• Title/Summary/Keyword: Unit area load

Search Result 214, Processing Time 0.025 seconds

The Estimation of Cooling Load for District Cooling in Apartment Buildings (지역냉방 공동주택 적정 냉방부하 산정)

  • Kim, Sang-Hun;Byun, Woon-Seob
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.643-649
    • /
    • 2008
  • The purpose of this study is to establish a standard for unit cooling load in central control type apartment applied district cooling. The model of unit household was selected. And the standard of coefficient of overall heat transmission, location of unit household, indoor air temperature, solar radiation & thermal conduction at window and interior load was selected, and region, expansion or non-expansion of balcony, pyeong type, azimuth, rate of window area was applied as parameter. And then cooling load simulation was performed. Based on the result of simulation, the synthetic district cooling load was presented for selecting heat source of apartment applied district cooling, and unit cooling load was analyzed according to design parameter.

  • PDF

Application of Margin of Safety Considering Regional Characteristics for the Management of Total Maximum Daily Loads (지역특성을 고려한 수질오염총량관리 안전부하량 적용)

  • Park, Jun Dae;Oh, Seung Young;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.3
    • /
    • pp.351-360
    • /
    • 2014
  • The allocation of margin of safety (MOS) at a uniform rate to all areas of the unit watershed makes it very difficult to keep the load allotment stable in the area for lack of reduction measures like forest land. This study developed an equation to calculate margin of safety differentially according to the regional characteristics. The equation was formulated on the basis of the regional characteristic factors such as a load contribution factor for land use type and a site conversion factor for the unit watershed. The load contribution factor represents a contribution of loads from a particular land use. The site conversion factor was derived from the site conversion ratio of a unit watershed. Margin of safety for the non-point pollution load in the land use sector decreased by 20~25% in three river basins. The margin of safety in the unit watersheds with low site occupation ratios decreased in high rate, while in the unit watersheds with large urban area decreased in low rate. With the application of the differential margin of safety considering regional characteristics, not only the reduction of pollution loads can become lighter but also it can be easier to develop plans for Total Maximum Daily Loads (TMDLs) even where the reduction measures are not available.

Analysis of Unit Pollution Load on Highway runoff (고속도로 노면 강우유출 오염부하 원단위 산정)

  • Kang, Hee-Man;Lee, Doo-Jin;Bae, Woo-Keun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.1
    • /
    • pp.55-68
    • /
    • 2012
  • Impervious surface increase due to urbanization, one of the leading causes of pavement increased the runoff coefficient, peak flow, and reducing the infiltration flow and thereby causing flooding and river erosion is occurring in aquatic ecosystems are known to impair. This study aimed to classify use type of detailed land into the road, reststop, tollgates and etc. focused on major domestic highways, to understand the characteristics of rainfall runoff pollutants and to calculate applicable unit pollution load. Because of high runoff coefficient and short travel time to drainage. first flush occurred clearly. Average EMCs of runoff in the highway was investigated as TSS 108.47 mg / L, COD 28.16 mg / L, BOD 13.61 mg / L, TN 6.38 mg / L, TP 0.03 mg / L, Cu 118.17 ${\mu}g$ / L, Pb 345.3 ${\mu}g$ / L, Zn 349.47 ${\mu}g$ / L. Unit pollution loads calculated by detailed land use area of highways based on average annual rainfall, EMCs, applicable basin areas and etc. were 46.6 kg/km2/day of BOD, 1.4 kg/km2/day of TP, 8.81 kg / km2/day of TN and these were BOD 50.8%, TP 66.7%, TN 64.4%in comparison of the unit pollution loads which applies fallow land standards of the TMDL(Total Maximum Daily Load). It was considered that discharged loads can be excessively calculated in case highway non-point management plans based on unit pollution load of the current land standard.

