• 제목/요약/키워드: Unit cost

검색결과 2,122건 처리시간 0.03초

Cost Allocation of Heat and Electricity on a Steam-Turbine Cogeneration (증기터빈 열병합발전에서 열과 전기의 비용배분)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • 제20권9호
    • /
    • pp.624-630
    • /
    • 2008
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, exergetic methods, and so on. On the other hand, we have proposed a worth method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied worth method to a steam-turbine cogeneration which produces 22.2 MW of electricity and 44.4 Gcal/h of heat, and then we allocated 2,578 $/h of common cost to electricity cost and heat cost. Also, we compared with various cost allocation methods. As the result, we conclude that exergy of various kinds of worth basis evaluates the worth of heat and electricity most reasonably on this system.

Cost Estimating of Heat and Electricity on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 열과 전기의 원가산정)

  • Kim, Deok-Jin
    • Proceedings of the SAREK Conference
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.351-356
    • /
    • 2008
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of heat, and then we allocated 3,150 $/h of fuel cost to electricity cost and heat cost. Also, we compared with various cost allocation methods. As the result, we conclude that exergy of various kinds of worth basis evaluates the worth of heat and electricity most reasonably on this system.

  • PDF

Cost Estimating of Electricity and Steam on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 전기와 증기의 원가산정)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • 제21권4호
    • /
    • pp.252-259
    • /
    • 2009
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of steam, and then we allocated 3,150 $/h of fuel cost to electricity cost and steam cost. Also, we compared with various cost allocation methods. As the result, we conclude that reversible work of various kinds of worth basis evaluates the worth of heat and electricity most reasonably.

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

Comparison of Care Cost Among Large Institution, Small Group-home and Independent Living Home for Disabled People (장애인거주시설 유형별 이용자 보호비용(care-cost) 비교)

  • Kang, Hee-seol;Kim, Yong-deug
    • Korean Journal of Social Welfare Studies
    • /
    • 제37호
    • /
    • pp.345-368
    • /
    • 2008
  • The purpose of this study is to compare care unit cost among large institutions, small group homes and independent living homes for disabled people. For this purpose, our study adopted cost-analysis method widely being used in the field of accounting. By the analysis on per-person and per-year unit care cost comparison, care cost of large institutions is estimated 15,000 - 20,000 thousands won, small group homes 10,000 - 11,000 thousands won and independent living homes 4,025 thousands won. By this study, discourse of 'larger size means economic efficiency' which is widely supported by politicians and bureaucrats has no grounds in the practice of Korean residential care services. This study is suggesting two folds. Firstly, small and community based homes should be preferred in the future provision policy of residential care homes for disabled people. Secondly, government grants for small community based homes should be increased to the level of amount provided on large institutions.

An optimal management policy for the surplus process with investments (재투자가 있는 잉여금 과정의 최적 운용정책)

  • Lim, Se-Jin;Choi, Seungkyoung;Lee, Eui-Yong
    • The Korean Journal of Applied Statistics
    • /
    • 제29권7호
    • /
    • pp.1165-1172
    • /
    • 2016
  • In this paper, a surplus process with investments is introduced. Whenever the level of the surplus reaches a target value V > 0, amount S($0{\leq}S{\leq}V$) is invested into other business. After assigning three costs to the surplus process, a reward per unit amount of the investment, a penalty of the surplus being empty and the keeping (opportunity) cost per unit amount of the surplus per unit time, we obtain the long-run average cost per unit time to manage the surplus. We prove that there exists a unique value of S minimizing the long-run average cost per unit time for a given value of V, and also that there exists a unique value of V minimizing the long-run average cost per unit time for a given value of S. These two facts show that an optimal investment policy of the surplus exists when we manage the surplus in the long-run.

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제14권3호
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations (초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

Preventive maintenance model with extended warranty (연장된 보증을 갖는 예방보전모형)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • Recently, an extended warranty of the system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a preventive maintenance model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under basic warranty and extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. For the preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the numerical examples are presented to illustrate the purpose when the failure time of the system has a Weibull distribution.