• 제목/요약/키워드: University facility size

검색결과 349건 처리시간 0.025초

방호 시설 크기에 따른 전계강도 및 차폐 효과 비교 (Electric Field Strength and Shielding Effectiveness Comparison According to the Size of Shielding Facility)

  • 강호재;허창수;방정주;최진수;박우철
    • 한국전기전자재료학회논문지
    • /
    • 제27권4호
    • /
    • pp.221-225
    • /
    • 2014
  • In modern times, threat of high power electromagnetic wave is increasing. When the electrical grid and communication network are attacked by these high power electromagnetic wave, the whole infrastructure is paralyzed. To protect the infrastructure from these high power electromagnetic wave threat, the shielding facility that can block high power electromagnetic wave is constructed. Also shielding effectiveness evaluation about the constructed facility is important. But, because of space efficiency and saving of construction cost to construct the actual shielding facility, the shielding room wall is generally adjacent to exterior concrete structures. As space between shielding facility wall and concrete structures is very small, arranging the transmitting antenna exterior shielding facility is realistically difficult. Therefore, in this research, The shielding effectiveness measurement plan in the state of exterior narrow space of HEMP shielding facility is presented. And to apply this plan, The influence of shielding effectiveness according to the size of the shielding facility is analyzed.

다제품을 생산하는 생산설비에 대해 최적 생산용량과 외주생산계획 (Optimal Production Capacity and Outsourcing Production Planning for Production Facility Producing Multi-Products)

  • 장석화
    • 산업경영시스템학회지
    • /
    • 제35권4호
    • /
    • pp.110-117
    • /
    • 2012
  • The demand for facility used in producing multi-products is changed dynamically for discrete and finite time periods. The excess or the shortage for facility is occurred according to difference of the facility capacity size and demand for facility through given time periods. The shortage facility is met through the outsourcing production. The excess facility cost is considered for the periods that the facility capacity is greater than the demand for the facility, and the outsourcing production cost is considered for the periods that the demand for facility is greater than the facility capacity. This paper addresses to determine the facility capacity size, outsourcing production products and amount that minimizes the sum of the facility capacity cost, the excess facility cost and the outsourcing production cost. The characteristics of the optimal solution are analyzed, and an algorithm applying them is developed. A numerical example is shown to explain the problem.

중환자실 시설기준 작성을 위한 기본시설 수준 설정 연구 - 국내·외 시설기준 및 국내 종합병원 병상규모 별 시설 현황분석을 기초로 하여 (A Study to define the range of sample size for setting Intensive Care Unit(ICU) facility guidelines - Focused on analysis of guidelines and present of ICUs facilities by general hospitals size)

  • 윤형진;조준영
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제23권3호
    • /
    • pp.47-56
    • /
    • 2017
  • Purpose : This study is a basic research to establish guidelines for healthcare facility in Korean healthcare market. As a first step, it is a main purpose for making beginning point of ICU guideline to set a basic level of ICU facility size and quality by analysis current ICU facilities and existed domestic guidelines : law, criteria of healthcare insurance review and assessment service, credit of Korea institute for healthcare accreditation. Methods : First of all, the all requirements of existed guidelines are put together and summarized. The summary is compared with that of US, UK, and Australia to know its quality difference with international market. In addition, all hospitals in Korean market are classified based on total bed number and ICU bed number to know the most occupied facility size range in the market. Second of all, by comparing 15 ICUs' current setting of the public general hospital, a general condition of ICU facility would be extracted based on function, floor area per bed, services Results : 72.8% of hospitals in Korea are belonging below 500 beds hospital. Among them 200-299 beds hospitals occupied 35.3% and are shown as the most occupied hospital size. As 15 public general hospitals are analyzed, it is clear that the more bed size and services the more ICU area per bed. As a result it is sure that the 300~500 bed may be a clear line as a general ICU condition whose function and bed number relatively consistent in the range. Implications : to keep the qualified medical environment and contemporary hospital trend, the guideline as a minimum requirement keep naturally out from current healthcare settings and should reflect their limit to reconcile with the new trend in the market.

3차원 CFD 시뮬레이션을 이용한 돔형 저온저장고 개발 (Development of Dome-Type Cold Storage Facility Using 3-D CFD Simulation)

  • 양길모;고학균;홍지향
    • Journal of Biosystems Engineering
    • /
    • 제28권1호
    • /
    • pp.35-44
    • /
    • 2003
  • This study was conducted to develop proper model for cold storage facility that could of for uniform heat movement and air movement f3r green grocery and improve improper design of the existing container-type cold storage facility. For that reason, new model(dome-type) cold storage facility was developed using 3-D CFD(computational fluid dynamics) simulation. The size was 6m${\times}$6m${\times}$5m. Its size and configuration were same to simulation model. Unit cooler was designed to send cold air in 4 side ways. A dome-type cold storage facility showed uniform distributions of air temperature and velocity because cold air was forced to move down along the ceiling and the wall and then circulated to the unit cooler from the central part of the floor. Dome-type cold storage facility also showed by low wind velocity, below 1 m/s that could minimized cold damage and quality deterioration.

