent to DC traction systems. As a result of it, we confirmed that measurement methods are different from each other about the same tests. Therefore measurement methods to prevent electrolytic corrosion need to establish electrical facilities standards to be applied domestic.
Passenger safety is a primary concern of railway system but, it has been urgent issue that dozens of people are killed every year when they fall off from train platforms. Recently, advancements in IT have enabled applying vision sensors to railway environments, such as CCTV and various camera sensors. The objective of this work is to propose technical and system requirements for establishing intelligent monitoring system using camera equipments in urban transit system. We suppose the system is to determine automatically and in real-time whether anyone or anything is in monitoring area. To achieve the goal, we analyze recent image processing technologies for detection and recognition, and suggest possible direction of system development for applying urban transit system. According to the results, we expect the proposed system requirements will playa key role for establishing highly intelligent monitoring system in railway.
An urban railway power substation consists of three thyristor dual converters. Two converters are connected to up and down trolley line to supply the electric energy or feed the regenerative energy back to the distribution. When the two converters break down, the remaining converter is used in an emergency. One thyristor dual converter system (TDCS) manages the energy of two or three railway stations. If the TDCS fails, the trains stop operating. To solve the problem, this paper proposes the three parallel operation control algorithm of thyristor dual converter system using the emergency converter. The broken TDCS can be replaced by the emergency converter in other TDCS. The effectiveness of this proposed control is verified by simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.