• 제목/요약/키워드: Unit production cost

검색결과 307건 처리시간 0.025초

부분부재고를 고려한 경제적 생산량모델에 관한 연구 (A study on the economic production quantity model with partial backorders)

  • 남상진;김정자
    • 한국경영과학회지
    • /
    • 제19권3호
    • /
    • pp.81-91
    • /
    • 1994
  • This paper is to build an economic production quantity model for situations, in which, during the stockout period, a fraction .betha.(backorder ratio) of the demand is backordered and remaining fraction (1-.betha.) is lost. This paper develops an objective function representing the average annual cost of a production system by defining a time-weighted backorder cost and a lost sales penalty cost per unit lost under the assumptions of deterministic demand rate and deterministic production rate, and provides an algorithm for its optimal solution. At the extreme .betha.= 1, the presented model reduces to the Fabrycky's model with complete backorders.

  • PDF

유전 알고리즘을 이용한 발전기 기동정지계획수립에 관한 연구 (Unit Commitment Using a Genetic Algorithm with Mew Crossover Operator)

  • 정정원;김정익
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.203-205
    • /
    • 1999
  • The unit commitment is an important problem of production scheduling which determines the generating unit to in service(on/off) during scheduling period, to meet system demand and reserve requirement at minimum cost. This paper presents an box type crossover to improve searching ability of GA, to solve unit commitment problem. Satisfactory results are obtained by GA with the proposed crossover operator.

  • PDF

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.

표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석 (An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit)

  • 신원상;김용우;이동은;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF

생산시스템이 불완전하여 재작업이 요구되는 상황에서의 최적 생산시간 결정에 관한 연구 (Determination of an Optimal Production Run Length in a Deteriorating Production Process with Rework)

  • 김창현
    • 대한산업공학회지
    • /
    • 제40권2호
    • /
    • pp.233-239
    • /
    • 2014
  • This paper presents an extended EMQ model which determines an optimal production run length in an deteriorating production process. The production process is subject to a random deterioration from an in-control state to an out-of-control state and thus producing some proportion of defective items. Defective items produced are re-processed in the rework process to convert them into non-defectives. Through the mathematical modeling, an optimal solution minimizing the average cost per unit time as well as minimum average cost are derived. Numerical experiment is carried out to examine the behavior of the proposed model depending on model parameters.

ECONOMICS OF SINGLE ANIMAL PLOUGHING IN BANGLADESH : PRESENTATION OF SURVEY RESULTS

  • Rahman, S.M.A.;Sayeed, A.;Alam, J.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제5권4호
    • /
    • pp.709-715
    • /
    • 1992
  • In this study attempts were made to identify the areas of single animal ploughing (SAP) in Bangladesh, causes of its localization and the socio-economic constraints hindering the expansion of the system. To determine the areas of single animal ploughing, 123 upazilas of 15 districts were surveyed. Of them, 16 upazilas were found heavily engaged with this system. A detailed investigation of 469 SAP and 439 double animal ploughing (DAP) farmers revealed that there was significant difference between the two systems in respect of cost of production and yield per unit of land. The benefit/cost (B/C) ratio was higher in SAP system. However, no significant difference was observed in respect of time required for ploughing, intensity of cropping, cost of implements, and cost of repairing implements (except yoke). The study recommends for expansion of SAP system in areas where buffaloes are concentrated. Fro this purpose, logistic and institutional supports need to be made available.

시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader)

  • 한예령;박희성;장철기
    • 한국건축시공학회지
    • /
    • 제9권6호
    • /
    • pp.105-111
    • /
    • 2009
  • 건설기계는 건설사업의 성공적인 수행의 중요한 요인이며, 건설기계에 소요되는 비용이 건설공사비에서 차지하는 비중은 점차 증가하고 있다. 우리나라는 표준품셈에 제시된 건설기계 시공능력 산정식을 이용하여 건설기계의 시간당 작업량을 계산하고 있다. 건설기계 성능은 개선되고 있으나 시공능력 산정식에서 활용되고 있는 요소들은 이를 반영하지 못하고 있는 실정이며 극히 부분적으로만 재 개정되었다. 본 연구에서는 건설기계 시공능력 산정식 요소 중 사이클타임에 대해서 조사하였다. 이를 위해 먼저 관련 선행연구를 분석하였고, 건설공사에 주로 사용되는 건설기계인 굴삭기와 로우더의 사이클타임을 실사하였다. 수집된 자료와 현행 표준품셈의 시공능력 산정식에 적용되는 수치를 바탕으로 시뮬레이션 프로그램인 크리스탈볼을 활용하여 건설기계의 시공능력을 산정하였다.