요양시설 규모에 따른 직원의 감정노동, 직무만족이 조직몰입에 미치는 영향 (The Effects of Emotional Labor and Job Satisfaction on Organizational Commitment in Staffs by the Size of Facility)

  • 장혜영;송은옥;서유진
    • 지역사회간호학회지
    • /
    • 제31권1호
    • /
    • pp.1-12
    • /
    • 2020
  • Purpose: The purpose of this study was to identify the factors influencing organizational commitment of staffs according to the size of long-term care facility. Methods: A cross-sectional descriptive study was designed. Data collection was conducted for a total of 315 employees in long-term care facilities located in Seoul, Gyeonggi, Gangwon, Gyeongbuk, and Chungnam. Data were collected from July 2018 to October 2018 using questionnaires which included emotional labor, job satisfaction, organizational commitment, and general characteristics. In order to confirm the differences in the size of the facility, the facilities with less than 30 beds, those with 30-99 beds, and those with more than 100 beds were analyzed. Data were analyzed using descriptive statistics, t-test, ANOVA, Mann-Whitney U test, Kruskal-Wallis H test, Pearson's correlation analysis, and multiple regression. Results: The job satisfaction and organizational commitment were significantly different according to the size of long-term care facility. Organizational commitment was influenced by 'external job satisfaction' in less than 30 beds, was influenced by 'external job satisfaction, and attentiveness to required display rules of emotional labor' in 30~99 beds, and then was influenced by 'type of job, and internal job satisfaction' in more than 100 beds. The predict variables accounted for 23.0%, 41.0%, and 34.0% of organizational commitment respectively. Conclusion: These findings show that tailored interventions should be provided depending on the size of facility in order to increase organizational commitment. In addition, organizational commitment programs should be developed by considering strategies to reduce the emotional labor and to increase job satisfaction.

개인하수처리시설 처리수의 수질 개선을 위한 응집보조제로서의 천연제올라이트 적용에 관한 연구 (A Study on the Application of Natural Zeolite as Coagulant Aid for Effluent Quality Improvement in Private Sewage Treatment Facility)

  • 최정수;주현종
    • 한국물환경학회지
    • /
    • 제28권1호
    • /
    • pp.121-128
    • /
    • 2012
  • The purpose of this study is to solve the problem of nutrient removal due to rapid hydraulic retention time (HRT) variation in small size private sewage treatment facility and to have better effluent quality by using natural zeolite as a coagulant aid. The experiments were conducted by applying different conditions of HRT, coagulant, and zeolite dosages. As an experimental result, $TBOD_{5}$, TSS, and TP removal efficiencies were 64.9%, 94.5%, and 98.8% at co-injection with zeolite. Overall removal efficiencies of $TBOD_{5}$, TSS, and TP have improved 15.7, 28.7, 6.1%, respectively. This result shows that zeolite addition could improve flocculation, increase setting velocity, and thus have better treatment. Therefore the use of zeolite as a coagulant aid can be useful in small size private sewage treatment facility, where especially extra nutrient removal is required to meet the legal standard for discharge.

물류시스템 최적화를 위한 설비배치에 관한 연구 (A Study on Facility Layout for Optimamization of Material Flow System)

  • 박세준;이영해;허선;이문환;유지용
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1998년도 추계학술대회 논문집
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

후쿠시마 원전 사고 이후 일반인의 방사선학적 안전성 확보를 위한 제염폐기물 임시저장시설 이격거리 평가 (Evaluation of Separation Distance from the Temporary Storage Facility for Decontamination Waste to Ensure Public Radiological Safety after Fukushima Nuclear Power Plant Accident)

  • 김민준;고아라;김광표
    • 방사성폐기물학회지
    • /
    • 제14권3호
    • /
    • pp.201-209
    • /
    • 2016
  • 후쿠시마 원전사고 이후 광역의 방사성 오염부지가 발생되었으며, 이에 대한 제염작업으로 인하여 다량의 제염폐기물이 발생하였다. 일본에서는 이를 보관하기 위하여 각 지역에 임시저장시설이 운영되고 있으며, 이들 시설들은 피난지시해제가 이루어진 지역의 일반인에 대하여 방사선학적 영향을 미칠 것으로 판단된다. 본 연구에서는 임시저장시설 인근에 거주하는 일반인의 방사선학적 안전성 확보를 위하여 임시저장시설 특성에 따른 거리별 공간 방사선량률 및 선량제한치를 만족하는 임시저장시설로부터의 이격거리를 평가하였다. 이를 위해 임시저장시설의 형태 및 크기, 복토 두께 등을 고려하였으며, MCNPX를 이용하여 방사선량률을 평가하였다. 복토에 의한 차폐효과는 두께가 10 cm일 때 68.9%, 30 cm일 때 96.9%, 50 cm 일 때 99.7%로 나타났다. 임시저장시설 형태에 따른 공간 방사선량률은 지상 보관형일 때 가장 높게 나타났으며, 이어서 반지하 보관형, 지하 보관형일 순으로 나타났다. 임시저장시설 크기에 따른 공간 방사선량률은 $5{\times}5{\times}2m$ 시설을 제외한 시설에 대하여 유사하게 나타났다. 이는 임시저장시설 내 적재된 제염폐기물에 의하여 자기차폐가 이루어지기 때문이다. 최종적으로 크기가 $50{\times}50{\times}2m$이고, 복토가 없는 임시저장시설의 경우, 지상 보관형의 평가된 이격거리는 14 m(최소농도), 33 m(최빈농도), 57 m(최대농도)이며, 반지하 보관형의 이격거리는 9 m(최소농도), 24 m(최빈농도), 45 m(최대농도), 지하보관형의 이격거리는 6 m(최소농도), 16 m(최빈농도), 31 m(최대농도)로 나타났다.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Cut tree approach for facility layout problem

  • ;김재복
    • 경영과학
    • /
    • 제11권3호
    • /
    • pp.55-65
    • /
    • 1994
  • Given the flow matrix, plant size and department sizes, the algorithms in this paper provide the layout with rectilinear distance. To construct automated facility design, cut tree approach is employed. A branch and bound computer code developed by Tillinghast is modifided to find the feasible fits of departments without shape distortion in the plant rectangle.

  • PDF