Development of Odinary GIS and Database for Calculation of Pollutant Load in Rural Areas (농촌유역의 오염부하량산정을 위한 범용적 GIS 및 데이터베이스의 구축)

  • Yang, Young-Min;Kwun, Soon-Kuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.460-465
    • /
    • 2001
  • Pollutant load using unit load method is calculated by simply equation, especially, very useful in the area that didn't exist about water quality data. However, it takes long time to calculate pollutant load with area in which there is various pollutants and if the boundary of a basin altered, the work of calculation about pollutant load must be begun from the first again. Therefore, a Total Daily Load Program(TDLP) was developed to calculate pollutant load automatically in rural area. The TDLP includes a geographic information system(GIS), relational database system(RDBS), User Interface. This Program can provide user with creating a boundary of the basin that user is concerned with to satisfy the water quality regulations and calculating daily load for various pollutants. The effort was conducted to apply the developed TDLP to calculating pollutant load in rural basin called Bok-ha river.

  • PDF

Characteristics of Non-point Pollutant from Highway Toll Gate Landuse (고속도로 영업소지역에서의 비점오염물질 유출특성)

  • Lee, Eun-Ju;Son, Hyun-Geun;Kang, Hee-Man;Kim, Lee-Hyung
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.185-192
    • /
    • 2007
  • Newly constructed road is a requisite to be able to carry out BMPs (Best Management Practices) under TMDL(Total Maximum Daily Load) program of the Ministry of Environment. BMPs require pollutant source control during road construction and wash off reduction plan as well as maintenance practices subsequent to construction on the purpose of discharging the minimum wash off non-point source pollutants. The objective of this study is to provide supportive discharged data in evaluating the discharged non-point pollutant load from a highway toll gate area. It can be applied to manage non-point source pollutants on roads. The results validate the first flush phenomenon that it is known to be one of the wash off characteristics in paved area. In addition, the load per unit area and load per unit rainfall duration applying EMC are calculated. The mean load per unit rainfall duration is assessed to be $533.7mg/m^2-hr$ for TSS, $396.2mg/m^2-hr$ for COD, $17.0mg/m^2-hr$ for TN, and $4.8mg/m^2-hr$ for TP. These results show the unitload taken from monitoring are higher than the unit load suggested in the TMDL. It is important to adopt real pollutant unit for road to be able to perform BMP successfully.

  • PDF

Unit-load Method for the Estimation of Non-point Pollution Loads by Subcategorizing the Land-use Category Reflected in the National Land Register Data : A Case Study of Kyeongan Watershed in South korea (경안천 유역 지적공부에 나타난 특정지목의 토지이용 특성 세분화를 통한 비점오염 부하량 산정 개선방안)

  • Lee, Bum-Yeon;Lee, Chang-Hee;Ha, Do;Lee, Su-Woong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.598-607
    • /
    • 2010
  • One of constraints in the application of unit-load method to estimate non-point pollution loads in the total water pollutant load management system (TWPLMS) is the limited numbers of applicable unit-loads. Since only 7 unit-loads are currently available for total 28 land-use categories in the national land register data, each unit-loads inevitably have to represent several land-use categories regardless of their actual land coverage characteristics. As a way to minimize the problem, this study suggested a nested application of the available unit-loads based on the analysis of high resolution aerial images taken in the Kyeongan watershed. Statistical analysis of three selected land-use categories such as school, apartment complex, and golf course showed that there exit significant (95% confidence level) relationships between the registered land-uses and actual land coverages. The school and apartment complex currently considered as 100% ground have only 65% and 80% of ground characteristics, respectively. Golf course, which is considered as 100% pasture, has about 5% of ground area. This indicates that the unit-load method using in TWPLMS can give over estimated non-point pollutant loads for the school and apartment complex (19.8~54.4%) but under estimation for the golf course (80.9%).

Characteristics and Unit Load of Pollutants at a Paddy Field Area with Large-Scaled Plots (대구획 광역논에서의 오염부하특성과 원단위)

  • Kim, Kyu-Seong;Kim, Jin-Soo;Oh, Seung-Young;Yoon, Chun-Gyeong
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.390-393
    • /
    • 2001
  • Mass balance and unit load of pollutants were investigated at paddy field area during irrigation periods in 1999 and 2000. The amounts of irrigation water during irrigation periods were 3,690mm in 1999 and 3,160mm in 2000. The concentration of surface outflow is not so high as that of irrigation because 44% of irrigation water discharge without entering the paddy plots. The unit loads of pollutants during irrigation periods were estimated 19.2kg/ha for T-N, 0.29kg/ha for T-P and 47.5kg/ha for COD.