기능 분석에 따른 제품 원가 구조개선 알고리즘에 대한 연구 (The Algorithm of Improvement of Production cost using Function based cost estimating)

  • 서지한;이재명;나승훈
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.207-213
    • /
    • 2010
  • Now days, the marketing environment is rapidly changed. Therefore, a lot of companies try to reduce production cost. Especially, Design is a important activities in new product development. While the concepts of design for manufacturable and concurrent engineering have made significant advances in integrating the design function with other areas in the firm. There are still major gaps in timely and accurate costing information available to designers. Inappropriate design could result in high redesign cost and delay in product relation. The generation of design and improvement is a time-consuming and mentally exhaustion process. It involves combining design features to generate as many potential design as possible. As not all features combinations are feasible, decision-makers have to narrow down the potential solutions and subsequently select appropriate design for further development. This new study is composed of 3 steps aiming at the Low Cost Design of the product. The three steps are consisted that setting up the target Cost, estimating the current functional cost, the design of a unit's reviewing according to the priority of the difference between the target cost and the functional cost.

Optimal pricing and spare parts manufacturing strategy for EOL (end-of life) services

  • Kim, Bo-Won;Ko, Deok-Soo
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2005년도 춘계공동학술대회 발표논문
    • /
    • pp.938-946
    • /
    • 2005
  • We study the firm's strategy to price its products and plan the spare parts manufacturing so as to maximize its profit and at the same time to fulfill its commitment to providing the customers with the key parts continuously over the relevant decision time horizon, i.e., the production plus warrantee period. To examine the research question, we developed and solved a two-stage optimal control theory model. Our analysis suggests that if the cost to produce the spare part during the warrantee period is more expensive than that during the production period, the firm should increase its sales price gradually throughout the production period to control its sales. In addition, during the production period it is optimal for the firm to produce the spare parts more than needed so that the overproduced spare parts can be used to partially meet the demand during the warrantee period. We conducted numerical analysis to investigate the sensitivity dynamics among key variables and parameters such as inventory holding cost, unit spare part production costs, part failure rate, and parameters in the demand function.

  • PDF

해밀토니안기법을 이용한 복수어업의 참조기 최적어획량 추정 (Estimating Optimal Harvesting Production of Yellow Croaker Caught by Multiple Fisheries Using Hamiltonian Method)

  • 남종오;심성현;권오민
    • 수산경영론집
    • /
    • 제46권2호
    • /
    • pp.59-74
    • /
    • 2015
  • This study aims to estimate optimal harvesting production, fishing efforts, and stock levels of yellow croaker caught by the offshore Stow Net and the offshore Gill Net fisheries using the current value Hamiltonian method and the surplus production model. As analyzing processes, firstly, this study uses the Gavaris general linear model to estimate standardized fishing efforts of yellow croaker caught by the above multiple fisheries. Secondly, this study applies the Clarke Yoshimoto Pooley(CY&P) model among the various exponential growth models to estimate intrinsic growth rate(r), environmental carrying capacity(K), and catchability coefficient(q) of yellow croaker which inhabits in offshore area of Korea. Thirdly, the study determines optimal harvesting production, fishing efforts, and stock levels of yellow croaker using the current value Hamiltonian method which is including average landing price of yellow croaker, average unit cost of fishing efforts, and social discount rate based on standard of the Korean Development Institute. Finally, this study tries sensitivity analysis to understand changes in optimal harvesting production, fishing efforts, and stock levels of yellow croaker caused by changes in economic and biological parameters. As results drawn by the current value Hamiltonian model, the optimal harvesting production, fishing efforts, and stock levels of yellow croaker caught by the multiple fisheries were estimated as 19,173 ton, 101,644 horse power, and 146,144 ton respectively. In addition, as results of sensitivity analysis, firstly, if the social discount rate and the average landing price of yellow croaker continuously increase, the optimal harvesting production of yellow croaker increases at decreasing rate and then finally slightly decreases due to decreases in stock levels of yellow croaker. Secondly, if the average unit cost of fishing efforts continuously increases, the optimal fishing efforts of the multiple fisheries decreases, but the optimal stock level of yellow croaker increases. The optimal harvest starts climbing and then continuously decreases due to increases in the average unit cost. Thirdly, when the intrinsic growth rate of yellow croaker increases, the optimal harvest, fishing efforts, and stock level all continuously increase. In conclusion, this study suggests that the optimal harvesting production and fishing efforts were much less than actual harvesting production(35,279 ton) and estimated standardized fishing efforts(175,512 horse power) in 2013. This result implies that yellow croaker has been overfished due to excessive fishing efforts. Efficient management and conservative policy on stock of yellow croaker need to be urgently implemented.