• Title/Summary/Keyword: Unit Cost.

Search Result 2,122, Processing Time 0.033 seconds

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Development of the Estimation Software for a Petrochemical Plant (화공플랜트 견적 소프트웨어 개발에 관한 연구)

  • Min, Bong-Ki;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

Suggestion of Allocation Methodology of Environmental Pollution Cost on Multi - Product (복합생산품에 대한 환경오염비용 배분 방법론)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.5
    • /
    • pp.311-318
    • /
    • 2009
  • In previous study, a new allocation methodology of common cost on multi-product have been suggested. The aim of this study is to suggest the methodology that allocates an environment pollution cost including carbon emission cost to each cost of multi-product. For this study, a supposed multi-energy system composed of twenty kinds of systems was made. The multi-energy system produces eighteen kinds of outputs that are electricity, steam, hot water, chilled water, ice, warm air, and cooling air from seven kinds of energy source that are LNG, coil, geothermal energy, sun heat, hydrogen, bio-mass, and waste. The new methodology was applied to the multi-energy system in order to allocate the environment pollution cost to each production cost, and twenty seven equations were induced. From this result, it is concluded that this methodology can estimate each unit cost and allocate each cost flow in any product of any energy system.

Preventive Maintenance Policy Following the Expiration of Extended Warranty Under Replacement-Repair Warranty (교체-수리보증 하에서 연장된 보증이 종료된 이후의 예방보전정책)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.14 no.2
    • /
    • pp.122-128
    • /
    • 2014
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of extended warranty under replacement-repair warranty. Under the replacement-repair warranty, the failed system is replaced or minimally repaired by the manufacturer at no cost to the user. Also, under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective. And then we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Suggestion of Power and Heat Costing for an Energy System (에너지 시스템에 대한 전력 및 열 비용산정)

  • 김덕진
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.15 no.5
    • /
    • pp.360-371
    • /
    • 2003
  • The calculation of each unit cost of productions is very important for evaluating the economical efficiency and deciding the reasonable sale price. In the present, two methods of exergy costing on multiple energy systems are suggested to reduce the complexities of conventional SPECO method and MOPSA method and to improve the calculation efficiency of exergoeconomics. The suggested methods were applied to a gas-turbine cogeneration and the unit costs of the power and the steam energy were calculated as an example. The main points of our methods are the following three. First, one exergetic cost is applied to one cycle or system. Second, the suggested equations are the internal cost balance equation and the production cost balance equation. Third, necessary states in a system are only inlet and exit states of 1ha components producing energy.

주기적 예방보전의 최적정책에 관한 연구

  • Na Myeong Hwan;Son Yeong Suk;Kim Mun Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Electricity Cost Variations subject to Nuclear and Renewable Power Portions (원자력 및 신재생에너지 발전비율에 따른 전력단가의 변화)

  • Ko Sang-Hyuk;Chung Bum-Jin
    • Journal of Energy Engineering
    • /
    • v.15 no.1 s.45
    • /
    • pp.14-22
    • /
    • 2006
  • Various pros and cons are raised as to the nuclear and renewable power portions. In order to generate scientific, objective, and comparative data, this study reviewed energy policies of some countries and derived 34 possible energy mix scenarios depending on the nuclear portion, the renewable portion and the make-up power sources. For each scenario, the unit electricity cost was calculated using the BLMP (Base Load Marginal Price) and SMP (System Marginal Price) methodology, which is currently adopted in Korean electricity market. The unit electricity cost for the current energy mix was 22.18 Won/kWh and those fir other scenarios spreaded from 19.74 to 164.07 Won/kWh excluding the transmission costs and profits of the electric utility companies. Generally, the increased nuclear power portion leads reduction in the unit electricity cost while the trend is reversed in the renewable power portion. Notable observation is that when the renewable power portion exceeds 20%, as the scenario cannot enjoy the benefit of cheap base load, the unit electricity cost at low demand time zone is increased.

Experience of Surgical Treatment through Ambulatory Care Unit (일 병원에서 통원병실을 이용한 수술적 치료의 경험)

  • Sohn, Jong-Min;Ha, Nan-Kyung
    • Quality Improvement in Health Care
    • /
    • v.8 no.1
    • /
    • pp.84-94
    • /
    • 2001
  • Background : in order to adapt to changes of the medical environm interests that is drawn in ambulatory surgery are increased as a method of approaching a patients' satisfaction and cost-effective management. The purpose of this study is to a assess the operation which is able to perform through ambulatory care unit, to identify the problem in ambulatory surgery, and to increased the opportunity of ambulatory surgery with safety. Methods : Between May 13th, 1998 and June 30th, 2000, we performed surgical treatment through ambulatory care unit, and evaluate the results of them. The sorts of operation, duration of stay in the hospital, total cost of treatment, satisfaction of patients and safety if anesthesia were assessed. Results : We performed ambulatory surgery without serve complications and the patients were satisfied with surgical treatment through ambulatory care unit. In comparison of ambulatory and admission surgery, there was a reduction of cost to 16.7~25.3% in ambulatory surgery. Also, the duration of admission was 2 days shorter than admission surgery. Conclusions : According to our results, the surgical treatment through ambulatory care unit is safe and useful method that increase the quality of medical service, satisfaction of patients and reduce the cost of treatments.

  • PDF