1 |
국립환경과학원 (2006) 비점오염부하량 평가기법 연구(I) : 도로 및 대지 원단위(안)을 중심으로.
|
2 |
강혜진, 이의상 (1999) 고속도로 요금소 근무자의 근무환경 개선에 관한 연구, 한국도로공사.
|
3 |
환경부 (2010) 하수도시설기준.
|
4 |
USEPA (1994) Nonpoint sources pollution control program, U.S. EPA, Report 841-F-94-005.
|
5 |
Driscoll, E., Shelley, P., and Strecker, E., (1995) Pollutant Loadings and Impacts from Highway Stormwater Runoff, Volume I, Federal Highway Administration, Washington D.C.,
|
6 |
Schueler, T. R., (1987) Controlling urban runoff: A practical manual for planning and designing urban BMPs, Washington D.C.
|
7 |
Kayhanian, M., Suverkropp, C., Ruby, A., and Tsay, K., (2007) Characterization and prediction of highway runoff constituent event mean concentration, Journal of Environmental Management, 85, pp.279-295.
DOI
|
8 |
Bertand-Krajewski, J., Chebbo, G., and Saget, A., (1998) Distribution of pollutant mass vs volume in stormwater discharges and the first flush phenomenon, Wat. Res., 328, pp.2341-2356.
|
9 |
Charbeneau, R.J., and Barrett, M.E., (1998) Evaluation of methods for estimating stormwater pollutant loads, J. of Water Environmental Research, 70, pp.1295-1302.
DOI
|
10 |
Kim, L.H., et al., (2005) Prediction of event mean concentration and first flush effect using mass interpolation washoff model for highway runoff, Conference proceedings of 6th International Conference on Diffuse Pollution
|
11 |
Kayhanian, M., and Stenstrom, M.K., (2008) First-Flush Characterization for Stormwater Treatment, Stormwater, March-April, (www.stormh2o.com/march-april-2008/pollutants-run-off-4.aspx).
|