  • PDF

A Study of GIS-based Estimation of Pollutant Loads in Accordance with Spatial Landuse Variation - Focussing on Wangsook Watershed - (토지이용의 공간적 다양성에 따른 GIS 기반 오염부하 산정에 관한 연구 - 왕숙천 유역을 중심으로 -)

  • Kim, Kyoung-Soon;Kim, Kye-Hyun;Kwon, Oh-Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.305-315
    • /
    • 2005
  • The scheme to classify pollution sources in Korean TMDL planning has been pointed out too much complex to implement practically because of requiring a wide range of items to be collected from a field. Within a deficient situation to collect field data, the mathematical scheme that focuses only on counting an uniform area ratio of the different land uses to estimate of pollutant loads from individual sub-catchments has been used without taking into account of the spatial characteristics of major land uses as well as the locations of pollution sources in each sub-catchment. It would cause to significant level of errors to estimate the pollution loads. Therefore, this study proposes a renovated scheme that can be adopted more easily to classify pollution sources in the watershed and reduce the estimation errors in the spatial distribution of pollution sources by introducing a spatial analysis based on digital land cover maps. In order to estimate a unit area to calculate the uniform pollution load, the pollution response unit area that is locating spatially at the same place and having same land use is identified through the application of GIS overlay technique. Unlikely existing conventional method to calculate the pollution load based on equal distribution of pollutants for each administrative boundary, it is assumed that the pollution load from household and livestock sources are generated and washed off from only residential areas. While, pollution from business population comes from commercial area and industrial load from wastewater discharge facilities are from industrial areas. From comparison of the calculated results from the existing the method and the proposed one, it is found that although the estimation of pollution load from sub-catchment in the case of the existing conventional method application results in negligible difference in total pollution amounts from the whole area of Wangsook watershed as a study area, significant difference of pollution load among sub-catchment in which pollution response unit areas are diverse, however, appears in the case of the application of the renovated scheme.

EP Based PSO Method for Solving Multi Area Unit Commitment Problem with Import and Export Constraints

  • Venkatesan, K.;Selvakumar, G.;Rajan, C. Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.415-422
    • /
    • 2014
  • This paper presents a new approach to solve the multi area unit commitment problem (MAUCP) using an evolutionary programming based particle swarm optimization (EPPSO) method. The objective of this paper is to determine the optimal or near optimal commitment schedule for generating units located in multiple areas that are interconnected via tie lines. The evolutionary programming based particle swarm optimization method is used to solve multi area unit commitment problem, allocated generation for each area and find the operating cost of generation for each hour. Joint operation of generation resources can result in significant operational cost savings. Power transfer between the areas through the tie lines depends upon the operating cost of generation at each hour and tie line transfer limits. Case study of four areas with different load pattern each containing 7 units (NTPS) and 26 units connected via tie lines have been taken for analysis. Numerical results showed comparing the operating cost using evolutionary programming-based particle swarm optimization method with conventional dynamic programming (DP), evolutionary programming (EP), and particle swarm optimization (PSO) method. Experimental results show that the application of this evolutionary programming based particle swarm optimization method has the potential to solve multi area unit commitment problem with lesser computation time.

Multi-Area Unit Commitment with Bilateral Contract Approach in Deregulated Electricity Market

  • Selvi, S.Chitra;Devi, R.P.Kumudini;Rajan, C.Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.3
    • /
    • pp.346-352
    • /
    • 2009
  • The eventual goal of this paper is to help the generating companies and load-serving entities to choose appropriate relative levels of interconnected system versus bilateral trades while considering risk, and economic performance. In competitive power markets, electricity prices are determined by balance between demand and supply in electric power exchanges or bilateral contracts. The problem formulation is bilateral contract incorporated into Multi-area unit commitment with import/export and tie-line constraints. This proposed method considers maximizing own profit or minimize the operating cost among the generating companies in multi-area system. The feasibility of the proposed algorithm has been demonstrated using IEEE system with four areas and experimental results shows that proposed method is reliable, fast and computationally efficient